Part Ill: Program of Projects and Related Information
Introduction and Summary. This Part Ill contains two lists of projects-one for highway and bicycle/pedestrian projects and one for public transit projects. Also included is semi-technical information that describes how to print the list, followed by a description of terms used in the list (including column headers), and information on how to conta ct NIRPC.
The list of INDOT and LPA-funded non-transit projects identifies 438 projects or project phases with a total value of approximately $409 million (with federal funds of about $331 million). The list of transit projects identifies 176 projects with a projected total cost of $1.158 billion ($578 million federal).
Page Numbering. The lists of projects have their own page numbering system. The lists begin immediately following the text in this Part Ill.
INDOT Sponsored Projects
Local Highway-Related Projects
National Park Service Projects
Public Transit Projects
Page 1
Page 36
Page 52
Page 53
Printing the List of Projects. The list is formatted to print in landscape mode on sta ndard 8.5" x 11" paper.
The list was prepared in Microsoft Excel 2013. It is being forwarded (via e mail) to our planning partners as an independent worksheet file. A pdf version is being posted on our website. However, a copy of the Excel file will be provided to any person requesting it. Please e-mail written requests to nirpc@ nirpc.org.
Contacting NIRPC. Persons with questions, comments, or suggestions regarding this document are encouraged to contact NIRPC, either via telephone at 219.763.6060, via e-mail at nirpc@nirpc.org or comments@ nirpc.org, or over the internet at www.nirpc.org. Individuals with hearing impairments may contact us through the Indiana Relay 711 system by calling 711or (800) 743-3333.
Using the List of Projects: Types of Federal Funds. Following the list is a key to the Federal funding codes used in the TIP. The TIP programs funds from the U.S. Federa l Highway Administration (FHWA) and U.S. Federal Transit Administration (FTA).
Acronym | Description | |
CMAQ Chicago UZA | Congestion Mitigation/Air Quality Program for Lake & Porter Counties | |
CMAQ Mich City UZA | Congestion Mitigation/Air Quality Program for LaPorte County | |
FTA 5307 Chicago UA | FTA Urbanized Area Formula Grants (Chicago Urbanized Area ) | |
FTA 5307 Mich City UA | FTA Urbanized Area Formula Grants (Michigan City Urbanized Area) | |
SOGR | FTA Section 5336 Rail State of Good Repair Capital Grants | |
FTA 5310 Chicago UA | FTA Section 5310 Program (Chicago Urbanized Area) | |
FTA 5339 Chicago UA | FTA Section 5339 Bus Capital Program (Chicago Urbanized Area) | |
100% Local | No Federal Funds Used | |
FHWA NHPP-lnterstate | FHWA National Highway Performance Program-Interstate | |
FHWA NHPP-NHS | FHWA National Highway Performance Program-NHS System | |
FHWA STBG (State) | FHWA Surface Transportation Program (State) | |
FHWA STBG Sec 130 | FHWA Surface Transportation Program (State) Rail Crossing | |
FHWA Bridge (Local) | FHWA Bridge Program (Local) Program | |
FHWA Highway Safety Improvement Program (HSIP) | Self-Explanatory | |
FHWA Safe Routes to Schools | Self-Ex planatory. (2012 & prior) | |
FHWA STBG Group I | FHWA Surface Transportation Program (Large Urban) | |
FHWA STBG Group II | FHWA Surface Transportation Program (Small Urban) | |
FHWA STBG Group Ill | FHWA Surface Transportation Program (Smaller Urban) | |
FHWA STBG Group IV | FHWA Surface Transportation Program (Smallest Urban/Rural) | |
PYB Chicago UA | Prior Year Balance Funds from SFY 2014 ( Chicago UZA) | |
PYB Mich City UA | Prior Year Balance Funds from SFY 2014 (Michigan City UZA) | |
SAFETEA-LU High Priority | Demonstration (Earmark) funds appropriated by Congress | |
Demo | Demonstration (Earmark) funds appropriated by Congress | |
TEA-21 High Priority | Demonstration (Earmark) funds appropriated by Congress | |
FHWA TAP (State) | FHWA Transportation Alternat ives Program (State-Controlled) | |
FHWA TAP | FHWA Transportation Alternatives Program (Local) |
Using the List of Projects: Column Headings. Following is a brief explanation of the column headings and the type of information that is found under each.
Line: This is a sequential number assigned to each line on this report. It is subject to change as new projects are added and is useful to have (along with the print date) if you are contacting NIRPC about a particular project. This will allow us to locate the project more quickly .
DES: This is a project number assigned to projects by INDOT. It is extensively used by NIRPC and INDOT. It is very helpful to have the project's DES number when contacting NIRPC or INDOT regarding a project in the TIP. (DES numbers are also assigned to transit projects.) If the word "Pending" appears in this column, this means that a DES number has not yet been assigned to the project.
Sponsor Name: This is simply the identity of the party responsible for implementing the project. This may be INDOT, or another unit of government (such as a city, town, or county).
Route: The name of the affected street, road, or INDOT Highway route.
Work Category: The general category of work to be performed. Assigned by INDOT.
Work Type: The type of work to be performed beneath the particular category of work. Assigned by INDOT.
Location and/or Additional Details: For projects that can be identified geographically, such as roadway or bicycle/pedestrian trail projects, this field will identify the beginning and ending points of the project. Sometimes there is other information contained in this field that is thought to be helpful to the reader.
(Cost to Complete Information is provided in this field for the few projects listed for which a construction phase is not programmed.)
County: This is the primary county in which the work associated with the project will take place. In some INDOT projects the word "Various" will appear-this means that work under the project will be performed in more than one county.
DES Length: For roadway reconstruction or trail projects, the length (miles) is displayed.
Federal Fund Type: This is the federal aid program which will be used to cover project costs. Please note that some projects have multiple sources of federal aid. These are usually displayed together consecutively.
Phase Code: This is primarily for construction projects. PE means Preliminary Engineering, RW means Right of Way Services (such as title searches, abstract fees, etc.) and/or Land, Improvements, and Damages. CN refers to actual Construction, which includes the contract cost, construction engineering, and materials and inspection fees. Stand-alone planning projects carry a PE or PL phase code.
Vear: This DOES NOT refer to the calendar year. This refers to the State Fiscal Year in which the funds are expected to be obligated. Indiana's fiscal year runs from July through June. For example, State Fiscal Year 2016 will begin on July 1, 2015 and will end on June 30, 2016.
Total Cost: This is the anticipated total cost of performing the indicated phase. For projects that have multiple sources of federal aid, it will be necessary to manually compute the Grand Total cost for the particular phase.
Federal Funds: This is the anticipated level of federal aid presently allocated to the indicated project phase.
Non-Federal (Funds): This is the anticipated level of non-federal funding that is presently allocated to the indicated project phase. Non-Federal funds may include state and/or local funds.
Non-Exempt (NE} or Regionally Significant (RS}: Non-exempt projects are those that have been found to add capacity (and emissions) to the transportation network and are subject to the Federal Clean Air Act, as amended and the U.S. Environmental Protection Agency's Transportation Air Quality Conformity Regulation (40 CFR 93).
Regionally Significant projects are those which meet the standards identified in our own Regional Significance Policy, adopted in 2008.
Using the List of Projects: Other Information.
Projects are organized differently within their respective part of the lists:
Local Projects are organized by Sponsor Name.
The names of some project sponsors have been abbreviated. Following are the abbreviations (acronyms) followed by the proper name of the sponsor:
GPTC-Gary Public Transportation Corporation LaPorte-City of LaPorte (not LaPorte County)
NICTD-Northern Indiana Commuter Transportation District NIRPC-Northwestern Indiana Regional Planning Commission North-North Township Government (Lake County)
OE-Opportunity Enterprises, Inc.
Porter-Town of Porter (not Porter County)
Porter CACS-Porter County Aging & Community Services, Inc. Southlake-South Lake County Community Services, Inc.
