Introduction and Summary. This Part Ill contains two lists of projects-one for highway and bicycle/pedestrian projects and one for public transit projects. Also included is semi-technical information that describes how to print the list, followed by a description of terms used in the list (including column headers), and information on how to conta ct NIRPC.


The list of INDOT and LPA-funded non-transit projects identifies 438 projects or project phases with a total value of approximately $409 million (with federal funds of about $331 million). The list of transit projects identifies 176 projects with a projected total cost of $1.158 billion ($578 million federal).


Page Numbering. The lists of projects have their own page numbering system. The lists begin immediately following the text in this Part Ill.


  1. INDOT Sponsored Projects

  2. Local Highway-Related Projects

  3. National Park Service Projects

  4. Public Transit Projects

Page 1

Page 36

Page 52

Page 53


Printing the List of Projects. The list is formatted to print in landscape mode on sta ndard 8.5" x 11" paper.


The list was prepared in Microsoft Excel 2013. It is being forwarded (via e­ mail) to our planning partners as an independent worksheet file. A pdf version is being posted on our website. However, a copy of the Excel file will be provided to any person requesting it. Please e-mail written requests to nirpc@ nirpc.org.


Contacting NIRPC. Persons with questions, comments, or suggestions regarding this document are encouraged to contact NIRPC, either via telephone at 219.763.6060, via e-mail at nirpc@nirpc.org or comments@ nirpc.org, or over the internet at www.nirpc.org. Individuals with hearing impairments may contact us through the Indiana Relay 711 system by calling 711or (800) 743-3333.

Using the List of Projects: Types of Federal Funds. Following the list is a key to the Federal funding codes used in the TIP. The TIP programs funds from the U.S. Federa l Highway Administration (FHWA) and U.S. Federal Transit Administration (FTA).


image

Acronym

Description


CMAQ Chicago UZA

Congestion Mitigation/Air Quality Program for Lake & Porter Counties

CMAQ Mich City UZA

Congestion Mitigation/Air Quality Program for LaPorte County

FTA 5307 Chicago UA

FTA Urbanized Area Formula Grants (Chicago Urbanized Area )


FTA 5307 Mich City UA

FTA Urbanized Area Formula Grants (Michigan City Urbanized Area)

SOGR

FTA Section 5336 Rail State of Good Repair Capital Grants

FTA 5310 Chicago UA

FTA Section 5310 Program (Chicago Urbanized Area)

FTA 5339 Chicago UA

FTA Section 5339 Bus Capital Program (Chicago Urbanized Area)

100% Local

No Federal Funds Used

FHWA NHPP-lnterstate

FHWA National Highway Performance Program-Interstate

FHWA NHPP-NHS

FHWA National Highway Performance Program-NHS System

FHWA STBG (State)

FHWA Surface Transportation Program (State)

FHWA STBG Sec 130

FHWA Surface Transportation Program (State) Rail Crossing

FHWA Bridge (Local)

FHWA Bridge Program (Local) Program

FHWA Highway Safety Improvement

Program (HSIP)


Self-Explanatory

FHWA Safe Routes to Schools

Self-Ex planatory. (2012 & prior)

FHWA STBG Group I

FHWA Surface Transportation Program (Large Urban)

FHWA STBG Group II

FHWA Surface Transportation Program (Small Urban)

FHWA STBG Group Ill

FHWA Surface Transportation Program (Smaller Urban)

FHWA STBG Group IV

FHWA Surface Transportation Program (Smallest Urban/Rural)

PYB Chicago UA

Prior Year Balance Funds from SFY 2014 ( Chicago UZA)

PYB Mich City UA

Prior Year Balance Funds from SFY 2014 (Michigan City UZA)

SAFETEA-LU High Priority

Demonstration (Earmark) funds appropriated by Congress

Demo

Demonstration (Earmark) funds appropriated by Congress

TEA-21 High Priority

Demonstration (Earmark) funds appropriated by Congress

FHWA TAP (State)

FHWA Transportation Alternat ives Program (State-Controlled)

FHWA TAP

FHWA Transportation Alternatives Program (Local)


Using the List of Projects: Column Headings. Following is a brief explanation of the column headings and the type of information that is found under each.


Line: This is a sequential number assigned to each line on this report. It is subject to change as new projects are added and is useful to have (along with the print date) if you are contacting NIRPC about a particular project. This will allow us to locate the project more quickly .

DES: This is a project number assigned to projects by INDOT. It is extensively used by NIRPC and INDOT. It is very helpful to have the project's DES number when contacting NIRPC or INDOT regarding a project in the TIP. (DES numbers are also assigned to transit projects.) If the word "Pending" appears in this column, this means that a DES number has not yet been assigned to the project.


Sponsor Name: This is simply the identity of the party responsible for implementing the project. This may be INDOT, or another unit of government (such as a city, town, or county).


Route: The name of the affected street, road, or INDOT Highway route.


Work Category: The general category of work to be performed. Assigned by INDOT.


Work Type: The type of work to be performed beneath the particular category of work. Assigned by INDOT.


Location and/or Additional Details: For projects that can be identified geographically, such as roadway or bicycle/pedestrian trail projects, this field will identify the beginning and ending points of the project. Sometimes there is other information contained in this field that is thought to be helpful to the reader.


(Cost to Complete Information is provided in this field for the few projects listed for which a construction phase is not programmed.)


County: This is the primary county in which the work associated with the project will take place. In some INDOT projects the word "Various" will appear-this means that work under the project will be performed in more than one county.


DES Length: For roadway reconstruction or trail projects, the length (miles) is displayed.


Federal Fund Type: This is the federal aid program which will be used to cover project costs. Please note that some projects have multiple sources of federal aid. These are usually displayed together consecutively.


Phase Code: This is primarily for construction projects. PE means Preliminary Engineering, RW means Right of Way Services (such as title searches, abstract fees, etc.) and/or Land, Improvements, and Damages. CN refers to actual Construction, which includes the contract cost, construction engineering, and materials and inspection fees. Stand-alone planning projects carry a PE or PL phase code.


Vear: This DOES NOT refer to the calendar year. This refers to the State Fiscal Year in which the funds are expected to be obligated. Indiana's fiscal year runs from July through June. For example, State Fiscal Year 2016 will begin on July 1, 2015 and will end on June 30, 2016.

Total Cost: This is the anticipated total cost of performing the indicated phase. For projects that have multiple sources of federal aid, it will be necessary to manually compute the Grand Total cost for the particular phase.


Federal Funds: This is the anticipated level of federal aid presently allocated to the indicated project phase.


Non-Federal (Funds): This is the anticipated level of non-federal funding that is presently allocated to the indicated project phase. Non-Federal funds may include state and/or local funds.


Non-Exempt (NE} or Regionally Significant (RS}: Non-exempt projects are those that have been found to add capacity (and emissions) to the transportation network and are subject to the Federal Clean Air Act, as amended and the U.S. Environmental Protection Agency's Transportation Air Quality Conformity Regulation (40 CFR 93).


Regionally Significant projects are those which meet the standards identified in our own Regional Significance Policy, adopted in 2008.


Using the List of Projects: Other Information.


Projects are organized differently within their respective part of the lists:


Local Projects are organized by Sponsor Name.


The names of some project sponsors have been abbreviated. Following are the abbreviations (acronyms) followed by the proper name of the sponsor:


GPTC-Gary Public Transportation Corporation LaPorte-City of LaPorte (not LaPorte County)

NICTD-Northern Indiana Commuter Transportation District NIRPC-Northwestern Indiana Regional Planning Commission North-North Township Government (Lake County)

OE-Opportunity Enterprises, Inc.

Porter-Town of Porter (not Porter County)

Porter CACS-Porter County Aging & Community Services, Inc. Southlake-South Lake County Community Services, Inc.


M

2018-2021 Transportation Improvement Program for Lake, LaPorte, and Porter Counties, Indiana

Northwestern Indiana Regional Planning Commission Original All Project List March 2017



image


Row ID


Des #


Sponsor


Route


Work Category


Work Type


Location


County


Des Length


Federal Fund Type


Year


Phase


Total


Federal Funds


Non-Federal Funds


Non Exempt (NE) and/or Regionally Slgniflcant (RS)

INDltiNA DElA' RJMENT aJlRANSPOIITATIQN(t\-IDOT) ponsoreil Pro)eci,


I


0500028


District Bridge Project (Replacement)


Br Repl. Cont. Re Slab


Bridge over M J Brown Ditch.2.70 miles E of 1-65


Lake


0


STBG Slate


2018


CN


$ 1.342.000


$ 1.073.600


$ 268.400

INDOT

SR 2


2


0500480


INDOT


us 20


Added Travel Lanes Project


Added Travel Lanes,Construct Tum Lanes


US 421 to US 35/SR 212 in Michigan City


LaPorte


3.872999907


STBG Slate


2018


CN


$ 720.000


$ 576.000


$ 144.000


RS


3


0500480


INDOT


us 20


Added Travel Lanes Project


Added Travel Lanes.Construct Turn Lanes


US 421 to US 35/SR 212 in Michigan City


LaPorte


3.872999907


STBG Slate


2018


PE


$ 820.000


$ 656.000


$ 164.000


RS


4


0500480


INDOT


US 20


Added Travel Lanes Project


Added Travel Lanes.Construct Turn Lanes


US 421 to US 35/SR 212 in Michigan City


LaPorte


3.872999907


STBG State


2018


PE


$ l.182.000


$ 945,600


$ 236.400


RS


5


0500480


INDOT


us 20


Added Travel Lanes Project


Added Travel Lanes. Construct Turn Lanes


US 421 to US 35/SR 212 in Michigan City


LaPorte


3.872999907


STBG State


2018


CN


$ 8.480.000


$ 6.784.000


$ 1.696.000


RS


6


0902261


INDOT


us 12


District Bridge Project (Rehabilitation)


