Transportation Resource Oversight Committee Meeting

Tuesday, October 3, 2017 9:00am CST at NIRPC


Tentative Agenda


  1. Welcome & Introductions.


  2. Quarterly Tracking Meeting Schedule (Handout)


  3. 2018-2023 Spending Plan (Handout)


    2018: $212 K Under (OK)

    2019: $1 .7 M Under

    2020: $2. l MUnder

    2021 : $3.4 MOver

    2022: $700 K Over

    2023: $5.7 MUnder


  4. LPA Requests for Programming Changes

    See Attached Draf t TIP Amendment #4


  5. Change Orders

    1 173706 - M errillville C&O Trail ($25,835.13) 0710064 - Gary 15th Ave Project Substitution


  6. Next Meeting/Adjournment

Fall 2017 Quarterly Tracking Meetings November 2017


LPA # 2-Nov 6-Nov 8-Nov 13-Nov Cedar Lake 1 9:00

Griffith 2 9:15

Highland 2 9:30

East Chicago 1 10:00

Kouts 2 10:30

Wlnfleld 3 10:45

Bums Harbor 1 11:00

Crown Point s 9:00

Lake County 4 9:30

Munster 3 10:00

Valparaiso 4 10:30

Schererville 5 11:00

Portage 6 9:00

Hammond 7 9:30

Hobart 5 10:00

Merrillville 2 10:30

Porter Co 4 10:45

Gary 5 11:00

I

Mich City* 3 9:00

LaCrosse• 1 9:45

LaPorte Co* 5 10:00

LaPorte (City)* 9 10:30

•at lNDOT

Conta ct Stephen Sosta ric to resched ul e.

Northwestern Indiana Regional Planning Commission

MPO Funds Only - 2018-2023 LPA Highway Projects: Lake & Porter Counties September 29, 2017

Includes Amendment #02 Changes (Adapted 09/21/2017) & Proposed Amendment #04 Changes

Proposed Changes


Row ID Des # Sponsor Route Work Type LocaHon Federal Year Phase In TIP or SPMS TIP 2018 Actual TIP 2019 TIP 2020 TIP 2021 2022 2023

Fund Type Only Oblgaled 21118



1 1601147


Marquette Bums Marquette Bike/Pedestrian Greenway Trail, Harbor Trell Facilities SR149 to

Babcock Rd


CMAQ

Chicago 2019 RW $ 12,000 $ 12.000

UZA


2 1601147


Marquette Bums Marquette Bike/Pedestrian Greenway Trail. Harbor Trell Facifilies SR149 to

Babcock Rd


CMAQ

Chicago 2021 CN $ 997.934 $ 997.934

UZA

lake Shore

lnte!'lect. STBG I

  1. 1382594 Cedar lake Drive Improvements at Cline Ave Chicago 2018 RW $ 74,580 $ 74.580

    (Roundabout) UZA

  2. 1382594 Cedar ake

    Lake Shore Drive


    -

    lnlerrect. STBGI

    Improvements a1 CDne Ave Chiecga 2019 CN $ 1.500,000 $ 1.500.000 $

    (Roundabout) UZA


    from 2022 lo 2019


    Roadside


    lOlst Ave @ SR


    STBG I

  3. 1173427 Crown Point 101sl Ave Improvements 53 Chicago 2021 RW $ 200,000 $ 200.000

    (Drainage) UZA


    Roadside


    10\sl Ave@ SR


    STBG I

  4. 1173427 Crown Point 101sl Ave Improvements 53 Chieogo 2022 CN $ 1.096.415 $ 1.096.415

    (Drainage) UZA



    Intersect. lmprov

  5. 1401030 Crown Point !25th Ave W/ Added Tum


    From SR 55 lo

    Court SI

    HSIP

    Chicago 2018 PE $ 22.500 $ 22.500

    Lanes UZA

    ln1eect. lmprov

  6. 1401030 Crown Point 1251h Ave W/ Added Tum

    From SR 55 to

    Court St

    HSIP

    Chicago 2019 CN $ 1.403.046 $ 1.403.046

    Lanes UZA

    01her

    Courthouse

    HSIP

  7. 1500323 Crown Point us 231 Intersection Square. construc1 Chicago 2018 RW $ 24,750 $ 24.750

pedestrian bump'

Improvement

outs

UZA

Other

Courthouse

HSIP

$ $

10 1500323 Crown Point us 231 lnterseclion Square. construct Chicago 2019 CN 436380 436.380

pedestrian bump

Improvement

oul5

109th Ave Access Control.