M•
2018-2021 Transportation Improvement Program for Lake, LaPorte, and Porter Counties, Indiana
Northwestern Indiana Regional Planning Commission Original All Project List March 2017
Row ID | Des # | Sponsor | Route | Work Category | Work Type | Location | County | Des Length | Federal Fund Type | Year | Phase | Total | Federal Funds | Non-Federal Funds | Non Exempt (NE) and/or Regionally Slgniflcant (RS) |
INDltiNA DElA' RJMENT aJlRANSPOIITATIQN(t\-IDOT) ponsoreil Pro)eci, | |||||||||||||||
I | 0500028 | District Bridge Project (Replacement) | Br Repl. Cont. Re Slab | Bridge over M J Brown Ditch.2.70 miles E of 1-65 | Lake | 0 | STBG Slate | 2018 | CN | $ 1.342.000 | $ 1.073.600 | $ 268.400 | |||
INDOT | SR 2 | ||||||||||||||
2 | 0500480 | INDOT | us 20 | Added Travel Lanes Project | Added Travel Lanes,Construct Tum Lanes | US 421 to US 35/SR 212 in Michigan City | LaPorte | 3.872999907 | STBG Slate | 2018 | CN | $ 720.000 | $ 576.000 | $ 144.000 | RS |
3 | 0500480 | INDOT | us 20 | Added Travel Lanes Project | Added Travel Lanes.Construct Turn Lanes | US 421 to US 35/SR 212 in Michigan City | LaPorte | 3.872999907 | STBG Slate | 2018 | PE | $ 820.000 | $ 656.000 | $ 164.000 | RS |
4 | 0500480 | INDOT | US 20 | Added Travel Lanes Project | Added Travel Lanes.Construct Turn Lanes | US 421 to US 35/SR 212 in Michigan City | LaPorte | 3.872999907 | STBG State | 2018 | PE | $ l.182.000 | $ 945,600 | $ 236.400 | RS |
5 | 0500480 | INDOT | us 20 | Added Travel Lanes Project | Added Travel Lanes. Construct Turn Lanes | US 421 to US 35/SR 212 in Michigan City | LaPorte | 3.872999907 | STBG State | 2018 | CN | $ 8.480.000 | $ 6.784.000 | $ 1.696.000 | RS |
6 | 0902261 | INDOT | us 12 | District Bridge Project (Rehabilitation) | Bridge Deck Overlay | over Trail Creek, 0.21 miles East of us 35 | LaPorte | 0 | STBG State | 2018 | PE | $ 240.000 | $ 192,000 | $ 48.000 | |
7 | 090226 1 | INDOT | us 12 | District Bridge Project (Rehabilitation) | Bridge Deck Overlay | over Trail Creek, 0.21 miles East of US 35 | LaPorte | 0 | STBG Slate | 2018 | CN | $ 2.654.647 | $ 2.123.718 | $ 530.929 | |
8 | 1006456 | INDOT | PR 1078 | New Road Construction Project | New Road Construction | Illiano Expressway | Lake | 0 | State | PE | $ - | $ - | $ - | RS/NE | |
9 | 1006456 | INDOT | PR 1078 | New Road Construction Project | New Road Construction | Illiano Expressway | Lake | 0 | Stole | CN | $ - | $ | $ - | RS/NE | |
10 | 1006608 | INDOT | SR 130 | District lnte"ection Improvement Project | Other lnte"ection Improvement | SR 130 & CR 600N. 0.65 miles E ol Lake/Porter Co LineOO | Porter | 0 | STBG State | 2018 | PE | $ 50.000 | $ 40.000 | $ 10.000 |
M•
2018-2021 Transportation Improvement Program for Lake, LaPorte, and Porter Counties, Indiana
Northwestern Indiana Regional Planning Commission Original All Project List March 2017
Federal Non-Federal
Non Exempt (NE) and/or
Row ID Des # Sponsor Roule Work Category Work Type Location County Des Length Fund Type Year Phase Total Federal Funds Funds Regionally
Significant
(RS)
11 1006608 INDOT SR 130
District Intersection
other
Intersection
SR 130 & CR
600N. 0.65 miles E
Porter 0 STBG State 2018 UTl $ 50.000 $ 40.000 $ 10.000
Improvement of Lake/Porter Co Improvement
Project
LineOO
12 1006608 INDOT SR 130
District Intersection Improvement Project
Other Intersection Improvement
SR 130 & CR
600N. 0.65 miles E of Lake/Porter Co LineOO
Porter 0 STBG State 2020 CN $ 836.186 $ 668.949 $ 167.237
13 1006608 INDOT SR 130
District Intersection Improvement Project
Other Intersection Improvement
SR 130 & CR
600N. 0.65 miles E of Lake/Porter Co LineOO
Porter 0 STBG State 2020 RR2 $ 350,000 $ 280.000 $ 70.000
District
Intersect. lmprov.
14 1006612 INDOT us 30
Intersection NHPP Non
W/ Added Turn & Randolph St Lake 0
2018 CN $ 537.000 $ 429,600 $ 107.400
Improvement
Project
Lanes
Interstate
15 1006619 INDOT SR 149
District Intersection
Improvement
Intersect. lmprov.
WI Added Turn & CR 1050N Porter 0 STBG Slate 2018 CN $ 643.000 $ 514.400 $ 128.600
Project Lanes
District
Other
16 1006622 INDOT us 20 Intersection Intersection & Waverly Rd Porter 0 STBG Slate 2018 CN $ 799,000 $ 639,200 $ 159.800
Improvement
Project
Improvement
17 1006624 INDOT us 6
District Intersection Improvement Project
other
Intersection & Meridian St Porter 0 STBG State 2018 PE $ 45.000 $ 36.000 $ 9.000
Improvement
lil 1006624 INDOT us 6
District Intersection Improvement Project
Other
Intersection & Meridian St Porter 0 STBG State 2018 CN $ 582.564 $ 466,051 $ 116.513
Improvement
District Bridge
HMA Overlay. from US 30 to US
19 1006634 INDOT SR 51 Project Lake 9.553999901 STBG Slate 2018 PE $ 15.000 $ 12.000 $ 3.000
Functional 20
(Replacement)
•
2018-2021 Transportation Improvement Program for Lake, LaPorte, and Porter Counties, Indiana
Northwestern Indiana Regional Planning Commission Original All Project List March 2017
Non Exempt
Federal Non-Federal [NE) and/or
Row ID Des # Sponsor Roule Work Category Work Type Location County Des Length Year Phase Total Federal Funds Regionally
Fund Type Funds
Significant
[RS)
District Bridge
20 1006634 INDOT SR 51 Project
(Replacement)
HMA Overlay, from US 30 to US Functional 20
Lake 9.553999901 STBG Slate 2018 CN $ 4,994,973 $ 3,995,978 $ 998,995
21 1006635 INDOT US 41
District Small Structure Project
HMA Overlay, from SR 2 N jctlo
Preventive 2.57mi S of US 231 Lake 7.372000217
NHPP Non
2018 CN $ 3, 100,000 $ 2A80,000 $ 620,000
Maintenance (135th Ave) Interstate
NB Bridge over
District Small Bridge Deck Conrail RR, NHPP
22 1006716 INDOT 1 65
Structure Project Replacement
Cenlral Ave and Lake 0 2018 CN $ 4,749,000 $ 4.274,100 $ 474,900 Ditch, 0.67 miles Interstate
N of 180/94
District Bridge
1006746 INDOT 1 94 Project
(Rehabilitation)
District Bridge
1006747 INDOT 1 94 Project
Small Structure 0.86 mi E of US Pipe Lining 421
Small Structure 1.31 mi E of US
LaPorte 0
LaPorte 0
NHPP
Interstate
NHPP
2018 CN $ 489,000 $ 440,100 $ 48,900
2018 CN $ 273,000 $ 245.700 $ 27.300
(Rehabilitation) Pipe Lining 421 Interstate
District Bridge Bridge SR 51. SBL at Burns
1006756 INDOT SR 51 Project Replacement, Ditch (Deep Lake 0 STBG Stale 2018 CN $ 2.314,937 $ 1.851.950 $ 462.987
(Replacement) Concrete River). 2.95 miles
N of US 6
District Bridge Bridge SR 51. SBL at Burns
1006756 INDOT SR 51 Project Replacement, Ditch (Deep Lake 0 STBG State 2018 PE $ 335.000 $ 268.000 $ 67,000 (Replacement) Concrete River). 2.95 miles
N of US 6
$ l.700.000 $ 1,360.000 $ 340,000
1006772 INDOT us 231 Dislrict Small HMA Overlay, from W Jct of SR Lake 5.556000233 NHPP Non 2018 CN Structure Project Functional 55lo US 41 Interstate
District Bridge
1172245 INDOT us 41 Project
(Rehabilitation)
Bridge Deck Replacement
Bridge over Conrail. IHB RR.
and 4 other Lake 0 STBG Slate 2018 CN $ 1.259.000 $ 1.007.200 $ 251.800
streets, 1.95 miles
S of 1-90
•
2018-2021 Transportation Improvement Program for Lake, LaPorte, and Porter Counties, Indiana
Northwestern Indiana Regional Planning Commission Original All Project List March 2017
Row ID Des # Sponsor Roule Work Category Work Type Location County Des Length
Federal Non-Federal
Year Phase Total Federal Funds
Non Exempt (NE) and/or
Regionally
Fund Type
Funds
Slgnfficanl (RS)
29 1172430 INDOT 1 65
Added Travel Added Travel 1-65 ATL from US Lanes Project Lanes 231 to US 30
Lake 5.583000183
NHPP
Interstate
2019 PE $ 3.750.000 $ 3.375.000 $ 375.000 RS/NE
30 1173422 INDOT 1 65
District Small Bridge Deck Slructure Project Replacement
SBBridge over Conrail RR,
Central Ave and Lake 0
Ditch, 0.67 miles N of 180/94
NHPP
Interstate
2018 CN $ 4.749.000 $ 4.274 .100 $ 474.900
District Bridge
1296339 INDOT us 20 Project Bridge Painting
(Rehabilitation}
Bridge over Amtrak and Chandler Rd. 0.88 miles E of SR 520
Porter 0 STBG State 2021 PE $ 50,000 $ 40.000 $ 10.000
District Bridge
1296339 INDOT us 20 Project Bridge Painting
(Rehabilitation}
Bridge over Amtrak and Chandler Rd. 0.88 miles E of SR 520
Porter 0 STBG State 2021 CN $ 572.488 $ 457.990 $ 114.498
District Bridge Bridge over
1296364 INDOT SR 49 Project Bridge Painting Amtrak. 0.33 Porter 0
(Rehabilitation) miles N of 1-94
District Bridge Bridge over
1296364 INDOT SR 49 Project Bridge Painting Amtrak. 0.33 Porter 0
(Rehabilitation} miles N of 1-94
District Bridge Bridge over
NHPP Non
Interstate
NHPP Non
Interstate
NHPP Non
2018 PE $ 27.740 $ 22.192 $ 5.548
2018 RRl $ 100.000 $ 80.000 $ 20.000
1296364 INDOT SR 49 Project Bridge Painting Amtrak. 0.33 Porter 0 Interstate 2020 CN $ 349.312 $ 279.450 $ 69.862
(Rehabilitation} miles N of 1-94
District Bridge Bridge over
NHPP Non
1296364 INDOT SR 49 Project Bridge Painting Amtrak. 0.33 Porter 0 Interstate 2020 CE $ 130.000 $ 104.000 $ 26.000
(Rehabilitation} miles N af 1-94
1296943 INDOT us 20 District Pavement Interchange US 20 at US 35/SR LaPorte 0 STBG State 2018 CN $ 647.000 $ 517.600 $ 129.400
Project (Non-I} Modification 212
M•
2018-2021 Transportation Improvement Program for Lake, LaPorte, and Porter Counties, Indiana
Northwestern Indiana Regional Planning Commission Original All Project List March 2017
Row ID Des # Sponsor Roule Work Category Work Type location County Des Length
Federal Non-Federal
Year Phase Total Federal Funds
Non Exempt (NE) and/or
Regionally
Fund Type
Funds
Significant (RS)
District Bridge NB Bridge over
1296981 INDOT SR 51 Project Bridge Removal Burns Ditch. 0.55 Lake 0 STBG State 2018 CN $ 2.681.955 $ 2.145.564 $ 536.391
(Replacement) miles S of US 20
39 1296986 INDOT 1 65
District Small Structure Project
Bridge lOlsl Avenue
Replacement. over 1-65. 2.50 Lake 0
Steel miles S of US 30
NHPP
Interstate
2018 CN $ 1.472.000 $ l.324.800 $ 147.200
District Bridge
Bridge over
1296990 INDOT us 20 Project Bridge Deck Amtrak and Porter Q STBG Slate 2021 CN $ 3.756.771 $ 3,005.417 $ 751.354
Replacement Chandler Rd. 0.88
(Rehobililotion)
miles E. of SR 520
District Bridge
Bridge over
1296990 INDOT us 20 Project Bridge Deck Amtrak and Porter 0 STBG Slate 2021 PE $ 165.000 $ 132.000 $ 33.000
Replacement Chandler Rd. 0.88
(Rehabilitation)
miles E. of SR 520
District Bridge
Bridge over
1296990 INDOT us 20 Project Bridge Deck Amtrak and Porter 0 STBG State 2021 PE $ 250.000 $ 200.000 $ 50.000
Replacement Chandler Rd. 0.88
(Rehabilitation)
miles E. of SR 520
43 1298068 INDOT SR 2
District Pavement HMA Overlay. Project (Non-I) Functional
From l.4 mi E of
SR 4 (Burson) to LaPorte 6.80000019 l STBG Stale 2018 CN $ 8.741.000 $ 6.992.800 $ 1.748.200
us 20
1298125 INDOT us 20 District Pavement HMA Overlay. From SR 212 to SR LaPorte 4.801000118 STBG State 2018 CN $ 5.333.000 $ 4.266.400 $ l.066.600 Project (Non-I) Functional 39
1298128 INDOT us 20 District Pavement HMA Overlay, From SR 39lo SR 2 LaPorte 7.74300003 l STBG Stale 2018 CN $ 7.642.000 $ 6,113,600 $ l.528.400 Project (Non-I) Functional
46 1298302 INDOT SR 2
District Intersection Improvement Project
Intersection SR 2 al CRlOOS.