Bridge Deck Overlay


over Trail Creek,

0.21 miles East of

us 35


LaPorte


0


STBG State


2018


PE


$ 240.000


$ 192,000


$ 48.000


7


090226 1


INDOT


us 12


District Bridge Project (Rehabilitation)


Bridge Deck Overlay


over Trail Creek,

0.21 miles East of US 35


LaPorte


0


STBG Slate


2018


CN


$ 2.654.647


$ 2.123.718


$ 530.929


8


1006456


INDOT


PR 1078

New Road Construction Project


New Road Construction


Illiano Expressway


Lake


0


State


PE


$ -

$ -


$ -


RS/NE


9


1006456


INDOT


PR 1078

New Road Construction Project


New Road Construction


Illiano Expressway


Lake


0


Stole


CN


$ -


$

$ -


RS/NE


10


1006608


INDOT


SR 130


District lnte"ection Improvement Project


Other lnte"ection Improvement


SR 130 & CR

600N. 0.65 miles E ol Lake/Porter Co LineOO


image


Porter


0


STBG State


2018


PE


$ 50.000


$ 40.000


$ 10.000


M

2018-2021 Transportation Improvement Program for Lake, LaPorte, and Porter Counties, Indiana

Northwestern Indiana Regional Planning Commission Original All Project List March 2017



Federal Non-Federal


image

Non Exempt (NE) and/or

Row ID Des # Sponsor Roule Work Category Work Type Location County Des Length Fund Type Year Phase Total Federal Funds Funds Regionally

Significant

(RS)



11 1006608 INDOT SR 130


District Intersection


other

Intersection


SR 130 & CR

600N. 0.65 miles E


Porter 0 STBG State 2018 UTl $ 50.000 $ 40.000 $ 10.000

Improvement of Lake/Porter Co Improvement

Project

LineOO



12 1006608 INDOT SR 130

District Intersection Improvement Project


Other Intersection Improvement

SR 130 & CR

600N. 0.65 miles E of Lake/Porter Co LineOO

Porter 0 STBG State 2020 CN $ 836.186 $ 668.949 $ 167.237

13 1006608 INDOT SR 130

District Intersection Improvement Project

Other Intersection Improvement

SR 130 & CR

600N. 0.65 miles E of Lake/Porter Co LineOO


Porter 0 STBG State 2020 RR2 $ 350,000 $ 280.000 $ 70.000


District


Intersect. lmprov.

14 1006612 INDOT us 30

Intersection NHPP Non

W/ Added Turn & Randolph St Lake 0

2018 CN $ 537.000 $ 429,600 $ 107.400

Improvement

Project

Lanes

Interstate

15 1006619 INDOT SR 149

District Intersection

Improvement


Intersect. lmprov.

WI Added Turn & CR 1050N Porter 0 STBG Slate 2018 CN $ 643.000 $ 514.400 $ 128.600

Project Lanes

District

Other

16 1006622 INDOT us 20 Intersection Intersection & Waverly Rd Porter 0 STBG Slate 2018 CN $ 799,000 $ 639,200 $ 159.800

Improvement

Project

Improvement

17 1006624 INDOT us 6

District Intersection Improvement Project


other

Intersection & Meridian St Porter 0 STBG State 2018 PE $ 45.000 $ 36.000 $ 9.000

Improvement


lil 1006624 INDOT us 6


District Intersection Improvement Project


Other

Intersection & Meridian St Porter 0 STBG State 2018 CN $ 582.564 $ 466,051 $ 116.513

Improvement

District Bridge

HMA Overlay. from US 30 to US

19 1006634 INDOT SR 51 Project Lake 9.553999901 STBG Slate 2018 PE $ 15.000 $ 12.000 $ 3.000

Functional 20

(Replacement)


2018-2021 Transportation Improvement Program for Lake, LaPorte, and Porter Counties, Indiana

Northwestern Indiana Regional Planning Commission Original All Project List March 2017


image

Non Exempt

Federal Non-Federal [NE) and/or

Row ID Des # Sponsor Roule Work Category Work Type Location County Des Length Year Phase Total Federal Funds Regionally

Fund Type Funds

Significant

[RS)


District Bridge

20 1006634 INDOT SR 51 Project

(Replacement)

HMA Overlay, from US 30 to US Functional 20

Lake 9.553999901 STBG Slate 2018 CN $ 4,994,973 $ 3,995,978 $ 998,995

21 1006635 INDOT US 41

District Small Structure Project

HMA Overlay, from SR 2 N jctlo

Preventive 2.57mi S of US 231 Lake 7.372000217

NHPP Non

2018 CN $ 3, 100,000 $ 2A80,000 $ 620,000

Maintenance (135th Ave) Interstate


NB Bridge over

District Small Bridge Deck Conrail RR, NHPP

22 1006716 INDOT 1 65

Structure Project Replacement

Cenlral Ave and Lake 0 2018 CN $ 4,749,000 $ 4.274,100 $ 474,900 Ditch, 0.67 miles Interstate

N of 180/94


District Bridge

  1. 1006746 INDOT 1 94 Project

    (Rehabilitation)


    District Bridge

  2. 1006747 INDOT 1 94 Project

    Small Structure 0.86 mi E of US Pipe Lining 421

    Small Structure 1.31 mi E of US


    LaPorte 0


    LaPorte 0


    NHPP

    Interstate


    NHPP


    2018 CN $ 489,000 $ 440,100 $ 48,900

    2018 CN $ 273,000 $ 245.700 $ 27.300

    (Rehabilitation) Pipe Lining 421 Interstate


    District Bridge Bridge SR 51. SBL at Burns

  3. 1006756 INDOT SR 51 Project Replacement, Ditch (Deep Lake 0 STBG Stale 2018 CN $ 2.314,937 $ 1.851.950 $ 462.987

    (Replacement) Concrete River). 2.95 miles

    N of US 6


    District Bridge Bridge SR 51. SBL at Burns

  4. 1006756 INDOT SR 51 Project Replacement, Ditch (Deep Lake 0 STBG State 2018 PE $ 335.000 $ 268.000 $ 67,000 (Replacement) Concrete River). 2.95 miles

    N of US 6


    $ l.700.000 $ 1,360.000 $ 340,000

  5. 1006772 INDOT us 231 Dislrict Small HMA Overlay, from W Jct of SR Lake 5.556000233 NHPP Non 2018 CN Structure Project Functional 55lo US 41 Interstate



    District Bridge

  6. 1172245 INDOT us 41 Project

(Rehabilitation)


Bridge Deck Replacement

Bridge over Conrail. IHB RR.

and 4 other Lake 0 STBG Slate 2018 CN $ 1.259.000 $ 1.007.200 $ 251.800

streets, 1.95 miles

S of 1-90


2018-2021 Transportation Improvement Program for Lake, LaPorte, and Porter Counties, Indiana

Northwestern Indiana Regional Planning Commission Original All Project List March 2017



Row ID Des # Sponsor Roule Work Category Work Type Location County Des Length


Federal Non-Federal

Year Phase Total Federal Funds


image

Non Exempt (NE) and/or

Regionally

Fund Type

Funds

Slgnfficanl (RS)


29 1172430 INDOT 1 65

Added Travel Added Travel 1-65 ATL from US Lanes Project Lanes 231 to US 30

Lake 5.583000183

NHPP

Interstate

2019 PE $ 3.750.000 $ 3.375.000 $ 375.000 RS/NE

30 1173422 INDOT 1 65

District Small Bridge Deck Slructure Project Replacement


SBBridge over Conrail RR,

Central Ave and Lake 0

Ditch, 0.67 miles N of 180/94


NHPP

Interstate

2018 CN $ 4.749.000 $ 4.274 .100 $ 474.900


District Bridge

  1. 1296339 INDOT us 20 Project Bridge Painting

    (Rehabilitation}


    Bridge over Amtrak and Chandler Rd. 0.88 miles E of SR 520


    Porter 0 STBG State 2021 PE $ 50,000 $ 40.000 $ 10.000



    District Bridge

  2. 1296339 INDOT us 20 Project Bridge Painting

    (Rehabilitation}

    Bridge over Amtrak and Chandler Rd. 0.88 miles E of SR 520

    Porter 0 STBG State 2021 CN $ 572.488 $ 457.990 $ 114.498


    District Bridge Bridge over

  3. 1296364 INDOT SR 49 Project Bridge Painting Amtrak. 0.33 Porter 0

    (Rehabilitation) miles N of 1-94


    District Bridge Bridge over

  4. 1296364 INDOT SR 49 Project Bridge Painting Amtrak. 0.33 Porter 0

    (Rehabilitation} miles N of 1-94


    District Bridge Bridge over


    NHPP Non

    Interstate


    NHPP Non

    Interstate


    NHPP Non

    2018 PE $ 27.740 $ 22.192 $ 5.548

    2018 RRl $ 100.000 $ 80.000 $ 20.000

  5. 1296364 INDOT SR 49 Project Bridge Painting Amtrak. 0.33 Porter 0 Interstate 2020 CN $ 349.312 $ 279.450 $ 69.862

    (Rehabilitation} miles N of 1-94

    District Bridge Bridge over

    NHPP Non

  6. 1296364 INDOT SR 49 Project Bridge Painting Amtrak. 0.33 Porter 0 Interstate 2020 CE $ 130.000 $ 104.000 $ 26.000

    (Rehabilitation} miles N af 1-94

  7. 1296943 INDOT us 20 District Pavement Interchange US 20 at US 35/SR LaPorte 0 STBG State 2018 CN $ 647.000 $ 517.600 $ 129.400

    Project (Non-I} Modification 212


    M

    2018-2021 Transportation Improvement Program for Lake, LaPorte, and Porter Counties, Indiana