UZA

HSIP

$

11 1601157 Crown Point 1091hAve Access Control Delaware Pkwy Chicago 2019 RW 112.500 $ 112.500

to SR 53. includes

median construction


109th Ave

Access Control.

UZA


HSIP

$ $

  1. 1601157 Crown Poinl 1091hAve Access Control Delaware Pkwy Chicago 2021 CN 1,098000 1.098.000

    to SR 53. includes

    median

    construclion

    UZA



    Row ID Oes t Sponsor Route Work Type Locatton


    federal


    Year Phase


    In TIP or SPMS


    TIP 2018

    Actual


    TIP 2019 TIP 2020 TIP 2021 2022 2023

    fund Type Only Oblgaled 2011


    lnter.;ect. HSIP

  2. 1601158 Crown Poin1 109th Ave Improvements at Iowa St Chicago 2018 PE $ 265.740 $ 265.740

    (Roundabout) UZA

    lntersecL HSIP

  3. 1601158 Crown Point 1091h Ave Improvements at Iowa SI Chicago 2019 RW $ 112.500 $ 112.500

    (Roundabout) UZA


    Intersect. HSIP

  4. 1601158 Crown Poin1 1091h Ave lmprovemenls at Iowa SI Chicago 2022 CN $ U38.500 $ 1.138 500 (Roundabout) UZA


16 1601146


from Toll Road

East Marquette Bike/Pedestrian overpass at Chicago Trail Facililies Kosciusko St 1o US

20/SR 152)


CMAQ

Chtcago 2018 PE $ 247.840 $ 247.840

UZA

17 1601146


from Toll Road East Marquette Bike/Pedestrian overpass at

Chicago Trail Facilities Kosciusko St lo US

20/SR 152)


Chicago

UZA

2021

RW

$ 24,000

CMAQ


$ 24.000


18 1601146


East Marquette Bike/Pedestrian Chicago Trail Facilities


overpass al CMAQ

Chicago

Kosciusko St to US

2022

CN

$ 828.000

UZA

20/SR 152)


Multiple locations

at/near

STBG I

inter.;ecfion of 15th Ave and

Chicago

UZA

2020

RW

$ 160.000

MLK Dr.


Multiple location

at/near inlersection of

STBGI

Chicago


2022


CN


$ 716 800

lSlh Ave and

UZA

MLK Dr.

rromToll Road


$ 828.000



  1. 0710064 Gory 15th Ave

    Signals. New or

    Upgraded


    $ 160.000



  2. 0710064 Gory 15th Ave

    Signals. New or Upgraded


    $ 716.800



  3. 1172078 Gory Ridge Rd


    Road Reconstruction (3R/4R

    Standards)

    Ridge Road

    Reconstruction. STBG I

    Connecticut St to Chicago 2020 CN $ 5,060.000 $ 5.060.000

    MississippiS1, UZA

    Phase 2


    Regulalay & HSIP

  4. 1601165 Gory Warning Sign City-wide Chicago 2018 PE $ 61.943 $ 61,943

    Replacement UZA


    Regulatay & HSIP

  5. 1601165 Gory Warning Sign City-wide Chicago 2020 CN $ 450000 $ 450.000

Replacement UZA


Gory /

INDOT


SR 53


Lighting & Signal Improvements


SR 53 Crosswalk HSIP

24

1592716

Chicago

2018

PE

$ 33.400 $

33.400

Improvements

UZA

& lighting


Gary Green


STBG I

25 1702158 Gory Marquette Bike/Pedestrian links/Marquette Chicogo 2019 RW $ 20.000 $ 20.000

Troll Facilities Trail.Roosevelt St

to Pol< St UZA



Row ID Des t Sponsor Route Work Type location


Federal


Year Phase


In TIPor SPMS


TIP 2018

Actual


TIP 2019 TIP 2020 TIP 2021 2022 2023

Fund Type Only Oblgaled 2018



26 1702158 Gory

Gary Green Marquette Bike/Pedestrian Links/Marquette

Trail Facililies Trail. Roosevelt St


STBGI

Chicago 2021 CN $ 1.000.000 $ 1.000.000

to PolkSI, UZA


Airport Road

Road Rehab 3R/4R STBGI

  1. 1600418 Gory Airport Rd (3R/4R Reconstruction: Chicago 2019 CN $ 3 500.000 $ 3.500.000