Improvement. 4.32 mi. W of US Porter 0 STBG Slate 2018 CN $ l.325.000 $ l.060.000 $ 265.000
Roundabout 30
Added Travel
From l.48 mi. S of
47 1298309 INDOT us 41 District Small Lanes. Construct US 30 (82nd Lane) Lake 0.657999992 NHPP Non 2018 CN $ 2.700.000 $ 2.160.000 $ 540,000
Structure Project
Turn Lanes
lo 0.83 mi. S of US Interstate
30 (77th Ave.)
Page 5 Page s
Northwestern Indiana Regional Planning Commission
2018-2021 Transportation Improvement Program for Lake, LaPorte, and Porter Counties, Indiana
M Original All Project List March 2017
Federal Non-Federal
Non Exempt (NE) and/or
Row ID Des # Sponsor Roule Work Category Work Type location County Des Length
Fund Type
Year Phase Total Federal Funds Funds Regionally
Slgniflcanl
(RS)
48 1298312 INDOT SR 2
District Intersection Improvement Project
District Pavemenl
Other SR 2 at CR 500W.
Intersection 6.79 mi. W of US Porter 0 STBG State 2018 CN $ 530.000 $ 424.000 $ 106.000
Improvement 30
Intersect. lmprov. US 20 at CR
49 1298313 INDOT us 20 W/ Added Turn 400W. 1.44 mi. E LaPorte 0 STBG State 2018 CN $ 1.235.770 $ 988.616 $ 247.154
Project (Non-I)
Lanes of US 35
50 1298316 INDOT us 6
District Intersection Improvement Project
Intersect. lmprov. US 6 al Calumet
WI Added Turn Rd.. 0.48 mi. E of Porter 0 STBG Stale 2018 CN $ 646.859 $ 517.487 $ 129.372
Lanes SR 49
District Bridge
Bridge Thin Deck
Bridge over EJ&E RR. Conrail RR.
51 1298397 INDOT us 12 Project and Carey SI.. Lake 0 STBG Slate 2018 CN $ 3.086.000 $ 2,468,800 $ 617.200
Overlay
(Rehabilitation)
l.33 mi W of SR
912
District Bridge
Bridge Pedestrian
1298398 INDOT us 12 Project Replacement. walkway over US- Lake 0 STBG Slate 2018 RW $ 50.000 $ 40.000 $ 10.000
Other 12. 0.83 mi W of
(Replacement)
Construction SR 912
District Bridge
Bridge Pedestrian
1298398 INDOT us 12 Project Replacement. walkway over US- Lake 0 STBG Stale 2018 UTl $ 102.600 $ 82.080 $ 20.520
Olher 12. 0.83 mi W ol
(Replacement)
Construclion SR 912
Dislrict Bridge
Bridge Pedestrian
1298398 INDOT us 12 Project Replacement. walkway over US- Lake 0 STBG State 2020 CN $ l.139.868 $ 911.894 $ 227.974
Other 12. 0.83 mi W of
(Replacement)
Construction SR 912
District Bridge
Bridge Deck
Bridge over CSX
55 1298402 INDOT us 20 Project RR. l.3 mi. W al Porter 0 STBG State 2018 CN $ 3.257.000 $ 2,605,600 $ 651.400
Replacement
(Rehabilitation)
SR 249
District Bridge
Bridge Deck
Bridge over Conrail RR and
NHPP Non
56 1298444 INDOT us 41 Project 2361h Avenue. Lake 0 2018 PE $ 250.000 $ 200.000 $ 50.000
(Rehabilitation)
Replacement
NBL. 4.54 mi.S of SR 2
Interstate
•
2018-2021 Transportation Improvement Program for Lake, LaPorte, and Porter Counties, Indiana
Northwestern Indiana Regional Planning Commission Original All Project List March 2017
Row ID Des # Sponsor Roule Work Category Work Type Location County Des Length
Federal Non-Federal
Year Phase Total Federal Funds
Non Exempt (NE) and/or Regionally
Fund Type
Funds
Significant (RS)
District Bridge
Bridge Deck
Bridge over Conrail RR and
NHPP Non
57 1298444 INDOT us 41 Project 236th Avenue. Lake 0 2018 CN $ l.755.000 $ l.404.000 $ 351.000
(Rehabilitation)
District Bridge
Replacement
Bridge Deck
NBL. 4.54 mi. S of SR 2
Bridge over Conrail RR and
Interstate
NHPP Non
58 1298448 INDOT us 41 Project 2361h Avenue. Lake 0 2018 CN $ 1.350.000 $ 1.080.000 $ 270,000
(Rehabilitation)
Replacement
SBL. 4.54 mi.S ot SR 2
Interstate
District Bridge
Bridge Deck
Bridge over
NHPP Non
59 1298541 INDOT SR 912 Project Guthrie St.. 0.32 Lake 0 2018 CN $ l.887.000 $ l.509.600 $ 377,400
(Rehabilitation)
Replacement
mi. W of US 12
Interstate
District Bridge
Replace
Bridge over US
NHPP Non
60 1298543 INDOT SR 912 Project 12/lndustrial Lake 0 2018 CN $ l.728.000 $ 1.382.400 $ 345,600
(Rehabilitation)
Superstructure
Highway
Interstate
District Bridge
Replace
SR-912 ramp SSE
NHPP Non
61 1298544 INDOT SR 912 Project over SR-912 and Lake 0 2018 CN $ 2.884.000 $ 2.307.200 $ 576.800
(Rehabilitation)
Superstructure
US-12 WB ramp
Interstate
District Bridge
1298548 INDOT 1 80 Project
Bridge Deck Georgia St bridge NHPP Lake 0
2018 CN $ 1.264.000 $ l.137,600 $ 126.400
(Rehabilitation)
Overlay over 1-80
Interstate
District Bridge
Bridge Deck Georgia St bridge NHPP
1298548 INDOT 1 80 Project
(Rehabilitation)
Overlay over 1-80
Lake 0
Interstate
2018 PE $ 158.000 $ 142,200 $ 15.800
64 1298562 INDOT US 35
District Pavement Small Structure 0.61 mi. S of US-20 Project (Non-I) Main! and Repair (35-46-204.30)
LaPorte 0 STBG State 2018 CN $ 266.335 $ 213.068 $ 53.267
65 1298566 INDOT SR 55
District Small Small Structure 1.03 mi. S of US- Structure Project Main! and Repair 231
Lake 0 STBG State 2018 CN $ 510.000 $ 408,000 $ 102.000
•
201S-2021 Transportation Improvement Program for Lake, LaPorte, and Porter Counties, Indiana
Northwestern Indiana Regional Planning Commission Original All Project List March 2017
Row ID Des # Sponsor Roule Work Category Work Type Location County Des Length
Federal Non-Federal
Year Phase Total Federal Funds
Non Exempt (NE) and/or Regionally
Fund Type
Funds
Slgnmcanl (RS)
66 1298567 INDOT 1 65
District Small Small Structure Structure Project Pipe Lining
Small structure over little
Calumet River. Lake 0
0.17 mi N of I- 80/94
NHPP
Inter.tale
2018 CN $ 570.000 $ 513.000 $ 57.000
1298621 INDOT us 30 District Small Small Structure 0.02 mi. E ol SR-53 Lake 0 NHPP Non 2018 CN $ 660.000 $ 528.000 $ 132.000
Structure Project Maint and Repair Inter.fate
l.56 mi E. of US 41
us us
1383250 INDOT us 12 District Pavement HMA Overlay, (Schrage Ave) to Lake 3.246000051 NHPP Non 2018 PE $ 10.000 $ 8.000 $ 2.000
Project (Non-I) Functional 12 & 20 Jct Interstate
(Columbus Dr)
l.56 mi E. of US 41
us us