    Northwestern Indiana Regional Planning Commission Original All Project List March 2017



    Row ID Des # Sponsor Roule Work Category Work Type location County Des Length


    Federal Non-Federal

    Year Phase Total Federal Funds


    image

    Non Exempt (NE) and/or

    Regionally

    Fund Type

    Funds

    Significant (RS)


    District Bridge NB Bridge over

  8. 1296981 INDOT SR 51 Project Bridge Removal Burns Ditch. 0.55 Lake 0 STBG State 2018 CN $ 2.681.955 $ 2.145.564 $ 536.391

(Replacement) miles S of US 20

39 1296986 INDOT 1 65

District Small Structure Project


Bridge lOlsl Avenue

Replacement. over 1-65. 2.50 Lake 0

Steel miles S of US 30


NHPP

Interstate

2018 CN $ 1.472.000 $ l.324.800 $ 147.200

District Bridge

Bridge over

  1. 1296990 INDOT us 20 Project Bridge Deck Amtrak and Porter Q STBG Slate 2021 CN $ 3.756.771 $ 3,005.417 $ 751.354

    Replacement Chandler Rd. 0.88

    (Rehobililotion)

    miles E. of SR 520

    District Bridge

    Bridge over

  2. 1296990 INDOT us 20 Project Bridge Deck Amtrak and Porter 0 STBG Slate 2021 PE $ 165.000 $ 132.000 $ 33.000

    Replacement Chandler Rd. 0.88

    (Rehabilitation)

    miles E. of SR 520



    District Bridge

    Bridge over

  3. 1296990 INDOT us 20 Project Bridge Deck Amtrak and Porter 0 STBG State 2021 PE $ 250.000 $ 200.000 $ 50.000

Replacement Chandler Rd. 0.88

(Rehabilitation)

miles E. of SR 520



43 1298068 INDOT SR 2


District Pavement HMA Overlay. Project (Non-I) Functional

From l.4 mi E of

SR 4 (Burson) to LaPorte 6.80000019 l STBG Stale 2018 CN $ 8.741.000 $ 6.992.800 $ 1.748.200

us 20

  1. 1298125 INDOT us 20 District Pavement HMA Overlay. From SR 212 to SR LaPorte 4.801000118 STBG State 2018 CN $ 5.333.000 $ 4.266.400 $ l.066.600 Project (Non-I) Functional 39

  2. 1298128 INDOT us 20 District Pavement HMA Overlay, From SR 39lo SR 2 LaPorte 7.74300003 l STBG Stale 2018 CN $ 7.642.000 $ 6,113,600 $ l.528.400 Project (Non-I) Functional

46 1298302 INDOT SR 2

District Intersection Improvement Project


Intersection SR 2 al CRlOOS.

Improvement. 4.32 mi. W of US Porter 0 STBG Slate 2018 CN $ l.325.000 $ l.060.000 $ 265.000

Roundabout 30

Added Travel

From l.48 mi. S of

47 1298309 INDOT us 41 District Small Lanes. Construct US 30 (82nd Lane) Lake 0.657999992 NHPP Non 2018 CN $ 2.700.000 $ 2.160.000 $ 540,000

Structure Project

Turn Lanes

lo 0.83 mi. S of US Interstate

30 (77th Ave.)

Page 5 Page s


2018-2021 Transportation Improvement Program for Lake, LaPorte, and Porter Counties, Indiana

M Original All Project List March 2017



Federal Non-Federal


image

Non Exempt (NE) and/or

Row ID Des # Sponsor Roule Work Category Work Type location County Des Length

Fund Type

Year Phase Total Federal Funds Funds Regionally

Slgniflcanl

(RS)



48 1298312 INDOT SR 2

District Intersection Improvement Project


District Pavemenl


Other SR 2 at CR 500W.

Intersection 6.79 mi. W of US Porter 0 STBG State 2018 CN $ 530.000 $ 424.000 $ 106.000

Improvement 30

Intersect. lmprov. US 20 at CR

49 1298313 INDOT us 20 W/ Added Turn 400W. 1.44 mi. E LaPorte 0 STBG State 2018 CN $ 1.235.770 $ 988.616 $ 247.154

Project (Non-I)

Lanes of US 35

50 1298316 INDOT us 6

District Intersection Improvement Project


Intersect. lmprov. US 6 al Calumet

WI Added Turn Rd.. 0.48 mi. E of Porter 0 STBG Stale 2018 CN $ 646.859 $ 517.487 $ 129.372

Lanes SR 49

District Bridge

Bridge Thin Deck

Bridge over EJ&E RR. Conrail RR.

51 1298397 INDOT us 12 Project and Carey SI.. Lake 0 STBG Slate 2018 CN $ 3.086.000 $ 2,468,800 $ 617.200

Overlay

(Rehabilitation)

l.33 mi W of SR

912

District Bridge

Bridge Pedestrian

  1. 1298398 INDOT us 12 Project Replacement. walkway over US- Lake 0 STBG Slate 2018 RW $ 50.000 $ 40.000 $ 10.000

    Other 12. 0.83 mi W of

    (Replacement)

    Construction SR 912

    District Bridge

    Bridge Pedestrian

  2. 1298398 INDOT us 12 Project Replacement. walkway over US- Lake 0 STBG Stale 2018 UTl $ 102.600 $ 82.080 $ 20.520

    Olher 12. 0.83 mi W ol

    (Replacement)

    Construclion SR 912

    Dislrict Bridge

    Bridge Pedestrian

  3. 1298398 INDOT us 12 Project Replacement. walkway over US- Lake 0 STBG State 2020 CN $ l.139.868 $ 911.894 $ 227.974

Other 12. 0.83 mi W of

(Replacement)

Construction SR 912

District Bridge

Bridge Deck

Bridge over CSX

55 1298402 INDOT us 20 Project RR. l.3 mi. W al Porter 0 STBG State 2018 CN $ 3.257.000 $ 2,605,600 $ 651.400

Replacement

(Rehabilitation)

SR 249

District Bridge

Bridge Deck

Bridge over Conrail RR and

NHPP Non

56 1298444 INDOT us 41 Project 2361h Avenue. Lake 0 2018 PE $ 250.000 $ 200.000 $ 50.000

(Rehabilitation)

Replacement

NBL. 4.54 mi.S of SR 2

Interstate


2018-2021 Transportation Improvement Program for Lake, LaPorte, and Porter Counties, Indiana

Northwestern Indiana Regional Planning Commission Original All Project List March 2017



Row ID Des # Sponsor Roule Work Category Work Type Location County Des Length


Federal Non-Federal

Year Phase Total Federal Funds


image

Non Exempt (NE) and/or Regionally

Fund Type

Funds

Significant (RS)



District Bridge


Bridge Deck

Bridge over Conrail RR and


NHPP Non

57 1298444 INDOT us 41 Project 236th Avenue. Lake 0 2018 CN $ l.755.000 $ l.404.000 $ 351.000

(Rehabilitation)


District Bridge

Replacement


Bridge Deck

NBL. 4.54 mi. S of SR 2


Bridge over Conrail RR and

Interstate


NHPP Non

58 1298448 INDOT us 41 Project 2361h Avenue. Lake 0 2018 CN $ 1.350.000 $ 1.080.000 $ 270,000

(Rehabilitation)

Replacement

SBL. 4.54 mi.S ot SR 2

Interstate


District Bridge


Bridge Deck

Bridge over


NHPP Non

59 1298541 INDOT SR 912 Project Guthrie St.. 0.32 Lake 0 2018 CN $ l.887.000 $ l.509.600 $ 377,400

(Rehabilitation)

Replacement

mi. W of US 12

Interstate


District Bridge


Replace

Bridge over US


NHPP Non

60 1298543 INDOT SR 912 Project 12/lndustrial Lake 0 2018 CN $ l.728.000 $ 1.382.400 $ 345,600

(Rehabilitation)

Superstructure

Highway

Interstate


District Bridge


Replace

SR-912 ramp SSE


NHPP Non

61 1298544 INDOT SR 912 Project over SR-912 and Lake 0 2018 CN $ 2.884.000 $ 2.307.200 $ 576.800

(Rehabilitation)

Superstructure

US-12 WB ramp

Interstate

District Bridge

  1. 1298548 INDOT 1 80 Project


    Bridge Deck Georgia St bridge NHPP Lake 0

    2018 CN $ 1.264.000 $ l.137,600 $ 126.400

    (Rehabilitation)

    Overlay over 1-80

    Interstate

    District Bridge

    Bridge Deck Georgia St bridge NHPP

  2. 1298548 INDOT 1 80 Project

(Rehabilitation)

Overlay over 1-80

Lake 0

Interstate

2018 PE $ 158.000 $ 142,200 $ 15.800

64 1298562 INDOT US 35

District Pavement Small Structure 0.61 mi. S of US-20 Project (Non-I) Main! and Repair (35-46-204.30)

LaPorte 0 STBG State 2018 CN $ 266.335 $ 213.068 $ 53.267

65 1298566 INDOT SR 55

District Small Small Structure 1.03 mi. S of US- Structure Project Main! and Repair 231

Lake 0 STBG State 2018 CN $ 510.000 $ 408,000 $ 102.000


201S-2021 Transportation Improvement Program for Lake, LaPorte, and Porter Counties, Indiana

Northwestern Indiana Regional Planning Commission Original All Project List March 2017



Row ID Des # Sponsor Roule Work Category Work Type Location County Des Length


Federal Non-Federal

Year Phase Total Federal Funds


image

image

Non Exempt (NE) and/or Regionally

Fund Type

Funds

Slgnmcanl (RS)


