2018-2021 Transportation Improvement Program for Lake, Porter, and LaPorte Counties, Indiana

Amendment #03 September 2017


New INDOT Projects/Project Phases


DES


Sponsor


Project Description/Location


TIP Action

Fund Type


Phase


Year


Total Cost


Federal


Non-Federal


1601758


INDOT

US 12 Signs, Lighting, Signals And Markings, Intersection of US 12 and Moore/Eastwood Rd, LaPorte County


Add New Phases

NHPP

Non- Interstate

PE

2018

$ 6,000

$ 4,800

$ 1,200

CN

2019

$ 55,600

$ 44,480

$ 11,120

Located in Michigan City, LaPorte County about 0.57 miles WEST of SR 212.


1600015


INDOT

I-80/94 Bridge Thin Deck Overlay, 2.03 mi W of SR 53 at I-80/94 EB/WB


Change Year

NHPP

Interstate

PE

2019

$ 40,275

$ 36,248

$ 4,028

CN

2019

$ 322,193

$ 289,974

$ 32,219

Located in the City of Gary, Lake County, in the vicinity of Clark Rd.


1172288


INDOT

US 35 Bridge Deck Replacement, Bridge over RR, Washington Street and 2 other streets,

0.19 miles N of SR 2


Add Phase

NHPP

Non- Interstate


CN


2019


$ 11,784,232


$ 9,427,386


$ 2,356,846

Structure named the Edwin Simcox Overpass, located in downtown LaPorte, LaPorte County.


1006746


INDOT

I-94 Small Structure Pipe Lining, 0.77 mi E of US 421


Change Year

NHPP

Interstate


CN


2019


$ 11,784,232


$ 9,427,386


$ 2,356,846

Located in unincorporated LaPorte County.

1006747

INDOT

I-94 Small Structure Pipe Lining, 1.31 mi E of

US 421

Change Year

NHPP

Interstate

CN

2019

$ 281,989

$ 253,790

$ 28,199

Located in unincorporated LaPorte County.


1500090


INDOT

US 12 Intersect. Improv. W/ Added Turn Lanes, US 12(Columbus Dr) with Railroad Ave & McShane Ave 0.25mi E of US 20 (Indy Blvd)


Change Year

NHPP

Non- Interstate


CN


2019


$ 1,543,000


$ 1,234,000


$ 309,000

Located in the City of East Chicago, Lake County.

DES Sponsor Project Description/Location TIP Action Fund

image

Type

NHPP


Phase Year Total Cost Federal Non-Federal

Add Phase

1383633 INDOT SR 2 Intersection Improvements at Hayes-

Leonard Road.

Non- Interstate

RW 2018 $

300,000 $

240,000 $

60,000

Located about 1.98 miles SW of US 30 in unincorporated Porter County. CN in 2019. Cost to complete: $1.6 million.

image



1700059


INDOT


I-94, Small Structure Pipe Lining, 0.77mi E of US 421


NHPP

Add New Phases

Interstate

PE

2019

$

91,000

$

81,900

$

9,100

RW

2021

$

50,000

$

45,000

$

5,000

UT

2021

$

15,000

$

13,500

$

1,500

CN in 2022. Cost to Complete: $325,000.



1700064


INDOT


I-94, Small Structure Pipe Lining, 3.20mi W of State Line


NHPP

Add New Phases

Interstate

PE

2019

$

30,715

$

27,644

$

3,071

RW

2021

$

50,000

$

45,000

$

5,000

UT

2021

$

15,000

$

13,500

$

1,500

CN in 2022. Cost to Complete: $220,000.



1700106


I-94, Replace Superstructure, EB over Norris Ditch, NHPP INDOT Add New Phases

No 3, 2.96mi E of US 421 Interstate

PE

2019

$

207,909

$

187,118

$

20,791

UT

2021

$

50,000

$

45,000

$

5,000

CN in 2022. Cost to Complete: $325,000.



1700107


I-94, Replace Superstructure, WB over Norris NHPP INDOT Add New Phases

Ditch, No 3, 2.96mi E of US 421 Interstate

PE

2019

$

207,909

$

187,118

$

20,791

UT

2021

$

50,000

$

45,000

$

5,000

CN in 2022. Cost to Complete: $325,000.



1701310 INDOT

image

I 94, Small Structure Pipe Lining, 0.70mi E of US 421


Add New Phase

NHPP

Interstate


PE 2019 $ 13,300 $ 11,970 $ 1,330


CN in 2022. Cost to Complete: $150,000.



1701466 INDOT

image

I 65, Small Structure Pipe Lining, 0.28mi NE of US 30 NB


Add New Phase

NHPP

Interstate


PE 2019 $ 67,000 $ 60,300 $ 6,700


CN in 2022. Cost to Complete: $275,000.



1700028


INDOT


SR 2, Small Structure Replacement, 0.17

US 421


mi W of

Add New Phases


STP

PE

2019

$

59,000

$

47,200

$

11,800

RW

2021

$

100,000

$

80,000

$

20,000

UT

2021

$

50,000

$

40,000

$

10,000

CN in 2022. Cost to Complete: $275,000.


DES

Sponsor

Project Description/Location

TIP Action

Fund Type

Phase

Year

Total Cost

Federal

Non-Federal


1701420


INDOT

US 20, Small Structure Pipe Lining, 0.65mi E of SR 39


Add New Phase


NHPP


PE


2019


$ 8,400


$ 6,720


$ 1,680

Cost to Complete: $125,000.


1701424


INDOT

SR 212, Small Structure Pipe Lining, 0.6mi N of US 35


Add New Phase


STP


PE


2019


$ 47,200


$ 37,760


$ 9,440

Cost to Complete: $325,000.


1701441


INDOT

SR 212, Small Structure Pipe Lining, 0.82mi S of JCT of US 12


Add New Phase


STP


PE


2019


$ 4,400


$ 3,520


$ 880

Cost to Complete: $135,000.


1701446


INDOT

SR 2, Bridge Replacement, Steel, Over Hutton Ditch, 2.28mi E of SR 4


Add New Phase


STP


PE


2019


$ 57,500


$ 46,000


$ 11,500

Cost to Complete: $715,000.