1383250 INDOT us 12 District Pavement HMA Overlay. (Schrage Ave) to Lake 3.246000051 NHPP Non 2018 CN $ 2.120.000 $ l.696.000 $ 424.000
Project (Non-I) Functional 12 & 20 Jct Inter.fate
(Columbus Dr)
l.56 mi E. of US 41
us us
1383250 INDOT us 12 District Pavement HMA Overlay. (Schrage Ave) to Lake 3.246000051 NHPP Non 2018 PE $ 180,000 $ 144,000 $ 36.000
Project (Non-I) Functional 12 & 20 Jct Interstate
(Columbus Dr)
71 1383583 INDOT SR 49
District Pavement HMA Overlay. From SR 8 to US Project (Non-I) Functional 30
Porter 8.751000404 STBG State 2019 PE $ 450.000 $ 360,000 $ 90.000
72 1383583 INDOT SR 49
District Pavement HMA Overlay. From SR 8 to US Project (Non-I) Functional 30
Porter 8.751000404 STBG State 2019 CN $ 5,537,477 $ 4,429.982 $ 1.107,495
1383614 INDOT us 20 New Interchange New Interchange at SR 2 LaPorte 0 STBG State 2019 CN $ ll.748.000 $ 9,398.400 $ 2.349,600 Project Construction
lnter.ection Intersection Intersection of SR
NHPP Non
1383615 INDOT SR 55 Improvement Improvement. 55 and 73rd Ave.. Lake 0 Inter.late 2019 RW $ 500.000 $ 400.000 $ 100,000 Project Roundabout l.O mi N of US 30
Intersection lnter.ection Intersection of SR
NHPP Non
1383615 INDOT SR 55 Improvement Improvement 55 and 73rd Ave.. Lake 0 Interstate 2019 UT2 $ 120.000 $ 96.000 $ 24.000
Project Roundabout l.O mi N of US 30
Page s Page s
M•
2018-2021 Transportation Improvement Program for Lake, LaPorte, and Porter Counties, Indiana
Northwestern Indiana Regional Planning Commission Original All Project List March 2017
Row ID | Des # | Sponsor | Route | Work Category | Work Type | location | County | Des Length | Federal Fund Type | Total | Federal Funds | Non-Federal Funds | Non Exempt (NE) and/or Regionally Slgnlncant (RS) | |||
Year | Phase | |||||||||||||||
76 | 1383615 | INOOT | SR 55 | Intersection Improvement Project | lnte,.ection Improvement. Roundabout | Intersection of SR 55 and 73rd Ave., 1.0 mi N of US 30 | Lake | 0 | NHPP Non Interstate | 2020 | CN | $ 1.996.000 | $ 1.596.800 | $ 399.200 | ||
77 | 1383615 | INDOT | SR 55 | lnte,.ection Improvement Project | Intersection Improvement. Roundabout | Intersection of SR 55 and 73rd Ave.. 1.0 mi N of US 30 | Lake | 0 | NHPP Non lnte,.tate | 2020 | CE | $ 170,000 | $ 136.000 | $ 34.000 | ||
78 | 1383631 | INOOT | us 6 | Intersection Improvement Project | Intersection Improvement. Roundabout | lnte,.ection of US 6 and SR 2 | LaPorte | 0 | NHPP Non Interstate | 2018 | PE | $ 5.000 | $ 4.000 | $ 1.000 | ||
79 | 1383631 | INOOT | us 6 | lnte,.ection Improvement Project | lnte,.ection Improvement. Roundabout | lnte,.ec1ion of US 6 and SR 2 | LaPorte | 0 | NHPP Non lnte,.tote | 2018 | un | $ 5,000 | $ 4,000 | $ 1.000 | ||
80 | 1383631 | INOOT | us 6 | lnte,.ection Improvement Project | lnte,.eclion Improvement, Roundabout | lnte,.ection of US 6 and SR 2 | LaPorte | 0 | NHPP Non Interstate | 2019 | CN | $ 1.269,000 | $ 1.015.200 | $ 253.800 | ||
81 | 1383631 | INOOT | us 6 | Intersection Improvement Project | Intersection Improvement. Roundabout | Intersection of US 6 and SR 2 | LaPorte | 0 | NHPP Non lnte,.tote | 2019 | RW | $ 80,000 | $ 64.000 | $ 16,000 | ||
82 | 1383631 | INOOT | us 6 | Intersection Improvement Project | lnteection Improvement. Roundabout | lnte,.ection of US 6 and SR 2 | LaPorte | 0 | NHPP Non Interstate | 2019 | UT2 | $ 35,000 | $ 28,000 | $ 7,000 | ||
83 | 1383631 | INOOT | us 6 | Intersection Improvement Project | Intersection Improvement. Roundabout | lnte,.ection of US 6 and SR 2 | LaPorte | 0 | NHPP Non Interstate | 2020 | CE | $ 54,000 | $ 43,200 | $ 10.800 | ||
84 | 1383633 | INOOT | SR 2 | Intersection Improvement Project | Other Intersection Improvement | at Hoyes-Leonorq | Porter | 0 | NHPP Non Interstate | 2019 | CN | $ 1.234.000 | $ 987.200 | $ 246,800 | ||
85 | 1383635 | INOOT | SR 2 | Intersection Improvement Project | Intersect. lmprov. W/ Added Turn Lones | Intersection of SR 2 at Horse Prairie Ave. 0.25 mi W of us 30 | Porter | 0 | NHPP Non Interstate | 2018 | PE | $ 10.000 | $ 8.000 | $ 2.000 | ||
86 | 1383635 | INOOT | SR 2 | Intersection Improvement Project | Intersect. lmprov. W/ Added Turn Lanes | Intersection of SR 2 at Horse Prairie Ave, 0.25 mi W of us 30 | Porter | 0 | NHPP Non Interstate | 2018 | un | $ 10.000 | $ 8.000 | $ 2.000 |
M•
2018-2021 Transportation Improvement Program for Lake, LaPorte, and Porter Counties, Indiana
Northwestern Indiana Regional Planning Commission Original All Project List March 2017
Federal Non-Federal
Non Exempt (NE) and/or
Row ID Des # Sponsor Route Work Category Work Type Location County Des Length Fund Type Year Phase Total Federal Funds Funds Regionally
Slgnmcant
(RS)
Intersection Intersect. lmprov.
87 1383635 INDOT SR 2 Improvement W/ Added Turn
Intersection of SR
2 al Horse Prairie NHPP Non
Porter 0
2019 RW $ 240.000 $ 192.000 $ 48.000
Ave. 0.25 mi W of
Project Lanes us 30
Interstate
lnlersecfion Intersect. lmprov .
Intersection of SR
2 al Horse Prairie NHPP Non
1383635 INDOT SR 2 Improvement W/ Added Turn Ave, 0.25 mi W of Porter 0 Interstate 2019 UT2 $ 90.000 $ 72.000 $ 18.000
Project Lanes us 30
Intersection Intersect. Improv.
1383635 INDOT SR 2 Improvement W/ Added Turn
Intersection of SR
2 al Horse Prairie NHPP Non
Porter 0
2020 PE $ 42.000 $ 33.600 $ 8.400
Project Lanes
Ave. 0.25 mi W of
US 30
Interstate
Intersection Intersect. lmprov.
90 1383635 INDOT SR 2 Improvement W/ Added Turn
Intersection of SR
2 al Horse Prairie NHPP Non
Porter 0
2020 CN $ 1.057.000 $ 845.600 $ 211.400
Ave. 0.25 mi W of
Project Lanes us 30
Interstate
Intersection lnlersect. lmprov.
91 1383635 INDOT SR 2 Improvement W/ Added Turn
Intersection of SR
2 at Horse Prairie NHPP Non
Porter 0
2020 CE $ 42.000 $ 33.600 $ 8.400
Ave, 0.25 mi W of
Project Lanes us 30
Interstate
Auxiliary Lanes.