66 1298567 INDOT 1 65

District Small Small Structure Structure Project Pipe Lining

Small structure over little

Calumet River. Lake 0

0.17 mi N of I- 80/94


NHPP

Inter.tale


2018 CN $ 570.000 $ 513.000 $ 57.000


  1. 1298621 INDOT us 30 District Small Small Structure 0.02 mi. E ol SR-53 Lake 0 NHPP Non 2018 CN $ 660.000 $ 528.000 $ 132.000

    Structure Project Maint and Repair Inter.fate


    l.56 mi E. of US 41

    us us

  2. 1383250 INDOT us 12 District Pavement HMA Overlay, (Schrage Ave) to Lake 3.246000051 NHPP Non 2018 PE $ 10.000 $ 8.000 $ 2.000

    Project (Non-I) Functional 12 & 20 Jct Interstate

    (Columbus Dr)


    l.56 mi E. of US 41

    us us

  3. 1383250 INDOT us 12 District Pavement HMA Overlay. (Schrage Ave) to Lake 3.246000051 NHPP Non 2018 CN $ 2.120.000 $ l.696.000 $ 424.000

    Project (Non-I) Functional 12 & 20 Jct Inter.fate

    (Columbus Dr)


    l.56 mi E. of US 41

    us us

  4. 1383250 INDOT us 12 District Pavement HMA Overlay. (Schrage Ave) to Lake 3.246000051 NHPP Non 2018 PE $ 180,000 $ 144,000 $ 36.000

Project (Non-I) Functional 12 & 20 Jct Interstate

(Columbus Dr)



71 1383583 INDOT SR 49

District Pavement HMA Overlay. From SR 8 to US Project (Non-I) Functional 30


Porter 8.751000404 STBG State 2019 PE $ 450.000 $ 360,000 $ 90.000



72 1383583 INDOT SR 49

District Pavement HMA Overlay. From SR 8 to US Project (Non-I) Functional 30

Porter 8.751000404 STBG State 2019 CN $ 5,537,477 $ 4,429.982 $ 1.107,495

  1. 1383614 INDOT us 20 New Interchange New Interchange at SR 2 LaPorte 0 STBG State 2019 CN $ ll.748.000 $ 9,398.400 $ 2.349,600 Project Construction

    lnter.ection Intersection Intersection of SR

    NHPP Non

  2. 1383615 INDOT SR 55 Improvement Improvement. 55 and 73rd Ave.. Lake 0 Inter.late 2019 RW $ 500.000 $ 400.000 $ 100,000 Project Roundabout l.O mi N of US 30

    Intersection lnter.ection Intersection of SR

    NHPP Non

  3. 1383615 INDOT SR 55 Improvement Improvement 55 and 73rd Ave.. Lake 0 Interstate 2019 UT2 $ 120.000 $ 96.000 $ 24.000

Project Roundabout l.O mi N of US 30


Page s Page s


M

2018-2021 Transportation Improvement Program for Lake, LaPorte, and Porter Counties, Indiana

Northwestern Indiana Regional Planning Commission Original All Project List March 2017




Row ID


Des #


Sponsor


Route


Work Category


Work Type


location


County


Des Length


Federal Fund Type


image



Total


Federal Funds


Non-Federal Funds


Non Exempt (NE) and/or Regionally Slgnlncant (RS)


Year


Phase


76


1383615


INOOT


SR 55


Intersection Improvement Project


lnte,.ection Improvement. Roundabout


Intersection of SR 55 and 73rd Ave.,

1.0 mi N of US 30


Lake


0


NHPP Non

Interstate


2020


CN


$ 1.996.000


$ 1.596.800


$ 399.200


77


1383615


INDOT


SR 55


lnte,.ection Improvement Project


Intersection Improvement. Roundabout


Intersection of SR 55 and 73rd Ave..

1.0 mi N of US 30


Lake


0


NHPP Non

lnte,.tate


2020


CE


$ 170,000


$ 136.000


$ 34.000


78


1383631


INOOT


us 6

Intersection Improvement Project

Intersection Improvement. Roundabout


lnte,.ection of US 6 and SR 2


LaPorte


0


NHPP Non

Interstate


2018


PE


$ 5.000


$ 4.000


$ 1.000


79


1383631


INOOT


us 6

lnte,.ection Improvement Project

lnte,.ection Improvement. Roundabout


lnte,.ec1ion of US 6 and SR 2


LaPorte


0


NHPP Non

lnte,.tote


2018


un


$ 5,000


$ 4,000


$ 1.000


80


1383631


INOOT


us 6

lnte,.ection Improvement Project

lnte,.eclion Improvement, Roundabout


lnte,.ection of US 6 and SR 2


LaPorte


0


NHPP Non

Interstate


2019


CN


$ 1.269,000


$ 1.015.200


$ 253.800


81


1383631


INOOT

us 6

Intersection Improvement Project

Intersection Improvement. Roundabout


Intersection of US 6 and SR 2


LaPorte


0


NHPP Non

lnte,.tote


2019


RW


$ 80,000


$ 64.000


$ 16,000


82


1383631


INOOT

us 6

Intersection Improvement Project

lnteection Improvement. Roundabout


lnte,.ection of US 6 and SR 2


LaPorte


0


NHPP Non

Interstate


2019


UT2


$ 35,000


$ 28,000


$ 7,000


83


1383631


INOOT


us 6

Intersection Improvement Project

Intersection Improvement. Roundabout


lnte,.ection of US 6 and SR 2


LaPorte


0


NHPP Non

Interstate


2020


CE


$ 54,000


$ 43,200


$ 10.800


84


1383633


INOOT


SR 2

Intersection Improvement Project

Other Intersection Improvement


at Hoyes-Leonorq


Porter


0


NHPP Non

Interstate


2019


CN


$ 1.234.000


$ 987.200


$ 246,800


85


1383635


INOOT


SR 2


Intersection Improvement Project


Intersect. lmprov. W/ Added Turn Lones


Intersection of SR 2 at Horse Prairie Ave. 0.25 mi W of

us 30


Porter


0


NHPP Non

Interstate


2018


PE


$ 10.000


$ 8.000


$ 2.000


86


1383635


INOOT


SR 2


Intersection Improvement Project


Intersect. lmprov. W/ Added Turn Lanes


Intersection of SR 2 at Horse Prairie Ave, 0.25 mi W of

us 30


Porter


0


NHPP Non

Interstate


2018


un


$ 10.000


$ 8.000


$ 2.000

image


M

2018-2021 Transportation Improvement Program for Lake, LaPorte, and Porter Counties, Indiana

Northwestern Indiana Regional Planning Commission Original All Project List March 2017



Federal Non-Federal


image

Non Exempt (NE) and/or

Row ID Des # Sponsor Route Work Category Work Type Location County Des Length Fund Type Year Phase Total Federal Funds Funds Regionally

Slgnmcant

(RS)



Intersection Intersect. lmprov.

87 1383635 INDOT SR 2 Improvement W/ Added Turn


Intersection of SR

2 al Horse Prairie NHPP Non

Porter 0


2019 RW $ 240.000 $ 192.000 $ 48.000

Ave. 0.25 mi W of

Project Lanes us 30

Interstate



lnlersecfion Intersect. lmprov .

Intersection of SR

2 al Horse Prairie NHPP Non

  1. 1383635 INDOT SR 2 Improvement W/ Added Turn Ave, 0.25 mi W of Porter 0 Interstate 2019 UT2 $ 90.000 $ 72.000 $ 18.000

    Project Lanes us 30



    Intersection Intersect. Improv.

  2. 1383635 INDOT SR 2 Improvement W/ Added Turn

Intersection of SR

2 al Horse Prairie NHPP Non

Porter 0

2020 PE $ 42.000 $ 33.600 $ 8.400

Project Lanes

Ave. 0.25 mi W of

US 30

Interstate

Intersection Intersect. lmprov.

90 1383635 INDOT SR 2 Improvement W/ Added Turn


Intersection of SR

2 al Horse Prairie NHPP Non

Porter 0

2020 CN $ 1.057.000 $ 845.600 $ 211.400

Ave. 0.25 mi W of

Project Lanes us 30

Interstate

Intersection lnlersect. lmprov.

91 1383635 INDOT SR 2 Improvement W/ Added Turn


Intersection of SR

2 at Horse Prairie NHPP Non

Porter 0

2020 CE $ 42.000 $ 33.600 $ 8.400

Ave, 0.25 mi W of

Project Lanes us 30

Interstate

Auxiliary Lanes.

From US 231lo

District Pavement 1.99 mi. N of US NHPP Non

92 1383695 INDOT us 41

Project (Non-I)

Two-way Left Turn Lanes

231 (93rd

Avenue)

Lake 1.998000026

Interstate

2019 CN $ 4,989 .000 $ 3.991.200 $ 997.800


District Bridge Bridge Bridge Over

  1. 1383706 INDOT SR 8 Project Replacement, Hanna Arm. 2.01 LaPorte 0 STBG Stale 2018 PE $ 77.000 $ 61.600 $ 15,400 (Replacement) Steel miW olSR 39


    District Bridge Bridge Bridge Over

  2. 1383706 INDOT SR 8 Project Replacement. Hanna Arm. 2.01 LaPorte 0 STBG Stale 2018 RW $ 30.000 $ 24,000 $ 6.000

(Replacement) Steel miW of SR 39


M

2018-2021 Transportation Improvement Program for Lake, LaPorte, and Porter Counties, Indiana

Northwestern Indiana Regional Planning Commission Original All Project List March 2017




Row ID


Des #


Sponsor


Route


Work Category


Work Type


Location


County


Des Length


Federal Fund Type


Year


Phase


Total


Federal Funds


Non-Federal Funds


Non Exempt (NE) and/or Regionally Slgnfflcant (RS)


95


1383706


INDOT


SR 8


District Bridge Project

!Replacement)


Bridge Replacement.