1701491


INDOT

SR 104, Small Structure Pipe Lining, 6.60mi E of SR 4


Add New Phase


STP


PE


2019


$ 2,600


$ 2,080


$ 520

Cost to Complete: $125,000.


1701498


INDOT

SR 2, Bridge Replacement, Steel, Over W Branch Crooked Creek, 03.32 E SR 49


Add New Phase


STP


PE


2019


$ 36,500


$ 29,200


$ 7,300

Cost to Complete: $602,000.


1701504


INDOT

US 30, Small Structure Pipe Lining, At CR 700 W EBL


Add New Phase


NHPP


PE


2019


$ 4,000


$ 3,200


$ 800

Cost to Complete: $135,000.


1702104


INDOT

SR 4, Small Structures & Drains Construction 1.8mi E of SR 104


Add New Phase


STP


PE


2019


$ 3,600


$ 2,880


$ 720

Cost to Complete: $245,000.


1700105


INDOT


SR 912, Bridge Replacement, Concrete Ramp H over Ramp b, 1.33mi W of US 12


Add New Phases


NHPP

PE

2019

$ 234,384

$ 187,507

$ 46,877

UT

2021

$ 50,000

$ 40,000

$ 10,000

Cost to Complete: $1,205,000.


1701331


INDOT

US 20, Small Structure Pipe Lining, 0.80 mi E of SR 149


Add New Phase


NHPP


PE


2019


$ 11,200


$ 8,960


$ 2,240

Cost to Complete: $125,000.


1701332


INDOT

US 30, Small Structure Pipe Lining, 1.13 mi E of US 41


Add New Phase


NHPP


PE


2019


$ 6,800


$ 5,440


$ 1,360

Cost to Complete: $154,000.


1701334


INDOT

US 30, Small Structure Pipe Lining 4.73 mi E of SR 51


Add New Phase


NHPP


PE


2019


$ 12,000


$ 9,600


$ 2,400

Cost to Complete: $149,000.


DES

Sponsor

Project Description/Location

TIP Action

Fund Type

Phase

Year

Total Cost

Federal

Non-Federal


1701335


INDOT

US 30, Small Structure Pipe Lining, 4.74 mi W of SR 2


Add New Phase


NHPP


PE


2019


$ 14,800


$ 11,840


$ 2,960

Cost to Complete: $167,000.


1701417


INDOT

SR 2, Bridge Replacement, Steel Over Sager Run, 0.07mi W of US 30


Add New Phase


STP


PE


2019


$ 31,600


$ 25,280


$ 6,320

Cost to Complete: $875,000.


1701422


INDOT

US 41, Small Structure Pipe Lining, 1.20mi N of JCT of US 231


Add New Phase


NHPP


PE


2019


$ 17,600


$ 14,080


$ 3,520

Cost to Complete: $181,000.


1701443


INDOT

US 20, Small Structure Pipe Lining, 0.36mi E of SR 149


Add New Phase


NHPP


PE


2019


$ 4,000


$ 3,200


$ 800

Cost to Complete: $135,000.


1701444


INDOT

US 231, Small Structure Pipe Lining, 1.50mi W of SR 55


Add New Phase


NHPP


PE


2019


$ 4,800


$ 3,840


$ 960

Cost to Complete: $147,000.


1701445


INDOT

SR 2, Bridge Replacement, Steel, Over Wolf Creek, 6.61mi W of US 30


Add New Phase


STP


PE


2019


$ 67,700


$ 54,160


$ 13,540

Cost to Complete: $1,115,000.


1701448


INDOT

SR 149, Small Structure Pipe Lining, 1.31mi N of JCT SR 130


Add New Phase


STP


PE


2019


$ 4,500


$ 3,600


$ 900

Cost to Complete: $137,000.


1701442


INDOT

US 20, Small Structure Replacement, 2.74mi W of SR 149


Add New Phase


NHPP


PE


2019


$ 4,000


$ 3,200


$ 800

Cost to Complete: $141,000.


1701454


INDOT

SR 51,Small Structure Pipe Lining, 3.30mi N of US 30


Add New Phase


STP


PE


2019


$ 3,200


$ 2,560


$ 640

Cost to Complete: $124,000.


1701472


INDOT

SR 312, Small Structure Pipe Lining, 0.01mi W of SR 912


Add New Phase


NHPP


PE


2019


$ 9,600


$ 7,680


$ 1,920

Cost to Complete: $224,000.


1701473


INDOT

SR 312, Small Structure Pipe Lining, 0.03mi E of SR 912


Add New Phase


STP


PE


2019


$ 9,600


$ 7,680


$ 1,920

Cost to Complete: $224,000.


1701482


INDOT


SR 49, Small Structure Pipe Lining, 2.94 mi S of SR 8


Add New Phase


STP


PE


2019


$ 11,200


$ 8,960


$ 2,240

Cost to Complete: $279,000.


1701509


INDOT

US 231, Small Structure Pipe Lining, 3.50mi W of SR 55


Add New Phase


NHPP


PE


2019


$ 20,000


$ 16,000


$ 4,000

DES Sponsor Project Description/Location TIP Action Fund

Type


Phase Year Total Cost Federal Non-Federal


image

Cost to Complete: $124,000.



1700087


US 41, Replace Superstructure, NB over Brown

INDOT Add New Phases NHPP

Ditch

PE

2019

$

149,979

$

119,983

$

29,996

UT

2021

$

50,000

$

40,000

$

10,000

Cost to Complete:$1.05 million. Unincorporated Lake County.



1700088


US 41, Replace Superstructure, SB over Brown

INDOT Add New Phases NHPP

Ditch

PE

2019

$

146,540

$

117,232

$

29,308

UT

2021

$

50,000

$

40,000

$

10,000

Cost to Complete:$1.05 million. Unincorporated Lake County.



1700094


US 41, Replace Superstructure, NB over Singleton

INDOT Add New Phases NHPP

Ditch, 3.23mi S of SR 2

PE

2019

$

149,979

$

119,983

$

29,996

UT

2021

$

50,000

$

40,000

$

10,000

Cost to Complete:$1.05 million. Unincorporated Lake County.