From US 231lo
District Pavement 1.99 mi. N of US NHPP Non
92 1383695 INDOT us 41
Project (Non-I)
Two-way Left Turn Lanes
231 (93rd
Avenue)
Lake 1.998000026
Interstate
2019 CN $ 4,989 .000 $ 3.991.200 $ 997.800
District Bridge Bridge Bridge Over
1383706 INDOT SR 8 Project Replacement, Hanna Arm. 2.01 LaPorte 0 STBG Stale 2018 PE $ 77.000 $ 61.600 $ 15,400 (Replacement) Steel miW olSR 39
District Bridge Bridge Bridge Over
1383706 INDOT SR 8 Project Replacement. Hanna Arm. 2.01 LaPorte 0 STBG Stale 2018 RW $ 30.000 $ 24,000 $ 6.000
(Replacement) Steel miW of SR 39
M•
2018-2021 Transportation Improvement Program for Lake, LaPorte, and Porter Counties, Indiana
Northwestern Indiana Regional Planning Commission Original All Project List March 2017
Row ID | Des # | Sponsor | Route | Work Category | Work Type | Location | County | Des Length | Federal Fund Type | Year | Phase | Total | Federal Funds | Non-Federal Funds | Non Exempt (NE) and/or Regionally Slgnfflcant (RS) | |||
95 | 1383706 | INDOT | SR 8 | District Bridge Project !Replacement) | Bridge Replacement. Steel | Bridge Over Hanna Arm, 2.01 miW of SR 39 | LaPorte | 0 | STBG Slate | 2018 | CN | $ | 684.207 | $ | 547.366 | $ | 136.841 | |
96 | 1383711 | INDOT | us 41 | District Bridge Project !Rehabilitation) | Bridge Deck Overlay | 01.20 N US-30 | Lake | 0 | NHPP Non Interstate | 2019 | CN | $ | 2.875 .000 | $ | 2.300.000 | $ | 575.000 | |
97 | 1383718 | INDOT | 1 94 | District Small Structure Project | Small Structure Pipe Lining | 3.21 mi E of US 421 | LaPorte | 0 | NHPP Interstate | 2019 | CN | $ | 345.000 | $ | 310.500 | $ | 34.500 | |
98 | 1383719 | INDOT | us 30 | District Small Structure Project | Small Structure Main! and Repair | Box Culvert near CR 325 E - WB | Porter | 0 | NHPP Non Interstate | 2019 | CN | $ | 117,000 | $ | 93.600 | $ | 23.400 | |
99 | 1383725 | INDOT | us 6 | Intersection Improvement Project | HMA Overlay. Functional | From SR 51 to 0.51 mi E of SR 51 !Union St) | Lake | 0.514999986 | NHPP Non Interstate | 2018 | PE | $ | 50.000 | $ | 40.000 | $ | 10,000 | |
100 | 1383725 | INDOT | us 6 | Intersection Improvement Project | HMA Overlay, Functional | From SR 51 to 0.51 miE of SR 51 !Union St) | Lake | 0.514999986 | NHPP Non Interstate | 2020 | CN | $ | 587,898 | $ | 470.318 | $ | 117.580 | |
101 | 1400116 | INDOT | US 35 | Intersection Improvement Project | HMA Overlay. Functional | Boyd to SR 2 | LaPorte | 2.51999998 1 | STBG State | 2020 | CN | $ | 2.706 .347 | $ | 2.165.078 | $ | 54 1.269 | |
102 | 1400204 | INDOT | us 12 | District Bridge Project !Rehabilitation) | Bridge Deck Replacement | 0.51 mi. W of US 20 Iliff Bridge) | Lake | 0 | NHPP Nan Interstate | 2019 | PE | $ | 69.600 | $ | 55.680 | $ | 13.920 | |
103 | 1400204 | INDOT | us 12 | District Bridge Project IRehobilitation) | Bridge Deck Replacement | 0.51 mi.W of US 20 !Lift Bridge) | Lake | 0 | NHPP Non Interstate | 2019 | CN | $ | 464 .000 | $ | 371.200 | $ | 92.800 | |
104 | 1400287 | INDOT | SR 149 | District Bridge Project !Rehabilitation) | Small Structure Pipe Lining | 1.64 mi S of jct US 20 | Porter | 0 | NHPP Non Interstate | 2018 | CN | $ | 112.901 | $ | 90.32 1 | $ | 22.580 | |
105 | 1401586 | INDOT | us 35 | District Bridge Project !Rehabilitation) | Bridge Deck Sealing | 2.45 mi S of US 6 over the Kankakee River | LaPorte | 0 | STBG State | 2018 | CN | $ | 16.203 | $ | 12,962 | $ | 3,241 |
M•
2018-2021 Transportation Improvement Program for Lake, LaPorte, and Porter Counties, Indiana
Northwestern Indiana Regional Planning Commission Original All Project List March 2017
Row ID | Des # | Sponsor | Roule | Work Category | Work Type | Location | County | Des Length | federal Fund Type | Year | Phase | Total | Federal Funds | Non-Federal Funds | Non Exempt (NE) and/or Regionally Signlflcant (RS) | ||||
106 | 1500081 | INDOT | us 41 | District Bridge Project (Rehabilitalion) | Bridge Replacement. Other Construction | Over GTW RR. 2.80 mi N of US-30 | Lake | 0 | NHPP Non lnte"fate | 2018 | RW | $ | 100.000 | $ 80.000 | $ 20.000 | ||||
107 | 1500081 | INDOT | us 41 | District Bridge Project (Rehabilitation) | Bridge Replacement, Other Construct ion | Over GTW RR. 2.80 mi N of US-30 | Lake | 0 | NHPP Non lnte"tate | 2018 | CN | $ | 5,275.842 | $ 4.220.674 | $ 1.055.168 | ||||
108 | 1500081 | INDOT | us 41 | District Bridge Project (Rehabilitation) | Bridge Replacement. Other Construction | Over GTW RR. 2.80 mi N of US-30 | Lake | 0 | NHPP Non Interstate | 2018 | PE | $ | 575.000 | $ 460.000 | $ 115.000 | ||||
109 | 1500090 | INDOT | us 12 | District Pavement Project (Non-I) | Intersect. Improv. WI Added Tum Lanes | US 12(Columbus Dr) with Railroad Ave & McShane Ave 0.25mi E of US 20 (Indy Blvd) | Lake | 0.056000002 | NHPP Non Interstate | 2018 | PE | $ | 123.000 | $ 98,400 | $ 24.600 | ||||
110 | 1500090 | INDOT | us 12 | District Pavement Project (Non-I) | lnte"ect. lmprov. WI Added Turn Lanes | US 12(Columbus Dr) with Railroad Ave & McShane Ave 0.25mi E of US 20 (Indy Blvd) | Lake | 0.056000002 | NHPP Non Interstate | 2018 | RW | $ | 200.000 | $ 160.000 | $ 40.000 | ||||
111 | 1500090 | INDOT | us 12 | District Pavement Project (Non-I) | lnter>ect. lmprov. W/ Added Turn Lanes | US 12(Columbus Dr) with Railroad Ave & McShane Ave 0.25mi E of US 20 (Indy Blvd) | Lake | 0.056000002 | NHPP Non Interstate | 2018 | CN | $ | 1.543.000 | $ 1.234.400 | $ 308.600 | ||||
1500091 | INDOT | SR 55 | Intersection Improvement Project | lnter>ect. lmprov. W/ Added Turn Lanes | lnterseclion of SR 55 at 57th Ave. 3.0 mi N of US 30 | Lake | 0.108999997 | NHPP Non Interstate | 2019 | RW | $ | 100.000 | $ 80.000 | $ 20,000 |
112
2018-2021 Transportation Improvement Program for Lake, LaPorte, and Porter Counties, Indiana
Northwestern Indiana Regional Planning Commission Original All Project List March 2017
Row ID | Des # | Sponsor | Route | Work Category | Work Type | Location | County | Des Length | Federal Fund Type | Year | Phase | Total | Federal Funds | Non-Federal Funds | Non Exempt (NE) and/or Regionally Significant (RS) | |||||
113 | 1500091 | INDOT | SR 55 | lnfer5ection Improvement Project | Intersect. lmprov. W/ Added Turn Lanes | Intersection of SR 55 at 57th Ave, 3.0 mi N of US 30 | Lake | 0.108999997 | NHPP Non Interstate | 2019 | UT2 | $ | 100.000 | $ | 80.000 | $ | 20,000 | |||
114 | 1500091 | INDOT | SR 55 | Intersection Improvement Project | Intersect. lmprov . W/ Added Turn Lanes | Intersection of SR 55 at 57th Ave, 3.0 mi N of US 30 | Lake | 0.108999997 | NHPP Non Interstate | 2020 | CE | $ | 64.000 | $ | 51.200 | $ | 12.800 | |||
115 | 1500091 | INDOT | SR 55 | Intersection Improvement Project | Intersect. lmprov. W/ Added Turn Lanes | Intersection of SR 55 at 57th Ave, 3.0 mi N of US 30 | Lake | 0.108999997 | NHPP Non Interstate | 2020 | CN | $ | 593,000 | $ | 474.400 | $ | 118,600 | |||
116 | 1500170 | INDOT | JR 1001 | Railroad Grade Crossing Project | Railroad Protection | CR 200S at CN RR DOT# 283306K near Mill Creek | LaPorte | 0 | Sec 130 | 2018 | CN | $ | 320,000 | $ | 320.000 | $ | - | |||
1 17 | 1500171 | INDOT | IR 1001 | Railroad Grade Crossing Project | Railroad Protection | Froberg Rd/150W at CN RR DOT# 283242B W of Valparaiso | Porter | 0 | Sec 130 | 2018 | CN | $ | 320.000 | $ | 320.000 | $ | - | |||
118 | 1500590 | INDOT | us 41 | District Bridge Project !Rehabilitation) | Bridge Painting | Bridge over Conrail RR & 236th Ave, NBL. 4.54 mi S of SR 2 | Lake | 0 | NHPP Non Interstate | 2018 | PE | $ | 13.000 | $ | 10.400 | $ | 2.600 | |||
119 | 1500590 | INDOT | us 41 | District Bridge Project !Rehabilitation) | Bridge Painting | Bridge over Conrail RR & 236th Ave, NBL. 4.54 mi S of SR 2 | Lake | 0 | NHPP Non Interstate | 2018 | CN | $ | 110.028 | $ | 88.022 | $ | 22.006 | |||
120 | 1500602 | INDOT | us 41 | District Bridge Project !Rehabilitation) | Bridge Painting | Bridge over Conrail RR & 236th Ave, SBL. 4.54mi S of SR 2 | Lake | 0 | NHPP Non Interstate | 2018 | CN | $ | 110.028 | $ | 88.022 | $ | 22.006 | |||