Steel


Bridge Over Hanna Arm, 2.01 miW of SR 39


LaPorte


0


STBG Slate


2018


CN


$


684.207


$


547.366


$


136.841


96


1383711


INDOT


us 41


District Bridge Project

!Rehabilitation)


Bridge Deck Overlay


01.20 N US-30


Lake


0


NHPP Non

Interstate


2019


CN


$


2.875 .000


$


2.300.000


$


575.000


97


1383718


INDOT


1 94


District Small Structure Project


Small Structure Pipe Lining


3.21 mi E of US 421


LaPorte


0


NHPP

Interstate


2019


CN


$


345.000


$


310.500


$


34.500


98


1383719


INDOT


us 30


District Small Structure Project


Small Structure Main! and Repair


Box Culvert near CR 325 E - WB


Porter


0


NHPP Non

Interstate


2019


CN


$


117,000


$


93.600


$


23.400


99


1383725


INDOT


us 6

Intersection Improvement Project


HMA Overlay. Functional

From SR 51 to 0.51 mi E of SR 51

!Union St)


Lake


0.514999986


NHPP Non

Interstate


2018


PE


$


50.000


$


40.000


$


10,000


100


1383725


INDOT


us 6

Intersection Improvement Project


HMA Overlay, Functional

From SR 51 to 0.51 miE of SR 51

!Union St)


Lake


0.514999986


NHPP Non

Interstate


2020


CN


$


587,898


$


470.318


$


117.580


101


1400116


INDOT


US 35

Intersection Improvement Project


HMA Overlay. Functional


Boyd to SR 2


LaPorte


2.51999998 1


STBG State


2020


CN


$


2.706 .347


$


2.165.078


$


54 1.269


102


1400204


INDOT


us 12


District Bridge Project

!Rehabilitation)


Bridge Deck Replacement


0.51 mi. W of US 20 Iliff Bridge)


Lake


0


NHPP Nan

Interstate


2019


PE


$


69.600


$


55.680


$


13.920


103


1400204


INDOT


us 12


District Bridge Project IRehobilitation)


Bridge Deck Replacement


0.51 mi.W of US 20 !Lift Bridge)


Lake


0


NHPP Non

Interstate


2019


CN


$


464 .000


$


371.200


$


92.800


104


1400287


INDOT


SR 149


District Bridge Project

!Rehabilitation)


Small Structure Pipe Lining


1.64 mi S of jct US 20


Porter


0


NHPP Non

Interstate


2018


CN


$


112.901


$


90.32 1


$


22.580


105


1401586


INDOT


us 35


District Bridge Project

!Rehabilitation)


Bridge Deck Sealing


2.45 mi S of US 6

over the

Kankakee River


LaPorte


0


STBG State


2018


CN


$


16.203


$


12,962


$


3,241


M

2018-2021 Transportation Improvement Program for Lake, LaPorte, and Porter Counties, Indiana

Northwestern Indiana Regional Planning Commission Original All Project List March 2017


image


Row ID


Des #


Sponsor


Roule


Work Category


Work Type


Location


County


Des Length


federal Fund Type


Year


Phase


Total


Federal Funds


Non-Federal Funds


Non Exempt (NE) and/or Regionally Signlflcant (RS)


106


1500081


INDOT


us 41


District Bridge Project (Rehabilitalion)

Bridge Replacement.

Other Construction


Over GTW RR.

2.80 mi N of US-30


Lake


0


NHPP Non

lnte"fate


2018


RW


$


100.000


$ 80.000


$ 20.000


107


1500081


INDOT


us 41


District Bridge Project (Rehabilitation)

Bridge Replacement, Other Construct ion


Over GTW RR.

2.80 mi N of US-30


Lake


0


NHPP Non

lnte"tate


2018


CN


$


5,275.842


$ 4.220.674


$ 1.055.168


108


1500081


INDOT


us 41


District Bridge Project (Rehabilitation)

Bridge Replacement.

Other Construction


Over GTW RR.

2.80 mi N of US-30


Lake


0


NHPP Non

Interstate


2018


PE


$


575.000


$ 460.000


$ 115.000


109


1500090


INDOT


us 12


District Pavement Project (Non-I)


Intersect. Improv. WI Added Tum Lanes


US 12(Columbus Dr) with Railroad Ave & McShane Ave 0.25mi E of US 20 (Indy Blvd)


Lake


0.056000002


NHPP Non

Interstate


2018


PE


$


123.000


$ 98,400


$ 24.600


110


1500090


INDOT


us 12


District Pavement Project (Non-I)


lnte"ect. lmprov. WI Added Turn Lanes


US 12(Columbus Dr) with Railroad Ave & McShane Ave 0.25mi E of US 20 (Indy Blvd)


Lake


0.056000002


NHPP Non

Interstate


2018


RW


$


200.000


$ 160.000


$ 40.000


111


1500090


INDOT


us 12


District Pavement Project (Non-I)


lnter>ect. lmprov. W/ Added Turn Lanes


US 12(Columbus Dr) with Railroad Ave & McShane Ave 0.25mi E of US 20 (Indy Blvd)


Lake


0.056000002


NHPP Non

Interstate


2018


CN


$


1.543.000


$ 1.234.400


$ 308.600


1500091


INDOT


SR 55


Intersection Improvement Project


lnter>ect. lmprov. W/ Added Turn Lanes


lnterseclion of SR 55 at 57th Ave.

3.0 mi N of US 30


Lake


0.108999997


NHPP Non

Interstate


2019


RW


$


100.000


$ 80.000


$ 20,000

112


M

2018-2021 Transportation Improvement Program for Lake, LaPorte, and Porter Counties, Indiana

Northwestern Indiana Regional Planning Commission Original All Project List March 2017



image


Row ID


Des #


Sponsor


Route


Work Category


Work Type


Location


County


Des Length


Federal Fund Type


Year


Phase


Total


Federal Funds


Non-Federal Funds


Non Exempt (NE) and/or Regionally Significant (RS)


113


1500091


INDOT


SR 55


lnfer5ection Improvement Project


Intersect. lmprov. W/ Added Turn Lanes


Intersection of SR

55 at 57th Ave,

3.0 mi N of US 30


Lake


0.108999997


NHPP Non

Interstate


2019


UT2


$


100.000


$


80.000


$


20,000


114


1500091


INDOT


SR 55


Intersection Improvement Project


Intersect. lmprov . W/ Added Turn Lanes


Intersection of SR

55 at 57th Ave,

3.0 mi N of US 30


Lake


0.108999997


NHPP Non

Interstate


2020


CE


$


64.000


$


51.200


$


12.800


115


1500091


INDOT


SR 55


Intersection Improvement Project


Intersect. lmprov. W/ Added Turn Lanes


Intersection of SR 55 at 57th Ave,

3.0 mi N of US 30


Lake


0.108999997


NHPP Non

Interstate


2020


CN


$


593,000


$


474.400


$


118,600


116


1500170


INDOT


JR 1001


Railroad Grade Crossing Project


Railroad Protection


CR 200S at CN RR DOT# 283306K

near Mill Creek


LaPorte


0


Sec 130


2018


CN


$


320,000


$


320.000


$


-


1 17


1500171


INDOT


IR 1001


Railroad Grade Crossing Project


Railroad Protection


Froberg Rd/150W at CN RR DOT# 283242B W of

Valparaiso


Porter


0


Sec 130


2018


CN


$


320.000


$


320.000


$


-


118


1500590


INDOT


us 41


District Bridge Project

!Rehabilitation)


Bridge Painting


Bridge over Conrail RR & 236th Ave, NBL.

4.54 mi S of SR 2


Lake


0


NHPP Non

Interstate


2018


PE


$


13.000


$


10.400


$


2.600


119


1500590


INDOT


us 41


District Bridge Project

!Rehabilitation)


Bridge Painting


Bridge over Conrail RR & 236th Ave, NBL.

4.54 mi S of SR 2


Lake


0


NHPP Non

Interstate


2018


CN


$


110.028


$


88.022


$


22.006


120


1500602


INDOT


us 41


District Bridge Project

!Rehabilitation)


Bridge Painting

Bridge over Conrail RR & 236th Ave, SBL.

4.54mi S of SR 2


Lake


0


NHPP Non

Interstate


2018


CN


$


110.028


$


88.022


$


22.006


121


1500602


INDOT


us 41


District Bridge Project

IRehabilitation)


Bridge Painting

Bridge over Conrail RR & 2361h Ave.SBL.

4.54mi S of SR 2


Lake


0


NHPP Non

Interstate


2018


PE


$


13.000


$


10.400


$


2.600


M

2018-2021 Transportation Improvement Program for Lake, LaPorte, and Porter Counties, Indiana

image

image

Northwestern Indiana Regional Planning Commission Original All Project List March 2017




Row ID


Des #


Sponsor


Route


Work Category


Work Type


Location


County


Des Length


Federal Fund Type


Year


Phase


Total


Federal Funds


Non-Federal Funds


Non Exempt (NE) and/or Regionally Significant (RS)


122


1500674


INDOT


1 80


District Bridge Project

!Rehobililotion}


Bridge Deck Overlay


1-ro WB Romp NS RR and EJ&E RR.