1700097


US 41, Replace Superstructure, SB over Singleton

INDOT Add New Phases NHPP

Ditch, 3.23mi S of SR 2

PE

2019

$

149,979

$

119,983

$

29,996

UT

2021

$

50,000

$

40,000

$

10,000

Cost to Complete:$1.05 million. Unincorporated Lake County.



1600693


INDOT


SR 51, Intersection Improvement, Roundabout, Intersection of SR 51/Cleveland Rd at SR 130


Add New Phases


NHPP

PE

2019

$

124,310

$

99,448

$

24,862

RW

2021

$

80,000

$

64,000

$

16,000

UT

2021

$

100,000

$

80,000

$

20,000

Cost to Complete:$1.75 million. City of Hobart, Lake County.



1600701


INDOT


SR 149, Vertical Sight Correction, Intersection o SR 149 at CR 875 N / Robbins Road


f

Add New Phases


NHPP

PE

2019

$

95,627

$

76,502

$

19,125

RW

2021

$

65,000

$

52,000

$

13,000

UT

2021

$

90,000

$

72,000

$

18,000

Cost to Complete:$0.5 million. City of Portage, Porter County.



1700021


INDOT


US 20, Intersect. Improv. W/ Added Turn Lanes, Intersections of US 20 with CR 325W & CR 300W, 1.1mi W of SR 39


Add New Phases


NHPP

PE

2019

$

115,905

$

92,724

$

23,181

RW

2021

$

105,000

$

84,000

$

21,000

UT

2021

$

50,000

$

40,000

$

10,000

Cost to Complete:$0.9 million. Unincorporated LaPorte County.

DES Sponsor Project Description/Location TIP Action Fund

Type


Phase Year Total Cost Federal Non-Federal



1700022


INDOT


US 231, Intersection Improvement, Roundabout, Intersection of US 231 & Cline Ave, 2.0mi E of US 41


Add New Phases


NHPP

PE

2019

$

190,422

$

152,338

$

38,084

RW

2021

$

54,000

$

43,200

$

10,800

UT

2021

$

16,000

$

16,000

$

4,000

Cost to Complete:$2.5 million. Unincorporated Lake County.



1700025


INDOT


US 41, Auxiliary Lanes, Two-way Left Turn Lanes From 3.25mi S of US 231 to US 231


,

Add New Phases


NHPP

PE

2019

$

346,472

$

277,178

$

69,294

RW

2020

$

1,500,000

$

1,200,000

$

300,000

RW

2021

$

1,600,000

$

1,280,000

$

320,000

UT

2021

$

25,000

$

20,000

$

5,000

Cost to Complete:$12.5 million. Length: 3.25 miles. Unincorporated Lake County.



1601089


INDOT


SR 39, Shoulder Rehabilitation And Repair, Fro US 20 to Michigan State Line


m

Add New Phases


STP

PE

2019

$

800,000

$

640,000

$

160,000

RW

2020

$

1,500,000

$

1,200,000

$

300,000

UT

2021

$

10,000

$

8,000

$

2,000

RR

2021

$

80,000

$

64,000

$

16,000

RW

2021

$

1,500,000

$

1,200,000

$

300,000

Cost to Complete:$6.9 million. Length: 5.4 miles. Unincorporated LaPorte County.


image



1701097


Bridge Painting, US 35, @.-N&S RR, WASHINGTON,

INDOT Add New Phases NHPP

2STS, 0.19mi N of SR 2

PE

2018

$

48,000

$

38,400

$

9,600

CN

2019

$

627,387

$

501,910

$

125,477

Edwin Simcox Overpass in downtown LaPorte, LaPorte County.



1701103


Bridge Thin Deck Overlay, I 80, I-80/94 WB at -L NHPP INDOT Add New Phases

CALUMET R, NICTD RR, 00.54mi W of US 41 Interstate

PE

2018

$

74,000

$

66,600

$

7,400

CN

2019

$

953,343

$

858,009

$

95,334

Located on I-80/94 between IN/IL State Line and Calumet Ave Interchange (Hammond, Lake County)



1701102


Bridge Thin Deck Overlay, I 80, I-80/94 EB@.-LT NHPP INDOT Add New Phases

CALUMET RIV, NICTD RR, 00.54mi W of US 41 Interstate

PE

2018

$

72,200

$

64,980

$

7,220

CN

2019

$

954,371

$

858,934

$

95,437

Located on I-80/94 between IN/IL State Line and Calumet Ave Interchange (Hammond, Lake County)

DES Sponsor Project Description/Location TIP Action Fund

Type


Phase Year Total Cost Federal Non-Federal



1701104


Bridge Thin Deck Overlay, I 65, At.-I-80 EB/WB, I-80 NHPP INDOT Add New Phases

CD, 07.00mi N of US 30 Interstate

PE

2018

$

70,500

$

63,450

$

7,050

CN

2019

$

907,064

$

816,358

$

90,706

Located at I-65/I-80/94 interchange in Gary, Lake County



1592735 INDOT

image

Surface Treatment, Thin HMA Overlay, SR 2, From N Jct of US 231 to 0.74 mi N of N Jct of US 231


Add New Phase STP CN 2018 $ 322,000 $ 257,600 $ 64,400


Located within the Town of Hebron, Porter County.



1592910 INDOT

image

Surface Treatment, Thin HMA Overlay, SR 8, From US 231 to 0.54mi E of US 231


Add New Phase STP CN 2018 $ 172,608 $ 138,086 $ 34,522


Located within the Town of Hebron, Porter County.



1701107


Bridge Thin Deck Overlay, I 65, SB RAMP WSDIR@.-I- NHPP INDOT Add New Phases

80, EB-CD, SEC, & SWA, 06.91mi N of US 30 Interstate

PE

2018

$

55,850

$

50,265

$

5,585

CN

2019

$

717,835

$

646,052

$

71,783

Located within the Town of Merrilliville, Lake County.