121 | 1500602 | INDOT | us 41 | District Bridge Project IRehabilitation) | Bridge Painting | Bridge over Conrail RR & 2361h Ave.SBL. 4.54mi S of SR 2 | Lake | 0 | NHPP Non Interstate | 2018 | PE | $ | 13.000 | $ | 10.400 | $ | 2.600 |
M•
2018-2021 Transportation Improvement Program for Lake, LaPorte, and Porter Counties, Indiana
Northwestern Indiana Regional Planning Commission Original All Project List March 2017
Row ID | Des # | Sponsor | Route | Work Category | Work Type | Location | County | Des Length | Federal Fund Type | Year | Phase | Total | Federal Funds | Non-Federal Funds | Non Exempt (NE) and/or Regionally Significant (RS) | |||
122 | 1500674 | INDOT | 1 80 | District Bridge Project !Rehobililotion} | Bridge Deck Overlay | 1-ro WB Romp NS RR and EJ&E RR. 0.50mi E of SR 912 | Lake | 0 | NHPP Interstate | 2021 | PE | $ | 157.000 | $ | 141.300 | $ | 15.700 | |
123 | 1500674 | INDOT | 1 80 | District Bridge Project !Rehabilitation} | Bridge Deck Overlay | 1-80 WB Romp NS RR and EJ&E RR. 0.50mi E of SR 912 | Lake | 0 | NHPP Interstate | 2021 | CN | $ | l.993,376 | $ | l.794.038 | $ | 199.338 | |
124 | 1500674 | INDOT | 1 80 | District Bridge Project !Rehabilitation} | Bridge Deck Overlay | 1-80 WB Romp NS RR and EJ&E RR. 0.50mi E of SR 912 | Lake | 0 | NHPP Interstate | 20201 | PE | $ | 75.000 | $ | 67,500 | $ | 7,500 | |
125 | 1500689 | INDOT | SR 249 | District Pavement Project (Non-I) | HMA Overlay, Preventive Maintenance | From US 20 to US 12 | Porter | l.904000044 | NHPP Non lnte,.tote | 2018 | CN | $ | 1.065.000 | $ | 852.DOO | $ | 213.000 | |
126 | 1592854 | INDOT | us 41 | District Pavement Project (Non-I} | HMA Overloy, Preven1ive Maintenance | From 1-80/94 to 0.77mi S of 1-90 (Huehn St} | Lake | 0.001 | NHPP Non Interstate | 2018 | PE | $ | 70,DOO | $ | 56,000 | $ | 14.DOO | |
127 | 1592854 | INDOT | us 41 | District Pavement Project !Non-I} | HMA Overlay, Preventive Maintenance | From 1-80/94 to 0.77mi S of 1-90 !Huehn St} | Lake | 0.001 | NHPP Non Interstate | 2018 | PE | $ | 275.000 | $ | 220,000 | $ | 55.000 | |
128 | 1592854 | INDOT | us 41 | District Pavement Project (Non-I} | HMA Overlay. Preventive Maintenance | From 1-80/94 to 0.77mi S of 1-90 (Huehn St} | Lake | 0.001 | NHPP Non Interstate | 2018 | CN | $ | 2.782.000 | $ | 2,225,600 | $ | 556.400 | |
129 | 1592857 | INDOT | SR 49 | District Pavement Project !Non-I} | HMA Overlay, Functional | Fram l.l4mi S of SR 8 to SR 8 | Porter | l.l67999983 | STBG State | 2018 | CN | $ | 412.419 | $ | 329.935 | $ | 82.484 | |
130 | 1592857 | INDOT | SR 49 | District Pavement Project !Non-I) | HMA Overlay. Functional | From l.l4mi S ol SR 8 to SR 8 | Porter | l.l67999983 | STBG State | 2018 | PE | $ | 58.000 | $ | 46.400 | $ | l l.600 | |
131 | 1592873 | INDOT | SR 912 | District Bridge Project (Rehabilitation} | Scour Protection (Erosion} | .22mi E of 1-80. Little Calumet River | Lake | 0 | NHPP Non Interstate | 2018 | CN | $ | 159.414 | $ | 127,531 | $ | 31.883 | |
132 | 1592873 | INDOT | SR 912 | District Bridge Project (Rehabilitation) | Scour Protection !Erosion} | .22mi E al 1-80, Little Calumet River | Lake | 0 | NHPP Non Interstate | 2018 | PE | $ | 22.500 | $ | 18.000 | $ | 4.500 |
M•
2018-2021 Transportation Improvement Program for Lake, LaPorte, and Porter Counties, Indiana
Northwestern Indiana Regional Planning Commission Original All Project List March 2017
Row ID Des # Sponsor Route Work Category Work Type Location County Des Length
Federal Fund Type
Year Phase Total federal Funds
Non-Federal Funds
Non Exempt (NE) and/or Reglonally Significant (RS)
District Bridge
Bridge Deck NHPP
1593079 INDOT 1 80 Project
(Rehabilitation)
Sealing
1.18mi E of SR 53 Lake 0
Interstate
2018 PE $ 28.523 $ 25.671 $ 2.852
District Bridge
1593079 INDOT 1 80 Project
Bridge Deck
1.18mi E of SR 53 Lake 0
NHPP
2020 CN $ 388.942 $ 350.048 $ 38.894
(Rehabilitation)
Sealing Interstate
District Bridge
1593079 INDOT 1 80 Project
Bridge Deck NHPP
1.18mi E of SR 53 Lake 0
2020 CE $ 29.712 $ 26,741 $ 2.971
(Rehabilitation)
Sealing
Interstate
District Bridge
Bridge Deck 73rd over 1-65. NHPP
136 1593213 INDOT 1 65 Project Lake 0 2018 PE $ 157.000 $ 141,300 $ 15,700
Overlay 0,94mi N of US 30 Interstate
(Rehabilitation)
District Bridge
Bridge Deck 73rd over 1-65. NHPP
1593213 INDOT 1 65 Project
(Rehabilitation)
Overlay 0.94mi N of US 30
Lake 0
Interstate
2020 CN $ 886.906 $ 798.215 $ 88.691
District Bridge
1593213 INDOT 1 65 Project
Bridge Deck 73rd over 1-65.
Lake 0
NHPP
2020 CE $ 117,750 $ 103.620 $ 14,130
(Rehabilitation)
Overlay 0.94mi N of US 30 Interstate
District Bridge
1593219 INDOT 1 80 Project
Bridge Deck SR 912 EB Ramp
Lake 0
NHPP
2018 PE $ 82.380 $ 74.142 $ 8.238
(Rehabilitation)
Overlay to 1-80 at N&S RR Interstate
District Bridge
Bridge Deck SR 912 EB Ramp NHPP
1593219 INDOT 1 80 Project
(Rehabilitation)
Overlay to 1-80 at N&S RR
Lake 0
Interstate
2020 CN $ 949.232 $ 854.309 $ 94,923
District Bridge
1593219 INDOT 1 80 Project
Bridge Deck SR 912 EB Ramp
Lake 0
NHPP
2020 CE $ 126.000 $ 113.400 $ 12.600
(Rehabilitation)
Overlay to 1-80 at N&S RR Interstate
142 1593246 INDOT 1 94
District Small Small Structure Structure Project Pipe Lining
0.94mi E of SR 51 Lake 0
NHPP
Interstate
2019 CN $ 200.000 $ 180.000 $ 20.000
2018-2021 Transportation Improvement Program for Lake, LaPorte, and Porter Counties, Indiana
Northwestern Indiana Regional Planning Commission Original All Project List March 2017
Row ID Des # Sponsor Roule Work Category Work Type Location County Des Length
Federal Non-Federal
Year Phase Total Federal Funds
Non Exempt
(NE) and/or Regionally
Fund Type
Funds
Significant (RS)
143 1593246 INDOT 1 94
District Small Small Structure Structure Project Pipe Lining
0.94mi E of SR 51 Lake 0
NHPP
Interstate
2019 PE $ 30,000 $ 27,000 $ 3.000
144 1593247 INDOT 1 94
District Small Small Structure 2.66 mi E of US Structure Project Pipe Lining 421
LaPorte 0
NHPP
Interstate
2019 PE $ 30,000 $ 27.000 $ 3.000
145 1593247 INDOT 1 94
District Small Small Structure 2.66 mi E of US Structure Project Pipe Lining 421
LaPorte 0
NHPP
Interstate
2019 CN $ 200.000 $ 180.000 $ 20,000
146 1593248 INDOT 1 94
District Small Small Structure 4.56 mi E of US Structure Project Pipe Lining 421
LaPorte 0
NHPP
Interstate
2019 PE $ 30,000 $ 27.000 $ 3.000
147 1593248 INDOT 1 94
District Small Small Structure 4.56 mi E of US Structure Project Pipe Lining 421
LaPorte 0
NHPP
Interstate
2019 CN $ 200.000 $ 180.000 $ 20.000
148 1593265 INDOT us 421
District Pavement Project (Non-I)
HMA Overlay, From SR 2 (N Jct)
Preventive to 0.3mi S of I 94 LaPorte 6.373000145
Maintenance (CR 300 N)
NHPP Non
Interstate
2019 CN $ 1.567.500 $ 1.254,000 $ 313.500
149 1593265 INDOT us 421
District Pavement Project (Non-I)
HMA Overlay. From SR 2 (N Jct)
Preventive to 0.3mi S of I 94 LaPorte 6.373000145
Maintenance (CR 300 N)
NHPP Non
Interstate
2019 PE $ 156.750 $ 125.400 $ 31.350
District Bridge
1593278 INDOT SR 49 Project
(Rehabilitation)
Bridge Deck Over Cook Dilch. Overlay 4.01mi S of SR 8
Parter 0 STBG State 2019 CN $ 200.000 $ 160.000 $ 40.000
District Bridge
1593278 INDOT SR 49 Project
(Rehabilitation)
Bridge Deck Over Cook Ditch. Overlay 4.0lmi S ot SR 8
Porter 0 STBG State 2019 PE $ 30.000 $ 24.000 $ 6.000
152 1600012 INDOT I 65
District Small Small Structure Structure Project Pipe Lining
2.96 mi S of SR 2 Lake 0
NHPP
Interstate
2018 CN $ 165.000 $ 148.500 $ 16.500
153 1600012 INDOT 1 65
District Small Small Structure Structure Project Pipe Lining
2.96 mi S of SR 2 Lake 0
NHPP
Interstate
2018 PE $ 20.625 $ 18.563 $ 2.063
M•
2018-2021 Transportation Improvement Program for Lake, LaPorte, and Porter Counties, Indiana
Northwestern Indiana Regional Planning Commission Original All Project list March 2017
Non Exempt
Federal Non-Federal (NE) and/or
Row ID Des # Sponsor Route Work Category Work Type Location County Des Length Year Phase Total Federal Funds Regionally