    Slandords) Cline Ave to UZA

    EJ&E RR Bridge


    CMAQ Oemo

  2. 1600632 Gory PTC FTA Transfe Operating


    Broadway Express Year #2


    CMAQ

    Chicago 2018 Flex $ 984.305 $ 984.305

    Assistance UZA

    CMAQ Demo

    CMAQ

  3. 1600632 Gory PTC FTA Transfers Operating Broadway Chicago 2019 Flex $ 894.822 $ 894.822 $ .

Express Yem 13

from 2019 lo 2018

Assistance

UZA


Sign HSIP

30 1500320 Griffith Replacement - City-wide Chicago 2018 CN $ 272.588 $ 272.588 $ 328.318

Multiple Types UZA


STBG I

Chicago


2018


CN


$ 41.701


$ 41 701


$ 51.501

UZA

HSIP

Chicago


2018


CN


$ 93.150


$ 93.150


$ 127.518

UZA

Sign

  1. 1500320 Grirfilh Replacement - City-wide Mulliple Types


    Flashing Beacon al E-L Trail

  2. 1500321 Griffith Main St

    lmto11ation Crossing


    lnllale


    TAP

    $

  3. 1382659 Hammond Marquette Bike/Pedestrian Connector !Lake Chicago 2018 PE 20.000 $ 20.000

    Troll Facilities Michigan to IN/IL

    S1ate line UZA


    ln1elote


    TAP

  4. 1382659 Hammond Marquette Bike/Pedestrian Connector !Lake Chicago 2018 CN $ 208.000 $ 208.000

    Trail Focililies Michigan to IN/IL

    Stote Line

    UZA


    .

    STBGI

  5. 1500221 Hammond Chicago Added Travel lrom IN/IL State Chicago 2021 CN $ 9.400.000 $ 9.400.000 $


    from 2021 to 2020

    Ave

    Lones

    Line to Marble St

    UZA


    2022


    CN


    $ 6.690.200

    $ .


    $ 6.690.200


    om 2022 to 2023


    2019


    CN


    $ 2.494,000


    $ 2.494.000

    Chicago Added Travel om IN/IL State STBG I

  6. 1500222 Hammond Ave Lones Line to Mable St Chicago

    (Phose 2J UZA


    Bike/Pedestrian over US 41 near TAP

  7. 1500416 Hammond us 41

    Bridge Conkey St

    Chicago

    UZA


  8. 1601145 Hammond


    Morquefte Bike/Pedestrian Trail Facilities


    from Stale St at

    Rabin Plaza to CMAQ

    Toll Rood Chicago 2021 CN $ 1.200.000 $ 1.200.000

    overpass al UZA

    Kosciusko St



  9. 1601163 Hammond 173rd Ave


    Pedestrian Island Consfruc1ion

    at Main Entrance STBG I

    to Purdue NW Chicago 2019 RW $ 40000 $ 40.000

    Campus UZA



  10. 1601163 Hammond 173rd Ave


    Pedestrian Island Construction

    at Main Entrance STBGI

    to Purdue NW Chicago 2021 CN $ 680.000 $ 680000

    Campus UZA



    Row ID Des t Sponsor Rovte Work Type locaffon


    Federal


    Year Phase


    In TIP or SPMS


    TIP 2018

    Actual


    TIP 2019 TIP 2020 TIP 2021 2022 2023

    Fund Type Only Oblgaled 2018



  11. 1601164 Hammond


Pedestrian Flashing Beacons. Installed


HSIP

at 3 trail crossings Chicago 2018 CN $ 100.001 $ 100.001

UZA

  1. 0710068 Highland 4Sth Ave

    Intersection Improvements

    STBG I

    at 5th Ave Chicago 2018 CN $ 772.800 $ 772,800 UZA

  2. 1500322 Highland 4Slh Ave

    Pedestrian HAWK at E-L Trail HSIP

    System.lnslalled Crossing Chicago 2018 CN $ 111.093 $ 111 093

    UZA

    Signogeon

  3. 1592274 Highland multiple trails.