1592715 INDOT


image

Surface Treatment, Thin HMA Overlay, US 231, From 0.78mi S of N Jct of SR 2 (Hebron Corp Limit) to Tower Crossing


Add New Phase NHPP CN 2018 $ 569,700 $ 455,760 $ 113,940


Located within the Town of Hebron, Porter County.



1701108


Bridge Thin Deck Overlay, I 80, I-80/94 EB@.- NHPP INDOT Add New Phases

HOHMAN AVENUE, 00.71mi W of US 41 Interstate

PE

2018

$

41,600

$

37,440

$

4,160

CN

2019

$

534,777

$

481,299

$

53,478

Located on I-80/94 between IN/IL State Line and Calumet Ave Interchange (Hammond, Lake County)



1701109


Bridge Thin Deck Overlay, I 80, I-80/94 WB at NHPP INDOT Add New Phases

Hohman Avenue, 00.71 mi W of US 41 Interstate

PE

2018

$

41,600

$

37,440

$

4,160

CN

2019

$

534,777

$

481,299

$

53,478

Located on I-80/94 between IN/IL State Line and Calumet Ave Interchange (Hammond, Lake County)



1701110


Bridge Thin Deck Overlay, I 80, CLARK STREET@.-I- NHPP INDOT Add New Phases

80 EB/WB, 02.02 E of SR 912 Interstate

PE

2018

$

42,800

$

38,520

$

4,280

CN

2019

$

551,232

$

496,109

$

55,123

Located about 0.5 miles East of the Burr St interchange in Gary, Lake County



1701112


Bridge Thin Deck Overlay, I 80, HARRISON NHPP INDOT Add New Phases

STREET@.-I-80 EB/WB, 00.48mi W of SR 53 Interstate

PE

2018

$

43,000

$

38,700

$

4,300

CN

2019

$

552,260

$

497,034

$

52,226

Located on I-80/94 between the Grant St and SR 53 interchanges in Gary, Lake County

DES Sponsor Project Description/Location TIP Action Fund

Type


Phase Year Total Cost Federal Non-Federal



1701115


Bridge Thin Deck Overlay, I 94, EB@.-BEAM STREET, NHPP INDOT Add New Phases

1.56 E of US 20 Interstate

PE

2018

$

39,300

$

35,370

$

3,930

CN

2019

$

504,983

$

454,458

$

50,495

Located on I-94 about 1.5 miles East of US 20 interchange in Town of Porter, Porter County



1701116


Bridge Thin Deck Overlay, I 94, WB@.-BEAM NHPP INDOT Add New Phases

STREET, 1.56mi E of US 20 Interstate

PE

2018

$

39,300

$

35,370

$

3,930

CN

2019

$

504,953

$

454,458

$

50,495

Located on I-94 about 1.5 miles East of US 20 interchange in Town of Porter, Porter County



1701118


Bridge Thin Deck Overlay, I 65, NB RAMP@.-I-80 E, I- NHPP INDOT Add New Phases

80 W, I-80 CD , 7.00mi N of US 30 Interstate

PE

2018

$

40,300

$

36,270

$

4,030

CN

2019

$

518,322

$

466,490

$

51,832

Located at I-65/I-80/94 interchange in Gary, Lake County



1701126


Bridge Thin Deck Overlay, I 80, WB RAMP I@.- NHPP INDOT Add New Phases

KENNEDY AVE NB/SB, RAMP F, 0.97mi E of US 41 Interstate

PE

2018

$

43,600

$

39,240

$

4,360

CN

2019

$

560,487

$

504,447

$

56,049

Located on I-80/94 at the Kennedy Ave interchange in Hammond, Lake County



1701127


Bridge Thin Deck Overlay, I 80, WB RAMP TO SR NHPP INDOT Add New Phases

912@.-SR 912 EB/WB, RAMPS, 2.52mi E of US 41 Interstate

PE

2018

$

35,850

$

32,265

$

3,585

CN

2019

$

460,731

$

414,658

$

46,073

Located on I-80/94 at the Cline Ave (SR 912) interchange in Hammond/Gary, Lake County



1701128


Bridge Thin Deck Overlay, I 80, I-80/94 EB@.- NHPP INDOT Add New Phases

NORTHCOTE AVE, 0.29mi W of US 41 Interstate

PE

2018

$

32,250

$

29,025

$

3,225

CN

2019

$

414,452

$

373,007

$

41,445

Located on I-80/94 West of the Indianapolis Blvd interchange in Hammond, Lake County



1701129


Bridge Thin Deck Overlay, I 80, I-80/94 WB@.- NHPP INDOT Add New Phases

NORTHCOTE AVE, 0.29mi W of US 41 Interstate

PE

2018

$

32,800

$

29,520

$

3,280

CN

2019

$

422,680

$

380,412

$

42,268

Located on I-80/94 West of the Indianapolis Blvd interchange in Hammond, Lake County



1701132


Bridge Thin Deck Overlay, I 80, SB RAMP TO I-80/I- NHPP INDOT Add New Phases

94@.-KENNEDY AVENUE NB/SB, 0.97mi E of US 41 Interstate

PE

2018

$

32,000

$

28,800

$

3,200

CN

2019

$

402,111

$

361,900

$

40,211

Located on I-80/94 at the Kennedy Ave interchange in Hammond, Lake County

DES Sponsor Project Description/Location TIP Action Fund

Type


Phase Year Total Cost Federal Non-Federal



1701134


Bridge Thin Deck Overlay, I 65, SB RAMP@.-RAMP I- NHPP INDOT Add New Phases

80/I-94 W TO I-65 S, 6.39mi N of US 30 Interstate

PE

2018

$

34,000

$

30,600

$

3,400

CN

2019

$

433,992

$

390,593

$

43,399

Located at I-65/I-80/94 interchange in Gary, Lake County



17011516

HMA Overlay, Preventive Maintenance, US 6, 0.36

INDOT mi E of SR 51 (Union St) to 2.44 mi W of SR 149 Add New Phases NHPP

(Scottsdale Rd)

PE

2018

$

168,000

$

134,400

$

33,600

CN

2019

$

2,195,679

$

1,756,543

$

439,136

Length: 3.07 miles. Located within the Cities of Hobart (Lake County) and Portage (Porter County).