Fund Type Funds
Slgniltcant
(RS)
District Bridge
1600015 INDOT 1 80 Project
Bridge Thin Deck 2.03 mi W of SR 53
Lake 0
NHPP
2018 CN $ 322.193 $ 289,974 $ 32,219
1Rehabilila1ion)
Overlay at 1-80/94 EB/WB lnte"tate
District Bridge
1600015 INDOT 1 80 Project
(Rehabilitation)
Bridge Thin Deck 2.03 mi W of SR 53 NHPP
Overlay al 1-80/94 EB/WB Lake 0 Interstate 2018 PE $ 40.275 $ 36,248 $ 4.028
Oislrict Bridge
1600026 INDOT SR 51 Project
(Replacement)
Traffic Signals Modernization
SR 51 & Petro
Truck Plaza Dr., Lake 0
2.95mi N of US 6
NHPP Non
Interstate
2018 CN $ 95,219 $ 76,175 $ 19,044
157 1600028 INDOT us 12
District Pavement Project (Non-I)
HMA Overlay, From US 20
Preventive (Columbus Dr.) to Lake
Maintenance SR 912
NHPP Non
lnte"tate
2018 PE $ 122.000 $ 97,600 $ 24.400
158 1600028 INDOT us 12
District Pavement Project (Non-I)
HMA Overlay, From US 20
Preventive (Columbus Dr.) o Lake
NHPP Non
2020 CN $ 1.524,583 $ 1.219,666 $ 304,917
Maintenance SR 912 Interstate
159 1600028 INDOT us 12
District Pavement Project (Non-I)
HMA Overlay, From US 20
Preventive (Columbus Or.)lo Lake
NHPP Non
2020 CE $ 134,900 $ 107,920 $ 26,980
Maintenance SR 912 Interstate
160 1600029 INDOT us 12
161 1600029 INOOT us 12
District Pavement Project (Non-I)
District Pavement Project (Non-I)
From I.07mi W of HMA Overlay, SR 249 (Burns
Preventive Harbor Ditch) To Porter 3.930000067
Maintenance J.32mi E of SR I49
(Oak Hill Rd)
From I.07mi W ot HMA Overlay, SR 249 (Burns
Preventive Harbor Ditch) To Porter 3.930000067
NHPP Non
lnte"lale
NHPP Non
2019 CN $ 1.960,000 $ 1.568.000 $ 392,000
2019 PE $ 196,000 $ 156,800 $ 39,200
Maintenance J.32mi E ol SR 149 Interstate
(Oak Hill Rd)
HMA Overlay. From 0.24 mi W of
162 1600340 INOOT us 20 District Pavement Preventive SR 149 to 0.1 lmi E Porter 1.406999946 NHPP Non 2019 CN $ 755.000 $ 604.000 $ 151.000
Project (Non-I)
Maintenance
of 1-94 (Babcock Interstate
Rd)
M•
2018-2021 Transportation Improvement Program for Lake, LaPorte, and Porter Counties, Indiana
Northwestern Indiana Regional Planning Commission Original All Project List March 2017
Row ID | Des # | Sponsor | Roule | Work Category | Work Type | Location | County | Des Length | Federal Fund Type | Year | Phase | Total | Federal Funds | Non-Federal Funds | Non Exempt (NE) and/or Regionally Significant (RS) | |||
163 | 1600340 | INDOT | us 20 | District Pavement Project (Non-I) | HMA Overlay. Preventive Maintenance | From 0.24 mi W of SR 149 to 0.11 mi E of 1-94 (Babcock Rd) | Porter | 1.406999946 | NHPP Non Interstate | 2019 | PE | $ | 113.000 | $ | 90.400 | $ | 22.600 | |
164 | 1600344 | INDOT | us 35 | District Pavement Project (Non-I) | Concrete Pavement Restoralion (CPR) | From SR 2 (in LaPorte) to 0.5mi N of SR 2 | LaPorte | 0.493999988 | STBG State | 2019 | CN | $ | 604.000 | $ | 483.200 | $ | 120.800 | |
165 | 1600344 | INDOT | us 35 | District Pavement Project (Non-I) | Concrete Pavement Restoration (CPR) | From SR 2 (in LaPorte) lo 0.5mi N of SR 2 | LaPorte | 0.493999988 | STBG Slate | 2019 | PE | $ | 90.000 | $ | 72.000 | $ | 18.000 | |
166 | 1600346 | INDOT | us 421 | District Pavement Project (Non-I) | HMA Overlay. Preventive Maintenance | From 0.52 mi N of 1-94 (Gruenke Rd) to US 20 | LaPorte | 0.99299997 l | NHPP Non Interstate | 2019 | CN | $ | 485.000 | $ | 388.000 | $ | 97.000 | |
167 | 1600346 | INDOT | us 421 | District Pavement Project (Non-I) | HMA Overlay, Preven1ive Maintenance | From 0.52 mi N of 1-94 (Gruenke Rd) to US 20 | LaPorte | 0.992999971 | NHPP Non Interstate | 2019 | PE | $ | 97.000 | $ | 77.600 | $ | l9.400 | |
168 | 1600351 | INDOT | us 30 | District Bridge Project (Rehabilitation) | Bridge Deck Overlay | Over Deep River, l.96mi E of SR 51 | Lake | 0 | NHPP Non Interstate | 2019 | CN | $ | 850.000 | $ | 680,000 | $ | 170.000 | |
169 | 1600351 | INDOT | us 30 | District Bridge Project (Rehabilitation) | Bridge Deck Overlay | Over Deep River, l.96mi E of SR 51 | Lake | 0 | NHPP Non Interstate | 2019 | PE | $ | 170.000 | $ | 136.000 | $ | 34.000 | |
170 | 1600352 | INDOT | us 20 | District Bridge Project (Rehabilitation) | Bridge Pointing | Over 1-90. 3.60 mi E of SR 39 | LaPorte | 0 | STBG State | 2019 | PE | $ | 135.000 | $ | 108.000 | $ | 27.000 | |
171 | 1600352 | INDOT | us 20 | District Bridge Project (Rehabilitation) | Bridge Pointing | Over 1-90. 3.60 mi E of SR 39 | LoPorte | 0 | STBG Stole | 2019 | CN | $ | 1,350.000 | $ | l.080.000 | $ | 270.000 | |
172 | 1600358 | INDOT | us 20 | Environmental Mitigation Project | Environmental Mitigation | US 421 to US 35/SR 212 in Michigan City | LaPorte | 3.882999897 | NHPP Non lntef5tate | 2018 | CN | $ | 300.000 | $ | 240.000 | $ | 60.000 |
M•
2018-2021 Transportation Improvement Program for Lake, LaPorte, and Porter Counties, Indiana
Northwestern Indiana Regional Planning Commission Original All Project List March 2017
Row ID | Des # | Sponsor | Route | Work Category | Work Type | Location | County | Des Length | Federal Fund Type | Year | Phase | Total | Federal Funds | Non-Federal Funds | Non Exempt (NE) and/or Regionally Significant (RS) | ||||
173 | 1600406 | INDOT | SR 912 | District Pavement Project (Non-I) | HMA Overlay, Preventive Maintenance | From 0.1 mi N of Highway Avelo Ridge Road | Lake | 0.363000005 | NHPP Non Interstate | 2018 | CN | $ | 218,175 | $ | 174,540 | $ | 43.635 | ||
174 | 1600406 | INDOT | SR 912 | District Pavement Project (Non-I) | HMA Overlay, Preventive Maintenance | From O.lmi N of Highway Ave to Ridge Road | Lake | 0.363000005 | NHPP Non Interstate | 2018 | PE | $ | 30,000 | $ | 24.000 | $ | 6,000 | ||
175 | 1600406 | INDOT | SR 912 | Dislrict Pavement Project (Non-I) | HMA Overlay, Preventive Maintenance | From 0.1mi N of Highway Ave to Ridge Road | Lake | 0.363000005 | NHPP Non Interstate | 2018 | PE | $ | 10.000 | $ | 8,000 | $ | 2.000 | ||
176 | 1600448 | INDOT | VA VARI | Railroad Grade Crossing Project | Railroad Protection | Tryon Road at CSX DOT #232070F in Michigan City | LaPorte | 0 | Sec 130 | 2018 | PE | $ | 20.000 | $ | 20.000 | $ | - | ||
177 | 1600448 | INDOT | VA VARI | Railroad Grade Crossing Project | Railroad Protection | Tryon Road at CSX DOT #232070F in Michigan City | LaPorte | 0 | Sec 130 | 2019 | CN | $ | 320.000 | $ | 320.000 | $ | - | ||
178 | 1600449 | INDOT | VA VARI | Railroad Grade Crossing Project | Railroad Protection | Tilden Street al CSX RR DOT #232080L in Michigan City | LaPorte | 0 | Sec 130 | 2018 | PE | $ | 20,000 | $ | 20.000 | $ | |||
179 | 1600449 | INDOT | VA VARI | Railroad Grade Crossing Project | Railroad Protection | Tilden Street at CSX RR DOT #232080L in Michigan City | LaPorte | 0 | Sec 130 | 2019 | CN | $ | 320.000 | $ | 320.000 | $ | - | ||
180 | 1600450 | INDOT | VA VARI | Railroad Grade Crossing Project | Railroad Protection | Sohl Street at IHB DOT #326991 C in Hammond | Lake | 0 | Sec 130 | 2018 | PE | $ | 20.000 | $ | 20.000 | $ | - | ||
181 | 1600450 | INDOT | VA VARI | Railroad Grade Crossing Project | Railroad Protection | Sohl Street at IHB DOT #326991 C in Hammond | Lake | 0 | Sec 130 | 2019 | CN | $ | 400.000 | $ | 400.000 | $ | - | ||
182 | 1600451 | INDOT | VA VARI | Railroad Grade Crossing Project | Railroad Protection | Roeske Ave at CSX DOT #232074H in Michigan City | LaPorte | 0 | Sec 130 | 2018 | PE | $ | 20.000 | $ | 20.000 | $ |
M•
2018-2021 Transportation Improvement Program for Lake, LaPorte, and Porter Counties, Indiana
Northwestern Indiana Regional Planning Commission Original All Project List March 2017
Row ID | Des # | Sponsor | Route | Work Category | Work Type | Location | County | Des Length | Federal Fund Type | Year | Phase | Total | Federal Funds | Non-Federal Funds | Non Exempt (NE) and/or Regionally Slgnfficant (RS) | |||
183 | 1600451 | INDOT | VA VARI | Railroad Grade Crossing Project | Railroad Protection | Roeske Ave at CSX DOT #232074H in Michigan City | LaPorte | 0 | Sec 130 | 2019 | CN | $ | 320,000 | $ | 320,000 | $ | - | |