0.50mi E of SR 912


Lake


0


NHPP

Interstate


2021


PE


$


157.000


$


141.300


$


15.700


123


1500674


INDOT


1 80


District Bridge Project

!Rehabilitation}


Bridge Deck Overlay


1-80 WB Romp NS

RR and EJ&E RR. 0.50mi E of SR 912


Lake


0


NHPP

Interstate


2021


CN


$


l.993,376


$


l.794.038


$


199.338


124


1500674


INDOT


1 80


District Bridge Project

!Rehabilitation}


Bridge Deck Overlay


1-80 WB Romp NS

RR and EJ&E RR. 0.50mi E of SR 912


Lake


0


NHPP

Interstate


20201


PE


$


75.000


$


67,500


$


7,500


125


1500689


INDOT


SR 249


District Pavement Project (Non-I)

HMA Overlay, Preventive Maintenance


From US 20 to US 12


Porter


l.904000044


NHPP Non

lnte,.tote


2018


CN


$


1.065.000


$


852.DOO


$


213.000


126


1592854


INDOT


us 41


District Pavement Project (Non-I}

HMA Overloy, Preven1ive Maintenance

From 1-80/94 to 0.77mi S of 1-90 (Huehn St}


Lake


0.001


NHPP Non

Interstate


2018


PE


$


70,DOO


$


56,000


$


14.DOO


127


1592854


INDOT


us 41


District Pavement Project !Non-I}

HMA Overlay, Preventive Maintenance

From 1-80/94 to 0.77mi S of 1-90

!Huehn St}


Lake


0.001


NHPP Non

Interstate


2018


PE


$


275.000


$


220,000


$


55.000


128


1592854


INDOT


us 41


District Pavement Project (Non-I}

HMA Overlay. Preventive Maintenance

From 1-80/94 to 0.77mi S of 1-90 (Huehn St}


Lake


0.001


NHPP Non

Interstate


2018


CN


$


2.782.000


$


2,225,600


$


556.400


129


1592857


INDOT


SR 49


District Pavement Project !Non-I}


HMA Overlay, Functional


Fram l.l4mi S of SR 8 to SR 8


Porter


l.l67999983


STBG State


2018


CN


$


412.419


$


329.935


$


82.484


130


1592857


INDOT


SR 49


District Pavement Project !Non-I)


HMA Overlay. Functional


From l.l4mi S ol SR 8 to SR 8


Porter


l.l67999983


STBG State


2018


PE


$


58.000


$


46.400


$


l l.600


131


1592873


INDOT


SR 912


District Bridge Project (Rehabilitation}


Scour Protection (Erosion}


.22mi E of 1-80. Little Calumet River


Lake


0


NHPP Non

Interstate


2018


CN


$


159.414


$


127,531


$


31.883


132


1592873


INDOT


SR 912


District Bridge Project (Rehabilitation)


Scour Protection

!Erosion}


.22mi E al 1-80, Little Calumet River


Lake


0


NHPP Non

Interstate


2018


PE


$


22.500


$


18.000


$


4.500


M

2018-2021 Transportation Improvement Program for Lake, LaPorte, and Porter Counties, Indiana

Northwestern Indiana Regional Planning Commission Original All Project List March 2017



Row ID Des # Sponsor Route Work Category Work Type Location County Des Length


Federal Fund Type


Year Phase Total federal Funds


Non-Federal Funds


image

Non Exempt (NE) and/or Reglonally Significant (RS)


District Bridge


Bridge Deck NHPP

  1. 1593079 INDOT 1 80 Project

    (Rehabilitation)

    Sealing

    1.18mi E of SR 53 Lake 0

    Interstate

    2018 PE $ 28.523 $ 25.671 $ 2.852

    District Bridge

  2. 1593079 INDOT 1 80 Project

    Bridge Deck


    1.18mi E of SR 53 Lake 0


    NHPP

    2020 CN $ 388.942 $ 350.048 $ 38.894

    (Rehabilitation)

    Sealing Interstate

    District Bridge

  3. 1593079 INDOT 1 80 Project


Bridge Deck NHPP

1.18mi E of SR 53 Lake 0

2020 CE $ 29.712 $ 26,741 $ 2.971

(Rehabilitation)

Sealing

Interstate

District Bridge

Bridge Deck 73rd over 1-65. NHPP

136 1593213 INDOT 1 65 Project Lake 0 2018 PE $ 157.000 $ 141,300 $ 15,700

Overlay 0,94mi N of US 30 Interstate

(Rehabilitation)

District Bridge

Bridge Deck 73rd over 1-65. NHPP

  1. 1593213 INDOT 1 65 Project

    (Rehabilitation)

    Overlay 0.94mi N of US 30

    Lake 0

    Interstate

    2020 CN $ 886.906 $ 798.215 $ 88.691

    District Bridge

  2. 1593213 INDOT 1 65 Project

    Bridge Deck 73rd over 1-65.


    Lake 0


    NHPP


    2020 CE $ 117,750 $ 103.620 $ 14,130

    (Rehabilitation)

    Overlay 0.94mi N of US 30 Interstate


    District Bridge

  3. 1593219 INDOT 1 80 Project


    Bridge Deck SR 912 EB Ramp


    Lake 0


    NHPP

    2018 PE $ 82.380 $ 74.142 $ 8.238

    (Rehabilitation)

    Overlay to 1-80 at N&S RR Interstate

    District Bridge

    Bridge Deck SR 912 EB Ramp NHPP

  4. 1593219 INDOT 1 80 Project

    (Rehabilitation)

    Overlay to 1-80 at N&S RR

    Lake 0

    Interstate

    2020 CN $ 949.232 $ 854.309 $ 94,923


    District Bridge

  5. 1593219 INDOT 1 80 Project


Bridge Deck SR 912 EB Ramp


Lake 0


NHPP

2020 CE $ 126.000 $ 113.400 $ 12.600

(Rehabilitation)

Overlay to 1-80 at N&S RR Interstate

142 1593246 INDOT 1 94

District Small Small Structure Structure Project Pipe Lining


0.94mi E of SR 51 Lake 0


NHPP

Interstate


2019 CN $ 200.000 $ 180.000 $ 20.000


M

2018-2021 Transportation Improvement Program for Lake, LaPorte, and Porter Counties, Indiana

Northwestern Indiana Regional Planning Commission Original All Project List March 2017



Row ID Des # Sponsor Roule Work Category Work Type Location County Des Length


Federal Non-Federal

Year Phase Total Federal Funds


image

Non Exempt

(NE) and/or Regionally

Fund Type

Funds

Significant (RS)


143 1593246 INDOT 1 94

District Small Small Structure Structure Project Pipe Lining


0.94mi E of SR 51 Lake 0

NHPP

Interstate


2019 PE $ 30,000 $ 27,000 $ 3.000


144 1593247 INDOT 1 94

District Small Small Structure 2.66 mi E of US Structure Project Pipe Lining 421

LaPorte 0

NHPP

Interstate

2019 PE $ 30,000 $ 27.000 $ 3.000

145 1593247 INDOT 1 94

District Small Small Structure 2.66 mi E of US Structure Project Pipe Lining 421

LaPorte 0

NHPP

Interstate

2019 CN $ 200.000 $ 180.000 $ 20,000

146 1593248 INDOT 1 94

District Small Small Structure 4.56 mi E of US Structure Project Pipe Lining 421

LaPorte 0

NHPP

Interstate

2019 PE $ 30,000 $ 27.000 $ 3.000

147 1593248 INDOT 1 94

District Small Small Structure 4.56 mi E of US Structure Project Pipe Lining 421

LaPorte 0

NHPP

Interstate

2019 CN $ 200.000 $ 180.000 $ 20.000

148 1593265 INDOT us 421

District Pavement Project (Non-I)


HMA Overlay, From SR 2 (N Jct)

Preventive to 0.3mi S of I 94 LaPorte 6.373000145

Maintenance (CR 300 N)


NHPP Non

Interstate

2019 CN $ 1.567.500 $ 1.254,000 $ 313.500

149 1593265 INDOT us 421

District Pavement Project (Non-I)


HMA Overlay. From SR 2 (N Jct)

Preventive to 0.3mi S of I 94 LaPorte 6.373000145

Maintenance (CR 300 N)


NHPP Non

Interstate

2019 PE $ 156.750 $ 125.400 $ 31.350


District Bridge

  1. 1593278 INDOT SR 49 Project

    (Rehabilitation)


    Bridge Deck Over Cook Dilch. Overlay 4.01mi S of SR 8


    Parter 0 STBG State 2019 CN $ 200.000 $ 160.000 $ 40.000


    District Bridge

  2. 1593278 INDOT SR 49 Project

(Rehabilitation)


Bridge Deck Over Cook Ditch. Overlay 4.0lmi S ot SR 8


Porter 0 STBG State 2019 PE $ 30.000 $ 24.000 $ 6.000



152 1600012 INDOT I 65

District Small Small Structure Structure Project Pipe Lining


2.96 mi S of SR 2 Lake 0

NHPP

Interstate

2018 CN $ 165.000 $ 148.500 $ 16.500

153 1600012 INDOT 1 65

District Small Small Structure Structure Project Pipe Lining


2.96 mi S of SR 2 Lake 0


NHPP

Interstate

2018 PE $ 20.625 $ 18.563 $ 2.063


M

2018-2021 Transportation Improvement Program for Lake, LaPorte, and Porter Counties, Indiana

Northwestern Indiana Regional Planning Commission Original All Project list March 2017



image

Non Exempt

Federal Non-Federal (NE) and/or

Row ID Des # Sponsor Route Work Category Work Type Location County Des Length Year Phase Total Federal Funds Regionally

Fund Type Funds

Slgniltcant

(RS)


District Bridge

  1. 1600015 INDOT 1 80 Project


    Bridge Thin Deck 2.03 mi W of SR 53


    Lake 0


    NHPP


    2018 CN $ 322.193 $ 289,974 $ 32,219

    1Rehabilila1ion)

    Overlay at 1-80/94 EB/WB lnte"tate


    District Bridge

  2. 1600015 INDOT 1 80 Project

    (Rehabilitation)


    Bridge Thin Deck 2.03 mi W of SR 53 NHPP

    Overlay al 1-80/94 EB/WB Lake 0 Interstate 2018 PE $ 40.275 $ 36,248 $ 4.028


    Oislrict Bridge

  3. 1600026 INDOT SR 51 Project

(Replacement)