1701086


Repair Or Replace Joints, US 6, Over deep River,

INDOT Add New Phases NHPP

0.71mi E of SR 51 E/I-80/94

PE

2018

$

5,000

$

4,000

$

1,000

CN

2019

$

64,858

$

51,886

$

12,972

Located in the City of Hobart, Lake County.



1701085


Substructure Repair And Rehabilitation, US 6,

INDOT Add New Phases NHPP

Over Deep River, 0.71mi E of SR 51 E/I-80/94

PE

2018

$

3,300

$

2,640

$

660

CN

2019

$

44,036

$

35,229

$

8,807

Located in the City of Hobart, Lake County.



1701084


Substructure Repair And Rehabilitation, US 6,

INDOT Add New Phases NHPP

Over Deep River, 0.62mi W of SR 51 E Jct

PE

2018

$

4,800

$

3,840

$

960

CN

2019

$

62,594

$

50,075

$

12,519

Located in the City of Hobart, Lake County.



1701514


HMA Overlay, Preventive Maintenance, I 65, 0.56 NHPP INDOT Add New Phases

mi S of SR 10 to 2.10 mi S of SR 2 Interstate

PE

2018

$

406,000

$

365,400

$

40,600

CN

2019

$

5,320,977

$

4,788,879

$

532,098

Length: About 12 miles. Located in Lake (4.9 miles), Newton, & Jasper Counties.



1701101


Bridge Painting, US 12, @.-TRAIL CREEK, CITY ST

INDOT Add New Phases NHPP

&RD, 0.21mi E of US 35

PE

2018

$

123,860

$

99,088

$

24,772

CN

2019

$

1,632,959

$

1,306,367

$

326,592

image

Located in downtown Michigan City (LaPorte County).



0902261

Bridge Deck Replacement, US 12, over Trail CE From INDOT Change Funding FY NHPP 2018 to

Creek, 0.21 miles East of US 35 CN 2019

$

240,000

$

192,000

$

48,000

$

2,945,608

$

2,356,486

$

589,122

Located in downtown Michigan City (LaPorte County).

DES Sponsor Project Description/Location TIP Action Fund

Type


Phase Year Total Cost Federal Non-Federal



1701054


INDOT


Repair Or Replace Joints, US 20, Over Kennedy

Add New Phases

Ave, IHB RR


NHPP

PE

2018

$

9,520

$

7,616

$

1,904

RR/CN

2019

$

10,710

$

8,568

$

2,145

CN

2019

$

124,514

$

99,611

$

24,903

Located within the City of Hammond (Lake County) about 1.59 miles West of SR 912.



1701057


INDOT


Repair Or Replace Joints, SR 912, Over CSX RR, Amoco Service Rd, 0.45mi W of US 12/20


Add New Phases


NHPP

PE

2018

$

6,000

$

4,800

$

1,200

RR/CN

2019

$

6,700

$

5,360

$

1,340

CN

2019

$

78,036

$

62,429

$

15,607

Located 0.25 miles North of (Relinquished) SR 312 on Gary/Hammond Corp Limit (Lake County).



1701078


Repair Or Replace Joints, SR 912, Over

INDOT Add New Phases NHPP

Abandoned Roadways, 0.36mi E of US 20

PE

2018

$

8,200

$

6,560

$

1,640

CN

2019

$

107,643

$

86,114

$

21,529

Abandoned Roadway is (Relinquished) SR 312 on Gary/Hammond Corp Limit (Lake County).



1701079


INDOT


Substructure Repair And Rehabilitation, SR 912, Michigan Ave over SR 912 EB/WB Ramps, RR, 1.34mi W of US 12


Add New Phases


NHPP

PE

2018

$

4,000

$

3,200

$

800

RR/CN

2019

$

4,500

$

3,600

$

900

CN

2019

$

53,472

$

42,778

$

10,694

This bridge is part of the SR 912 interchange at Arcelor Mittal Steel and the East Chicago Casino & Marina (Lake County).



1701081


Bridge Painting, SR 2, Over John Bruce Ditch,

INDOT Add New Phases STP

0.74mi E of US 41

PE

2018

$

4,300

$

3,440

$

860

CN

2019

$

56,649

$

45,319

$

11,330

Located West of the Town of Lowell (Lake County).



1701087


Repair Or Replace Joints, US 41, CALUMET AVE@.-I-

INDOT Add New Phases NHPP

80/94 E/W, CD/RAMPS, 3.78mi S of SR 312

PE

2018

$

6,700

$

5,360

$

1,340

CN

2019

$

88,708

$

70,966

$

17,742

Located at the Calumet Ave interchange on I-80/94 in Hammond (Lake County).



1701088


Repair Or Replace Joints, US 41, SBL Ramp J over I-

INDOT Add New Phases NHPP

80/94, CD Ramps

PE

2018

$

5,500

$

4,400

$

1,100

CN

2019

$

72,180

$

57,744

$

14,436

Located at the Calumet Ave interchange on I-80/94 in Hammond (Lake County).



1701100

Bridge Painting, SR 149, @.-I-94 EB/WB, 0.39mi N of

INDOT Add New Phases NHPP

US 20

PE

2018

$

53,000

$

42,400

$

10,600

CN

2019

$

696,187

$

556,950

$

139,237

Located in the Town of Burns Harbor (Porter County).

DES Sponsor Project Description/Location TIP Action Fund

Type


Phase Year Total Cost Federal Non-Federal



1701113

Bridge Thin Deck Overlay, US 20, At Grand

INDOT Add New Phases NHPP

Calumet River, 01.03 mi E of SR 312

PE

2018

$

31,300

$

25,040

$

6,260

CN

2019

$

407,845

$

326,276

$

81,569



1701114

Bridge Thin Deck Overlay, SR 312, @.-INDIANA

INDOT Add New Phases NHPP

HARBOR CANAL, 00.50mi E of US 20

PE

2018

$

27,450

$

21,960

$

5,490

CN

2019

$

357,777

$

286,222

$

71,555

Located in the City of East Chicago (Lake County).