184 | 1600452 | INDOT | VA VARI | Railroad Grade Crossing Project | Railroad Protection | Greenwood Ave at CSX DOT #232075P in Michigan City | LaPorte | 0 | Sec 130 | 2018 | PE | $ | 20,000 | $ | 20,000 | $ | - | |
185 | 1600452 | INDOT | VA VARI | Railroad Grade Crossing Project | Railroad Protection | Greenwood Ave at CSX DOT #232075P in Michigan City | LaPorte | 0 | Sec 130 | 2019 | CN | $ | 320,000 | $ | 320.000 | $ | ||
186 | 1600454 | INDOT | VA VARI | Railroad Grade Crossing Project | Railroad Protection | Carroll Ave at CSX DOT #232077D in Michigan City | LaPorte | 0 | Sec 130 | 2018 | PE | $ | 20,000 | $ | 20,000 | $ | - | |
187 | 1600454 | INDOT | VA VARI | Railroad Grade Crossing Project | Railroad Protec1ion | Carroll Ave al CSX DOT #232077D in Michigan City | LaPorte | 0 | Sec 130 | 2019 | CN | $ | 320,000 | $ | 320.000 | $ | - | |
188 | 1600455 | INDOT | VA VARI | Railroad Grade Crossing Project | Railroad Proteclion | Calumet St al NS RR DOT #522625P in Chesterton | Porter | 0 | Sec 130 | 2018 | PE | $ | 20,000 | $ | 20,000 | $ | - | |
189 | 1600455 | INDOT | VA VARI | Railroad Grade Crossing Project | Railroad Protection | Calumet SI at NS RR DOT #522625P in Chesterton | Porter | 0 | Sec 130 | 2019 | CN | $ | 320,000 | $ | 320.000 | $ | - | |
190 | 1600481 | INDOT | us 231 | Signal Project !New/Modernize d) | New Signal Installation | Intersection of US 231 at Fathke Rd, 2.8 mi E of US 41 | Lake | 0 | NHPP Non Interstate | 2018 | CN | $ | 120,000 | $ | 96,000 | $ | 24,000 | |
191 | 1600481 | INDOT | us 231 | SignaI Project !New/Modernize d) | New Signal Installation | Intersection of US 231 at Fathke Rd. 2.8 mi E of US 41 | Lake | 0 | NHPP Non Interstate | 2018 | PE | $ | 20,000 | $ | 16.000 | $ | 4,000 |
2018-2021 Transportation Improvement Program for Lake, LaPorte, and Porter Counties, Indiana
Northwestern Indiana Regional Planning Commission Original All Project List March 2017
Row ID | Des # | Sponsor | Route | Work Category | Work Type | location | County | Des ength | Federal Fund Type | Year | Phase | Total | Federal Funds | Non-Federal Funds | Non Exempt (NE) and/or Regionally Signfflcant (RS) | |||
192 | 1600499 | INDOT | US 30 | Intersection Improvement Project | HMA Overlay. Func1ional | From 2.65mi W of W Jct of SR 2 (CR 250W) to 0.6mi E o1SR 49 (Industrial Dr) | Porter | 5.42000007 6 | NHPP Non Interstate | 2020 | PE | $ | 315.000 | $ | 252.000 | $ | 63.000 | |
193 | 1600499 | INDOT | US 30 | Intersection Improvement Project | HMA Overlay, Func1ional | From 2.65mi W of W Jct of SR 2 (CR 250W) o 0.6mi E of SR 49 (Industrial Dr) | Porter | 5.42000007 6 | NHPP Non Interstate | 2020 | CN | $ | 5,160,618 | $ | 4, 128.494 | $ | l.032.124 | |
194 | 1600499 | INDOT | US 30 | Intersection Improvement Project | HMA Overlay. Functional | From 2.65mi W of W Jct of SR 2 (CR 250W)lo 0.6mi E of SR 49 (Industrial Dr) | Porter | 5.42000007 6 | NHPP Non Interstate | 2020 | CE | $ | 315.000 | $ | 252.000 | $ | 63.000 | |
195 | 1600500 | INDOT | SR 249 | District Bridge Project (Replacement) | Replace Superstructure | US 12. 2 RR. 2 Roads. 2.0mi N of 1-94 | Porter | 0 | NHPP Non Interstate | 2018 | PE | $ | l.600.000 | $ | l,280.000 | $ | 320.000 | |
196 | 1600500 | INDOT | SR 249 | District Bridge Project (Replacement) | Replace Supers1ructure | US 12.2 RR.2 Roads. 2.0mi N of 1-94 | Porter | 0 | NHPP Non Interstate | 2020 | CN | $ | 18,938.015 | $ | 15,150.412 | $ | 3.787,603 | |
197 | 1600500 | INDOT | SR 249 | District Bridge Project (Replacement) | Replace Superstructure | US 12. 2 RR. 2 Roads. 2.0mi N of 1-94 | Porter | 0 | NHPP Non Interstate | 2020 | CE | $ | 1,000.000 | $ | 800.000 | $ | 200.000 | |
198 | 1600504 | INDOT | SR 51 | lntersec1ion Improvement Project | Added Travel Lanes.Construct Turn Lanes | lnlersec1ion with 10th St and Lincoln St | Lake | 0.07 | STBG Slate | 2018 | PE | $ | 45.000 | $ | 36.000 | $ | 9.000 | |
199 | 1600504 | INDOT | SR 51 | Intersection Improvement Project | Added Travel Lanes, Construct Turn Lanes | Intersection with 10th SI and Lincoln SI | Lake | 0.07 | STBG State | 2021 | CN | $ | 299,571 | $ | 239.657 | $ | 59,914 | |
200 | 1600694 | INDOT | SR 130 | Intersection Improvement Project | Intersect. lmprov. W/ Added Turn Lanes | SR 130 @ CR 450 w | Porter | 0 | NHPP Non Interstate | 2018 | PE | $ | 56.000 | $ | 44,800 | $ | ll.200 | |
201 | 1600694 | INDOT | SR 130 | Intersection Improvement Project | Intersect. lmprov. W/ Added Tum Lanes | SR 130 @ CR 450 w | Porter | 0 | NHPP Non Interstate | 2021 | CN | $ | 378,629 | $ | 302.903 | $ | 75,726 |
M•
2018-2021 Transportation Improvement Program for Lake, LaPorte, and Porter Counties, Indiana
Northwestern Indiana Regional Planning Commission Original All Project List March 2017
Row ID Des # Sponsor Roule Work Category Work Type Location County Des Length
Federal Non-Federal
Year Phase Total Federal Funds
Non Exempt (NE) and/or Regionally
Fund Type
Funds
Significant (RS)
lnlerseclion lnlersect. lmprov.
NHPP Non
1600700 INDOT SR 130 Improvement W/ Added Turn SR 149 @ SR 130 Porter 0 Interstate 2018 PE $ 69,000 $ 55.200 $ 13,800 Project Lanes
Intersection Intersect. lmprov.
1600700 INDOT SR 130 Improvement WI Added Turn SR 149 @ SR 130 Porter 0
Project Lanes
NHPP Non
lnlerslale
2021 CN $ 462,428 $ 369,942 $ 92.486
District Bridge
1600906 INDOT SR 4 Project
Bridge Deck Overlay
SR 4 @ GTW RR,
2.79 mi E of SR LaPorte 0 STBG Slate 2018 PE $ 63,449 $ 50.759 $ 12.690
(Rehabilitation) 104
District Bridge
1600906 INDOT SR 4 Project
(Rehabilitation)
Bridge Deck Overlay
SR 4 @ GTW RR,
2.79 mi E ol SR LaPorte 0 STBG Slate 2020 PE $ 60,000 $ 48,000 $ 12.000
104
District Bridge
1600906 INDOT SR 4 Project
(Rehabilitation)
Bridge Deck Overlay
SR 4 @ GTW RR,
2.79 mi E of SR LaPorte 0 STBG Slate 2021 CN $ 606.428 $ 485, 142 $ 121.286
104
District Bridge
1600907 INDOT US 12 Project
(Rehabilitation)
US 12 EB @ NS RR.
Bridge Deck Beth Steel Ramp. Overlay 0.24 mi E of SR
149
Porter 0
NHPP Non
Interstate
2018 PE $ 107,000 $ 85,600 $ 21.400
District Bridge
US 12 EB @ NS RR.
1600907 INDOT us 12 Project Bridge Deck Beth Sleel Ramp, Porter 0 NHPP Non 2020 PE $ 65,000 $ 52,000 $ 13.000
Overlay 0.24 mi E of SR Interstate
(Rehabilitation)
149
District Bridge
US 12 EB @ NS RR,
1600907 INDOT us 12 Project Bridge Deck Beth Steel Ramp, Porter 0 NHPP Non 2021 CN $ 1.023.518 $ 818,814 $ 204.704
Overlay 0.24 mi E of SR Interstate
(Rehabililalion)
149
Intersection Intersection Intersection of SR
NHPP Non
1600913 INDOT SR 2 Improvement Improvement, 2 at Heavilin Rd Porter 0 Interstate 2018 PE $ 30,000 $ 24.000 $ 6,000 Project Roundabout (CR 50WJ
Intersection Intersection lnlerseclion of SR
NHPP Non
1600913 INDOT SR 2 Improvement Improvement, 2 at Heavilin Rd Porter 0 lnlerslale 2018 RW $ 30.000 $ 24.000 $ 6,000 Project Roundabout (CR 50WJ
M•
2018-2021 Transportation Improvement Program for Lake, LaPorte, and Porter Counties, Indiana
Northwestern Indiana Regional Planning Commission Original All Project List March 2017
Federal Non-Federal
Non Exempt (NE) and/or
Row ID Des # Sponsor Route Work Category Work Type Location County Des Length Fund Type Year Phase Total Federal Funds Funds Regionally
Signmcant
(RS)
lntersec1ion Intersection Intersection of SR NHPP Non
1600913 INDOT SR 2 Improvement Improvement, 2 al Heavilin Rd Porter 0
Interstate
2019 CN $ 1.493,324 $ l.l94,659 $ 298,665
Project Roundabout (CR SOW)
lntersec1ion Intersection Intersection of SR
NHPP Non
1600913 INDOT SR 2 Improvement Improvement , 2 at Heavilin Rd Porter 0 lnlers1ale 2019 PE $ 203,000 $ 162,400 $ 40,600 Project Roundabout (CR 50W)
District Bridge
1600914 INDOT us 12 Project
US 12 WB @ NS
Bridge Deck RR, Beth Steel Porter 0 NHPP Non
2018 PE $ 107,000 $ 85,600 $ 21.400
(Rehabilitation)
Overlay Ramp, 0.24 mi E
of SR 149
Interstate
District Bridge
US 12 WB @ NS
1600914 INDOT us 12 Project Bridge Deck RR, Beth Steel Porter a NHPP Non 2020 PE $ 65,000 $