Traffic Signals Modernization


SR 51 & Petro

Truck Plaza Dr., Lake 0

2.95mi N of US 6


NHPP Non

Interstate


2018 CN $ 95,219 $ 76,175 $ 19,044



157 1600028 INDOT us 12


District Pavement Project (Non-I)

HMA Overlay, From US 20

Preventive (Columbus Dr.) to Lake

Maintenance SR 912


NHPP Non

lnte"tate

2018 PE $ 122.000 $ 97,600 $ 24.400

158 1600028 INDOT us 12

District Pavement Project (Non-I)

HMA Overlay, From US 20

Preventive (Columbus Dr.) o Lake

NHPP Non

2020 CN $ 1.524,583 $ 1.219,666 $ 304,917

Maintenance SR 912 Interstate

159 1600028 INDOT us 12

District Pavement Project (Non-I)

HMA Overlay, From US 20

Preventive (Columbus Or.)lo Lake

NHPP Non

2020 CE $ 134,900 $ 107,920 $ 26,980

Maintenance SR 912 Interstate

160 1600029 INDOT us 12

161 1600029 INOOT us 12

District Pavement Project (Non-I)

District Pavement Project (Non-I)


From I.07mi W of HMA Overlay, SR 249 (Burns

Preventive Harbor Ditch) To Porter 3.930000067

Maintenance J.32mi E of SR I49

(Oak Hill Rd)


From I.07mi W ot HMA Overlay, SR 249 (Burns

Preventive Harbor Ditch) To Porter 3.930000067


NHPP Non

lnte"lale


NHPP Non


2019 CN $ 1.960,000 $ 1.568.000 $ 392,000


2019 PE $ 196,000 $ 156,800 $ 39,200

Maintenance J.32mi E ol SR 149 Interstate

(Oak Hill Rd)


HMA Overlay. From 0.24 mi W of

162 1600340 INOOT us 20 District Pavement Preventive SR 149 to 0.1 lmi E Porter 1.406999946 NHPP Non 2019 CN $ 755.000 $ 604.000 $ 151.000

Project (Non-I)

Maintenance

of 1-94 (Babcock Interstate

Rd)


M

2018-2021 Transportation Improvement Program for Lake, LaPorte, and Porter Counties, Indiana

Northwestern Indiana Regional Planning Commission Original All Project List March 2017




Row ID


Des #


Sponsor


Roule


Work Category


Work Type


Location


County


Des Length


Federal Fund Type


Year


Phase


Total


Federal Funds


Non-Federal Funds


Non Exempt (NE) and/or Regionally Significant (RS)


163


1600340


INDOT


us 20


District Pavement Project (Non-I)


HMA Overlay. Preventive Maintenance

From 0.24 mi W of SR 149 to 0.11 mi E

of 1-94 (Babcock Rd)


Porter


1.406999946


NHPP Non

Interstate


2019


PE


$


113.000


$


90.400


$


22.600


164


1600344


INDOT


us 35


District Pavement Project (Non-I)


Concrete Pavement Restoralion (CPR)


From SR 2 (in LaPorte) to 0.5mi N of SR 2


LaPorte


0.493999988


STBG State


2019


CN


$


604.000


$


483.200


$


120.800


165


1600344


INDOT


us 35


District Pavement Project (Non-I)


Concrete Pavement Restoration (CPR)


From SR 2 (in LaPorte) lo 0.5mi N of SR 2


LaPorte


0.493999988


STBG Slate


2019


PE


$


90.000


$


72.000


$


18.000


166


1600346


INDOT


us 421


District Pavement Project (Non-I)


HMA Overlay. Preventive Maintenance


From 0.52 mi N of 1-94 (Gruenke Rd)

to US 20


LaPorte


0.99299997 l


NHPP Non

Interstate


2019


CN


$


485.000


$


388.000


$


97.000


167


1600346


INDOT


us 421


District Pavement Project (Non-I)


HMA Overlay, Preven1ive Maintenance


From 0.52 mi N of 1-94 (Gruenke Rd)

to US 20


LaPorte


0.992999971


NHPP Non

Interstate


2019


PE


$


97.000


$


77.600


$


l9.400


168


1600351


INDOT


us 30


District Bridge Project (Rehabilitation)


Bridge Deck Overlay


Over Deep River,

l.96mi E of SR 51


Lake


0


NHPP Non

Interstate


2019


CN


$


850.000


$


680,000


$


170.000


169


1600351


INDOT


us 30


District Bridge Project (Rehabilitation)


Bridge Deck Overlay


Over Deep River, l.96mi E of SR 51


Lake


0


NHPP Non

Interstate


2019


PE


$


170.000


$


136.000


$


34.000


170


1600352


INDOT


us 20


District Bridge Project (Rehabilitation)


Bridge Pointing


Over 1-90. 3.60 mi E of SR 39


LaPorte


0


STBG State


2019


PE


$


135.000


$


108.000


$


27.000


171


1600352


INDOT


us 20


District Bridge Project (Rehabilitation)


Bridge Pointing


Over 1-90. 3.60 mi E of SR 39


LoPorte


0


STBG Stole


2019


CN


$


1,350.000


$


l.080.000


$


270.000


172


1600358


INDOT


us 20


Environmental

Mitigation Project


Environmental

Mitigation

US 421 to US 35/SR 212 in Michigan City


LaPorte


3.882999897


NHPP Non

lntef5tate


2018


CN


$


300.000


$


240.000


$


60.000

image


M

2018-2021 Transportation Improvement Program for Lake, LaPorte, and Porter Counties, Indiana

image

Northwestern Indiana Regional Planning Commission Original All Project List March 2017




Row ID


Des #


Sponsor


Route


Work Category


Work Type


Location


County


Des Length


Federal Fund Type


Year


Phase


Total


Federal Funds


Non-Federal Funds


Non Exempt (NE) and/or Regionally Significant (RS)


173


1600406


INDOT


SR 912


District Pavement Project (Non-I)

HMA Overlay, Preventive Maintenance

From 0.1 mi N of Highway Avelo Ridge Road


Lake


0.363000005


NHPP Non

Interstate


2018


CN


$


218,175


$


174,540


$


43.635


174


1600406


INDOT


SR 912


District Pavement Project (Non-I)

HMA Overlay, Preventive Maintenance

From O.lmi N of Highway Ave to Ridge Road


Lake


0.363000005


NHPP Non

Interstate


2018


PE


$


30,000


$


24.000


$


6,000


175


1600406


INDOT


SR 912


Dislrict Pavement Project (Non-I)

HMA Overlay, Preventive Maintenance

From 0.1mi N of Highway Ave to Ridge Road


Lake


0.363000005


NHPP Non

Interstate


2018


PE


$


10.000


$


8,000


$


2.000


176


1600448


INDOT


VA VARI


Railroad Grade Crossing Project


Railroad Protection

Tryon Road at CSX DOT

#232070F in

Michigan City


LaPorte


0


Sec 130


2018


PE


$


20.000


$


20.000


$


-


177


1600448


INDOT


VA VARI


Railroad Grade Crossing Project


Railroad Protection

Tryon Road at CSX DOT

#232070F in

Michigan City


LaPorte


0


Sec 130


2019


CN


$


320.000


$


320.000


$

-


178


1600449


INDOT


VA VARI


Railroad Grade Crossing Project


Railroad Protection

Tilden Street al CSX RR DOT

#232080L in

Michigan City


LaPorte


0


Sec 130


2018


PE


$


20,000


$


20.000


$


179


1600449


INDOT


VA VARI


Railroad Grade Crossing Project


Railroad Protection

Tilden Street at CSX RR DOT

#232080L in

Michigan City


LaPorte


0


Sec 130


2019


CN


$


320.000


$


320.000


$


-


180


1600450


INDOT


VA VARI


Railroad Grade Crossing Project


Railroad

Protection


Sohl Street at IHB DOT #326991 C in

Hammond


Lake


0


Sec 130


2018


PE


$


20.000


$


20.000


$


-


181


1600450


INDOT


VA VARI


Railroad Grade Crossing Project


Railroad Protection


Sohl Street at IHB DOT #326991 C in

Hammond


Lake


0


Sec 130


2019


CN


$


400.000


$


400.000


$


-


182


1600451


INDOT


VA VARI


Railroad Grade Crossing Project


Railroad Protection

Roeske Ave at CSX DOT

#232074H in

Michigan City


LaPorte


0


Sec 130


2018


PE


$


20.000


$


20.000


$


M

2018-2021 Transportation Improvement Program for Lake, LaPorte, and Porter Counties, Indiana

image

image

image

Northwestern Indiana Regional Planning Commission Original All Project List March 2017




Row ID


Des #


Sponsor


Route


Work Category


Work Type


Location


County


Des Length


Federal Fund Type


Year


Phase


Total


Federal Funds


Non-Federal Funds


Non Exempt (NE) and/or Regionally Slgnfficant (RS)


183


1600451


INDOT


VA VARI


Railroad Grade Crossing Project


Railroad Protection

Roeske Ave at CSX DOT

#232074H in

Michigan City


LaPorte


0


Sec 130


2019


CN


$


320,000


$


320,000


$

-


184


1600452


INDOT


VA VARI


Railroad Grade Crossing Project


Railroad Protection


Greenwood Ave at CSX DOT

#232075P in

Michigan City


LaPorte


0


Sec 130


2018


PE


$


20,000


$


20,000


$


-


185


1600452


INDOT


VA VARI


Railroad Grade Crossing Project


Railroad Protection


Greenwood Ave at CSX DOT

#232075P in

Michigan City


LaPorte


0


Sec 130


2019


CN


$


320,000


$


320.000


$


186


1600454


INDOT


VA VARI


Railroad Grade Crossing Project


Railroad Protection

Carroll Ave at CSX DOT

#232077D in

Michigan City


LaPorte


0


Sec 130


2018


PE


$


20,000


$


20,000


$


-


187


1600454


INDOT


VA VARI


Railroad Grade Crossing Project


Railroad Protec1ion

Carroll Ave al CSX DOT

#232077D in

Michigan City


LaPorte


0


Sec 130


2019


CN


$


320,000


$


320.000


$


-


188


1600455


INDOT


VA VARI


Railroad Grade Crossing Project


Railroad Proteclion


Calumet St al NS RR DOT #522625P

in Chesterton


Porter


0


Sec 130


2018


PE


$


20,000


$


20,000


$


-


189


1600455


INDOT


VA VARI


Railroad Grade Crossing Project


Railroad Protection


Calumet SI at NS RR DOT #522625P

in Chesterton


Porter


0


Sec 130


2019


CN


$


320,000


$


320.000


$


-


190


1600481


INDOT


us 231


Signal Project

!New/Modernize d)


New Signal Installation


Intersection of US 231 at Fathke Rd,

2.8 mi E of US 41


Lake


0


NHPP Non

Interstate


2018


CN


$


120,000


$


96,000


$


24,000


191


1600481


INDOT


us 231


SignaI Project

!New/Modernize d)


New Signal Installation


Intersection of US 231 at Fathke Rd.