1701125

Bridge Thin Deck Overlay, SR 49, At US 20, 1.02 mi

INDOT Add New Phases STP

N of I-94

PE

2018

$

23,700

$

18,960

$

4,740

CN

2019

$

309,795

$

247,836

$

61,959

Located in the Town of Porter (Porter County).



1701059


Repair Or Replace Joints, SR 4, Over Place Ditch,

INDOT Add New Phases STP

4.22mi W of SR 23

PE

2018

$

3,000

$

2,400

$

600

CN

2019

$

38,766

$

31,013

$

7,753

Located in unincorporated LaPorte County about 0.75 miles West of the St Joseph County line.



1701060


Repair Or Replace Joints, US 6, Over Kankakee

INDOT Add New Phases NHPP

River, 1.85mi E of US 35

PE

2018

$

6,080

$

4,864

$

1,216

CN

2019

$

79,200

$

63,360

$

15,840

Located in unincorporated LaPorte County about 4.0 miles East of Kingsford Heights.



1701121


Bridge Thin Deck Overlay, US 35, NB@.-GT&W RR,

INDOT Add New Phases NHPP

RAILROAD STR., 0.42mi N of US 6

PE

2018

$

26,300

$

21,040

$

5,260

CN

2019

$

343,440

$

274,752

$

68,688

Located in the Town of Kingsbury (LaPorte County).



1701122


Bridge Thin Deck Overlay, US 35, SB@.-GT&W RR,

INDOT Add New Phases NHPP

RAILROAD STR., 0.42mi N of US 6

PE

2018

$

26,300

$

21,040

$

5,260

CN

2019

$

344,487

$

275,590

$

68,897

Located in the Town of Kingsbury (LaPorte County).



1701530


HMA Overlay, Preventive Maintenance, US 231, I-

INDOT Add New Phases NHPP

65 to N JCT of SR 55

PE

2018

$

60,000

$

48,000

$

12,000

CN

2019

$

816,352

$

653,082

$

163,270

Length: About 2.75 miles. Located in the City of Crown Point (Lake County).



1701532


HMA Overlay, Preventive Maintenance, SR 212,

INDOT Add New Phases NHPP

From US 20 to US 12

PE

2018

$

133,600

$

106,880

$

26,720

CN

2021

$

1,833,085

$

1,466,468

$

366,617

Length: about 3.25 miles. Located in/near Michigan City (LaPorte County).

DES Sponsor Project Description/Location TIP Action Fund

Type


Phase Year Total Cost Federal Non-Federal



1500679


HMA Overlay, Preventive Maintenance, US 30,

INDOT Add New Phases NHPP

From SR 39 to US 35

PE

2018

$

215,200

$

172,160

$

43,040

CN

2021

$

2,690,000

$

2,152,000

$

538,000

Length: About 6.1 miles. Located in unincorporated LaPorte County.



1701535


HMA Overlay, Preventive Maintenance, SR 4,

INDOT Add New Phases STP

From 2.02mi E of SR 2 (Boyd Blvd) to SR 104

PE

2018

$

89,200

$

71,360

$

17,840

CN

2021

$

1,223,886

$

979,109

$

244,777

Length: About 4.75 miles. Located in unincorporated LaPorte County.



1701534


HMA Overlay, Preventive Maintenance, SR 149,

INDOT Add New Phases NHPP

From SR 130 to US 12

PE

2018

$

48,000

$

38,400

$

9,600

CN

2021

$

656,583

$

525,266

$

131,317

Length: About 8.8 miles. Located in City of Portage & Town of Burns Harbor (Porter County).


image



1600350


INDOT


Small Structure Pipe Lining, US 30, 2.09mi E of SR 2

Add New Phases

& SR 49 Exchange


NHPP

PE

CN CE

2018

$

30,000

$

24,000

$

6,000

2020

$

221,610

$

177,288

$

44,322

2020

$

40,000

$

32,000

$

8,000

Located in unincorporated Porter County.



1600917


INDOT


Bridge Deck Overlay, SR 49, SR 49 NB @ Comford

Add New Phases

Rd, CFE RR, 0.21 mi S of US 30


STP

PE

2018

$

172,500

$

138,000

$

34,500

CN

2020

$

1,623,884

$

1,299,107

$

324,777

RR/UT CN

2019

$

65,000

$

52,000

$

13,000

Located in unincorporated Porter County.



1600918


INDOT


Bridge Deck Overlay, SR 49, SR 49 SB @ Comford

Add New Phases

Rd, CFE RR, 0.21 mi S of US 30


STP

PE

2018

$

160,000

$

128,000

$

32,000

CN

2020

$

1,503,868

$

1,203,094

$

300,774

RR/UT CN

2019

$

65,000

$

52,000

$

13,000

Located in unincorporated Porter County.



1600919


INDOT


Bridge Deck Overlay, SR 49, SR 49 NB @ GT

0.45 mi N of SR 2


W RR,

Add New Phases


STP

PE

2018

$

113,493

$

90,794

$

22,699

CN

2020

$

1,067,812

$

854,250

$

213,562

RR/UT CN

2019

$

65,000

$

52,000

$

13,000

Located in the City of Valparaiso (Porter County).

DES Sponsor Project Description/Location TIP Action Fund

Type


Phase Year Total Cost Federal Non-Federal



1600920


INDOT


Bridge Deck Overlay, SR 49, SR 49 SB @ GT

0.45 mi N of SR 2


W RR,

Add New Phases


STP

PE

2018

$

113,493

$

90,794

$

22,699

CN

2020

$

1,067,812

$

854,250

$

213,562

RR/UT CN

2019

$

65,000

$

52,000

$

13,000

Located in the City of Valparaiso (Porter County).



1701141


Bridge Deck Overlay, SR 49, NB@.-US 30/SR 2 EB,

INDOT Add New Phases STP

US 30 WB, 1.16mi S of SR 2

PE

2018

$

68,000

$

54,400

$

13,600

CN

2020

$

910,426

$

728,341

$

182,085

Located at the SR 49/US 30 interchange in the City of Valparaiso (Porter County).



1701142


Bridge Deck Overlay, SR 49, SB@.-US 30/SR 2 EB,

INDOT Add New Phases STP

US 30 WB, 1.13mi S of SR 2

PE

2018

$

68,000

$

54,400

$

13,600

CN

2020

$

910,426

$

728,341

$

182,085

Located at the SR 49/US 30 interchange in the City of Valparaiso (Porter County).



1701520


HMA Overlay, Preventive Maintenance, SR 55, US

INDOT Add New Phases NHPP

30 to 5.35mi N of US 30 (Ridge Rd)

PE

2018

$

92,900

$

74,320

$

18,580

CN

2020

$

1,247,862

$

998,290

$

249,572

Length: 5.35 miles. Located in the Town of Merrillville (Lake County).



1701521


HMA Overlay, Preventive Maintenance, SR 520,

INDOT Add New Phases STP

US 20 to US 12

PE

2018

$

8,000

$

64,000

$

1,600

CN

2020

$

107,482

$

85,989

$

21,496

Length: About 0.25 miles. Located in the Town of Pines (Porter County) about 1.5 miles West of the LaPorte County Line.



1701522


HMA Overlay, Preventive Maintenance, SR 39,

INDOT Add New Phases STP

From US 35 (N JCT) to US 20

PE

2018

$

252,000

$

201,600

$

50,400

CN

2020

$

3,385,673

$

2,708,538

$

677,135

Length: About 3.7 miles. Located in unincorporated LaPorte County and the City of LaPorte.



1701525


HMA Overlay, Preventive Maintenance, US 6,

INDOT Add New Phases NHPP

From SR 39 to US 35 (E JCT)

PE

2018

$

287,000

$

229,600

$

57,400

CN

2020

$

3,853,218

$

3,082,574

$

770,644

Length: About 2.25 miles. Located in unincorporated LaPorte County.



1701527


HMA Overlay, Preventive Maintenance, US 35,

INDOT Add New Phases NHPP

From US 6 (W JCT) to Boyd Blvd

PE

2018

$

218,500

$

174,800

$

43,700

CN

2020

$

2,934,250

$

2,347,400

$

586,850

Length: About 4.7 miles. Located in unincorporated LaPorte County.

DES Sponsor Project Description/Location TIP Action Fund

Type


Phase Year Total Cost Federal Non-Federal



1701523


HMA Overlay, Preventive Maintenance, SR 2, US

INDOT Add New Phases STP

41 to 0.08mi W of I-65 (Mississippi St)

PE

2018

$

122,900

$

98,320

$

24,580

CN

2020

$

1,640,719

$

1,312,575

$

328,144

Length: About 8.1 miles. Located in Town of Lowell & unincorporated Lake County.



1600373


INDOT


HMA Overlay, Preventive Maintenance, US From SR 10 to SR 2 (N Jct)


41,

Add New Phases


NHPP

PE

2018

$

453,000

$

362,400

$

90,600

CN

2020

$

5,664,686

$

4,531,749

$

1,132,937

CE

2020

$

450,000

$

360,000

$

90,000

Length: About 10.1 miles. Located in unincorporated Lake & Newton Counties.



1701519


HMA Overlay, Preventive Maintenance, SR 130,

INDOT Add New Phases NHPP

From SR 51 to SR 149

PE

2018

$

157,600

$

126,080

$

31,520

CN

2020

$

2,097,740

$

1,678,192

$

419,548

Length: 7.9 miles. Located in Hobart (Lake County) and unincorpoprated Porter County.



1701152


Arch Reconstruction Or Repair, US 6, @.-

INDOT Add New Phases NHPP

KINGSBURY CREEK, 0.38mi E of US 35

PE

2018

$

5,200

$

4,160

$

1,040

CN

2020

$

63,369

$

50,695

$

12,674

Located in unincorporated LaPorte County.



1701149


Arch Reconstruction Or Repair, SR 130, @.-SALT

INDOT Add New Phases NHPP

CREEK, 1.00mi W of SR 149

PE

2018

$

5,300

$

4,240

$

1,060

CN

2020

$

70,436

$

56,349

$

14,087

Located in unincorpoprated Porter County.



1700074


INDOT


Replace Superstructure, SR 8, Over Cornell

4.8 mi E of US 231


Ditch,

Add New Phases


STP

PE

2018

$

116,584

$

93,267

$

23,317

CN

2020

$

476,275

$

381,020

$

95,255

RW

2019

$

100,000

$

80,000

$

20,000

UT CN

2019

$

50,000

$

40,000

$

10,000

Located within the Town of Hebron, Porter County.



1298404


INDOT Bridge Deck Replacement, US 20, Bridge over I-90 Add New Phases NHPP

PE

2018

$

135,000

$

108,000

$

27,000

CN

2020

$

1,753,303

$

1,402,642

$

350,661

Located 3.6 miles East of SR 39 in unincorporated LaPorte County.

DES Sponsor Project Description/Location TIP Action Fund

Type


Phase Year Total Cost Federal Non-Federal



1296500


INDOT


Small Structure Maint and Repair, SR 8, 2.5

W of SR 39


4 miles

Add New Phases


STP

PE

2018

$

49,639

$

39,711

$

9,928

CN

2020

$

100,663

$

80,530

$

20,133

RW

2019

$

40,000

$

32,000

$

8,000

Located in unincorporated LaPorte County East of the Town of LaCrosse.



1296499


INDOT


Small Structure Maint and Repair, SR 8, 2.7

W of SR 39


9 miles

Add New Phases


STP

PE

2018

$

26,762

$

21,410

$

5,352

CN

2020

$

106,256

$

85,005

$

21,251

RW

2019

$

27,000

$

21,600

$

5,400

Located in unincorporated LaPorte County East of the Town of LaCrosse.



1701167


Bridge Deck Overlay, I 80, Ramp 21, SR 152 NHPP INDOT Add New Phases

Indianapolis Blvd , 0.04mi W of US 41/SR 152 Interstate

PE

2018

$

92,000

$

82,800

$

9,200

CN

2020

$

1,240,814

$

1,116,733

$

124,081

Located on I-80/94 at the Indianapolis Blvd interchange in Hammond, Lake County



1701163


Bridge Deck Overlay, I 94, CR 900W over I-94 NHPP INDOT Add New Phases

EB/WB, 3.45mi E of US 20 Interstate

PE

2018

$

105,000

$

94,500

$

10,500

CN

2020

$

1,406,687

$

1,266,018

$

140,669

Located in unincorporated LaPorte County.