2.8 mi E of US 41


Lake


0


NHPP Non

Interstate


2018


PE


$


20,000


$


16.000


$


4,000


M

2018-2021 Transportation Improvement Program for Lake, LaPorte, and Porter Counties, Indiana

Northwestern Indiana Regional Planning Commission Original All Project List March 2017



image image image image image image


Row ID


Des #


Sponsor


Route


Work Category


Work Type


location


County


Des ength


Federal Fund Type


Year


Phase


Total


Federal Funds


Non-Federal Funds


Non Exempt (NE) and/or Regionally Signfflcant (RS)


192


1600499


INDOT


US 30


Intersection Improvement Project


HMA Overlay. Func1ional

From 2.65mi W of W Jct of SR 2 (CR 250W) to 0.6mi E o1SR 49

(Industrial Dr)


Porter


5.42000007 6


NHPP Non

Interstate


2020


PE


$


315.000


$


252.000


$


63.000


193


1600499


INDOT


US 30


Intersection Improvement Project


HMA Overlay, Func1ional

From 2.65mi W of W Jct of SR 2 (CR 250W) o 0.6mi E

of SR 49 (Industrial Dr)


Porter


5.42000007 6


NHPP Non

Interstate


2020


CN


$


5,160,618


$


4, 128.494


$


l.032.124


194


1600499


INDOT


US 30


Intersection Improvement Project


HMA Overlay. Functional

From 2.65mi W of W Jct of SR 2 (CR 250W)lo 0.6mi E of SR 49 (Industrial Dr)


Porter


5.42000007 6


NHPP Non

Interstate


2020


CE


$


315.000


$


252.000


$


63.000


195


1600500


INDOT


SR 249

District Bridge Project (Replacement)


Replace Superstructure

US 12. 2 RR. 2

Roads. 2.0mi N of 1-94


Porter


0


NHPP Non

Interstate


2018


PE


$


l.600.000


$


l,280.000


$


320.000


196


1600500


INDOT


SR 249

District Bridge Project (Replacement)


Replace Supers1ructure

US 12.2 RR.2

Roads. 2.0mi N of 1-94


Porter


0


NHPP Non

Interstate


2020


CN


$


18,938.015


$


15,150.412


$


3.787,603


197


1600500


INDOT


SR 249

District Bridge Project (Replacement)


Replace Superstructure

US 12. 2 RR. 2

Roads. 2.0mi N of 1-94


Porter


0


NHPP Non

Interstate


2020


CE


$


1,000.000


$


800.000


$


200.000


198


1600504


INDOT


SR 51


lntersec1ion Improvement Project


Added Travel Lanes.Construct Turn Lanes


lnlersec1ion with 10th St and Lincoln St


Lake


0.07


STBG Slate


2018


PE


$


45.000


$


36.000


$


9.000


199


1600504


INDOT


SR 51


Intersection Improvement Project


Added Travel Lanes, Construct Turn Lanes


Intersection with 10th SI and Lincoln SI


Lake


0.07


STBG State


2021


CN


$


299,571


$


239.657


$


59,914


200


1600694


INDOT


SR 130


Intersection Improvement Project


Intersect. lmprov. W/ Added Turn Lanes


SR 130 @ CR 450

w


Porter


0


NHPP Non

Interstate


2018


PE


$


56.000


$


44,800


$


ll.200


201


1600694


INDOT


SR 130


Intersection Improvement Project


Intersect. lmprov. W/ Added Tum Lanes


SR 130 @ CR 450

w


Porter


0


NHPP Non

Interstate


2021


CN


$


378,629


$


302.903


$


75,726


M

2018-2021 Transportation Improvement Program for Lake, LaPorte, and Porter Counties, Indiana

Northwestern Indiana Regional Planning Commission Original All Project List March 2017



Row ID Des # Sponsor Roule Work Category Work Type Location County Des Length


Federal Non-Federal

Year Phase Total Federal Funds


image

Non Exempt (NE) and/or Regionally

Fund Type

Funds

Significant (RS)


lnlerseclion lnlersect. lmprov.


NHPP Non

  1. 1600700 INDOT SR 130 Improvement W/ Added Turn SR 149 @ SR 130 Porter 0 Interstate 2018 PE $ 69,000 $ 55.200 $ 13,800 Project Lanes


    Intersection Intersect. lmprov.

  2. 1600700 INDOT SR 130 Improvement WI Added Turn SR 149 @ SR 130 Porter 0

    Project Lanes


    NHPP Non

    lnlerslale

    2021 CN $ 462,428 $ 369,942 $ 92.486

    District Bridge

  3. 1600906 INDOT SR 4 Project

    Bridge Deck Overlay


    SR 4 @ GTW RR,

    2.79 mi E of SR LaPorte 0 STBG Slate 2018 PE $ 63,449 $ 50.759 $ 12.690

    (Rehabilitation) 104


    District Bridge

  4. 1600906 INDOT SR 4 Project

    (Rehabilitation)


    Bridge Deck Overlay


    SR 4 @ GTW RR,

    2.79 mi E ol SR LaPorte 0 STBG Slate 2020 PE $ 60,000 $ 48,000 $ 12.000

    104


    District Bridge

  5. 1600906 INDOT SR 4 Project

    (Rehabilitation)


    Bridge Deck Overlay

    SR 4 @ GTW RR,

    2.79 mi E of SR LaPorte 0 STBG Slate 2021 CN $ 606.428 $ 485, 142 $ 121.286

    104


    District Bridge

  6. 1600907 INDOT US 12 Project

    (Rehabilitation)


    US 12 EB @ NS RR.

    Bridge Deck Beth Steel Ramp. Overlay 0.24 mi E of SR

    149


    Porter 0


    NHPP Non

    Interstate

    2018 PE $ 107,000 $ 85,600 $ 21.400

    District Bridge

    US 12 EB @ NS RR.

  7. 1600907 INDOT us 12 Project Bridge Deck Beth Sleel Ramp, Porter 0 NHPP Non 2020 PE $ 65,000 $ 52,000 $ 13.000

    Overlay 0.24 mi E of SR Interstate

    (Rehabilitation)

    149


    District Bridge


    US 12 EB @ NS RR,

  8. 1600907 INDOT us 12 Project Bridge Deck Beth Steel Ramp, Porter 0 NHPP Non 2021 CN $ 1.023.518 $ 818,814 $ 204.704

    Overlay 0.24 mi E of SR Interstate

    (Rehabililalion)

    149

    Intersection Intersection Intersection of SR

    NHPP Non

  9. 1600913 INDOT SR 2 Improvement Improvement, 2 at Heavilin Rd Porter 0 Interstate 2018 PE $ 30,000 $ 24.000 $ 6,000 Project Roundabout (CR 50WJ

    Intersection Intersection lnlerseclion of SR

    NHPP Non

  10. 1600913 INDOT SR 2 Improvement Improvement, 2 at Heavilin Rd Porter 0 lnlerslale 2018 RW $ 30.000 $ 24.000 $ 6,000 Project Roundabout (CR 50WJ


    M

    2018-2021 Transportation Improvement Program for Lake, LaPorte, and Porter Counties, Indiana

    Northwestern Indiana Regional Planning Commission Original All Project List March 2017



    Federal Non-Federal


    image

    Non Exempt (NE) and/or

    Row ID Des # Sponsor Route Work Category Work Type Location County Des Length Fund Type Year Phase Total Federal Funds Funds Regionally

    Signmcant

    (RS)



    lntersec1ion Intersection Intersection of SR NHPP Non

  11. 1600913 INDOT SR 2 Improvement Improvement, 2 al Heavilin Rd Porter 0

    Interstate


    2019 CN $ 1.493,324 $ l.l94,659 $ 298,665

    Project Roundabout (CR SOW)


    lntersec1ion Intersection Intersection of SR


    NHPP Non

  12. 1600913 INDOT SR 2 Improvement Improvement , 2 at Heavilin Rd Porter 0 lnlers1ale 2019 PE $ 203,000 $ 162,400 $ 40,600 Project Roundabout (CR 50W)



    District Bridge

  13. 1600914 INDOT us 12 Project

    US 12 WB @ NS

    Bridge Deck RR, Beth Steel Porter 0 NHPP Non

    2018 PE $ 107,000 $ 85,600 $ 21.400

    (Rehabilitation)

    Overlay Ramp, 0.24 mi E

    of SR 149

    Interstate

    District Bridge