1701162


Bridge Deck Overlay, I 94, CR 600W over I-94 NHPP INDOT Add New Phases

EB/WB, 0.72mi W of US 20 Interstate

PE

2018

$

105,000

$

94,500

$

10,500

CN

2020

$

1,414,227

$

1,272,804

$

141,423

Located in unincorporated LaPorte County.



1701161


Bridge Deck Overlay, I 94, WB Over Norris Ditch NHPP INDOT Add New Phases

No 1, 1.19mi E of US 421 Interstate

PE

2018

$

95,000

$

85,500

$

9,500

CN

2020

$

1,273,127

$

1,145,814

$

127,313

Located in unincorporated LaPorte County.



1701159


Bridge Deck Overlay, I 94, EB Over Norris Ditch No NHPP INDOT Add New Phases

1, 1.19mi E of US 421 Interstate

PE

2018

$

95,000

$

85,500

$

9,500

CN

2020

$

1,273,127

$

1,145,814

$

127,313

Located in unincorporated LaPorte County.



1701143


Bridge Deck Overlay, I 80, GRANT STREET@.-I- NHPP INDOT Add New Phases

80/94 EB/WB, 2 CD, 1.00mi W of SR 53 Interstate

PE

2018

$

138,000

$

124,200

$

13,800

CN

2020

$

1,859,067

$

1,673,160

$

185,907

Located on I-80/94 at the Grant St interchange in Gary (Lake County).

DES Sponsor Project Description/Location TIP Action Fund

Type


Phase Year Total Cost Federal Non-Federal



1701139


NHPP

INDOT Small Structure Pipe Lining, I 94, 3.81mi E of US 421 Add New Phases

Interstate

PE

2018

$

15,000

$

13,500

$

1,500

CN

2020

$

202,077

$

181,869

$

20,208

Located in unincorporated LaPorte County.



1701158


Bridge Deck Overlay, I 65, SB Over 39th Ave, NHPP INDOT Add New Phases

5.33mi N of US 30 Interstate

PE

2018

$

102,000

$

91,800

$

10,200

CN

2020

$

1,371,952

$

1,234,757

$

137,195

Located on I-65 about 0.25 miles South of the Ridge Rd interchange in Gary (Lake County).



1701157


Bridge Deck Overlay, I 65, NB Over 39th Ave, NHPP INDOT Add New Phases

5.33mi N of US 30 Interstate

PE

2018

$

103,500

$

93,150

$

10,350

CN

2020

$

1,393,489

$

1,254,140

$

139,349

Located on I-65 about 0.25 miles South of the Ridge Rd interchange in Gary (Lake County).



1701156


Bridge Deck Overlay, I 65, SB Over 49th Ave, NHPP INDOT Add New Phases

4.06mi N of US 30 Interstate

PE

2018

$

94,000

$

84,600

$

9,400

CN

2020

$

1,258,879

$

1,132,991

$

125,888

Located on I-65 about 1.55 miles North of the 61st Ave interchange in Gary (Lake County).



1701155


Bridge Deck Overlay, I 65, NB Over 49th Ave, NHPP INDOT Add New Phases

4.06mi N of US 30 Interstate

PE

2018

$

94,000

$

84,600

$

9,400

CN

2020

$

1,268,571

$

1,141,714

$

126,857

Located on I-65 about 1.55 miles North of the 61st Ave interchange in Gary (Lake County).



1701166


INDOT Bridge Deck Overlay, US 6, Over I-80/94 EB/WB Add New Phases NHPP

PE

2018

$

117,000

$

93,600

$

23,400

CN

2020

$

1,582,789

$

1,266,231

$

316,558

Located at Ripley St (Lake Station).



1701165


INDOT


Bridge Deck Overlay, US 12, US 12/SR 912@.- RR, 0.09mi W of SR 312


N&S

Add New Phases


NHPP

PE

2018

$

72,000

$

57,600

$

14,400

CN

2020

$

965,824

$

772,659

$

193,165

RR CN

2019

$

30,000

$

24,000

$

6,000

Located in East Chicago (Lake County).



1701140


Bridge Deck Overlay, US 12, Over Grand Calumet

INDOT Add New Phases NHPP

River, 2 Rds, 0.19mi W or I-90

PE

2018

$

124,000

$

99,200

$

24,800

CN

2020

$

1,661,390

$

1,329,112

$

332,278

Located in East Chicago (Lake County).

DES Sponsor Project Description/Location TIP Action Fund

Type


Phase Year Total Cost Federal Non-Federal



1006767


Small Structure Maint and Repair, US 41, 2.94 mi N

INDOT Add New Phases NHPP

of N jct SR 2

PE

2018

$

18,500

$

14,800

$

3,700

CN

2020

$

62,353

$

49,882

$

12,471

Located in unincorporated Lake County.


image



1600463 INDOT

image

Statewide Pavement Project (On-Call Pavement Design)


Add New Phase

State STBG


PE 2018 $ 1,401,395 $ 1,261,255 $ 140,140


Statewide (NIRPC Portion)



1600479 INDOT

image

Statewide Pavement Project (On-Call Geo-Tech Investigation)


Add New Phase

State STBG


PE 2018 $ 2,327,909 $ 2,095,118 $ 232,791


Statewide (NIRPC Portion)



1701469 INDOT

image

Statewide Pavement Project (On-Call Pavement Design)


Add New Phase

State STBG


PE 2018 $ 1,600,000 $ 1,440,000 $ 160,000


Statewide (NIRPC Portion)


image



1172288


US 35 Bridge Deck Replacement (Edwin Simcox

State

INDOT Overpass) over Washinton St & RR in downtown Add New Phase

STBG

LaPorte.


RR PE


2018


$


40,000


$


32,000


$


8,000


CN


2018


$


9,079,000


$


7,263,200


$


1,815,800

Located 0.19 miles North of SR 2.