Mulliple Trails: Multiple LPA's

TAP

Chicago 2020 CN $ eoo.ooo $ eoo.ooo $ $

from 2020 to 2019

instaned UZA

45 1382598 Hobert


Rood

County Line Reconstruction from US 6 to Rd (3R/4R Cleveland Ave

Standards)


STBGI

Chicago 2020 RW $ 200.000 $ 200.000

UZA


46 1382598 Hobart


Road

County Line Reconstruction from US 6 lo Rd (3R/4R Cleveland Ave

Standards)


STBG I

Chicago 2021 CN $ 6.877.000 $ 6 877.000

UZA


47 1401034 Hobart Colorado SI


Line of Sight Corrections: Access Management


HSIP

North of US 30 Chicago 2021 CN $ 734 850 $ 734.850

UZA


Bicycle &. in vicinity of TAP

48 1500417 Hobart Pedestrian Hobart Middle Chicago 2019 CN $ 247.200 $ 247.200

Facilities School UZA

49 1592275 Hobart

Environmenial Mitigation

Deep River TAP

Stormwoler Chicago 2018 PE $ 36.000 $ 36 000 Ouffall and BMP UZA

50 1592275 Hobart

Environmental Miligation

Deep River TAP

Stormwater Chicago 2020 CN $ 246.480 $ 246 480 Outfall and BMP UZA

51 1601897 Hobart

Rood Safety Road Safety

Audifs Audits

HSIP

2018

PE

$ 60.000

$ 60.000


2018


PE


$ 18.000


$ 18000


$ 16.169


2019


CN


$ 40.500


$ 40.500


2018


PE

$ 12.569

$ 12.569


$ 12569


2019


CN


$ 11.700


$ 11.700

Chicago UZA

Regulatay & HSIP

52 1601161 Kouls Warning Sign Town-wide Chicago Replacement UZA

Regulatory & HSIP

S3 1601161 Kouts Warning Sign Town-wide Chicago Replacement UZA


54 1601162 Kouts


Pavement Markings


HSIP

Town-wide Chicago UZA


.SS 1601162 Kouts

Pavement HSIP

Town-wide Chicago

Markings

UZA



56 0088990


Lake County


Bridge Rehabilitation Or Repair

Lake County Bridge #36 (State line Rood over Kankakee River)


STBG I

Chicago 2018 CN $ 819.000 $ 819.000

UZA



Row ID


Des # Sponsor Route Work Type Location


Federal


Year Phase


In TIP or SPMS


TIP 2018

Actual


TIP 2019 TIP 2020 TIP 2021 20:U 2023

Fund Type Only Obllgaled 20111



57 1172007


Lake Added Travel

45th Ave


45th Ave from STBG I

Whitcomb to Chicago 2019 CN $ 1.752.000 $ 1.752.000

County

Lanes

Chase f Ph 2B) UZA


58 1172007


Lake Added Travel

451h Ave


45th Ave.from STBG I

Whitcomb to Chicago 2018 RW LID $ 500.000 $ 500.000 $ 395.000

County

Lanes

Chase f Ph 2B) UZA



59 9707970


Lake County

lnleect. lmprov. STBGI

45th Ave WI Added Tum al Colfax SI. Chicago 2018 CN $ 422.304 $ 422304 $ 359.882

Lanes UZA

60 9980080

Lake Added Travel Colfax to 451h Ave

STBG I

Chicago 2021 CN $ 7.665.600 $ 7.665.600

County

Lanes Whitcomb St

UZA

61 1601211

Lake County


Truck S1op Electrification.

CMAQ

Equipment. 3P Agreement


Flying J at 1-65/SR

2. 3P Agreement


CMAQ

Chicago 2018 PE $ 329.386 $ 329.386

UZA

Lake Signals. New or

lOlst Ave New STBG I

62 1702159 lOlst Ave Signals at Chicago 2018 PE $ 116000 $ 116.000

County Improved

Sheffield Ave. UZA


Lake Signals, New or


l01st Ave New STBGI

63 1702159

County

lOlst Ave

Improved

2019

RW

$ 20.000

$ 20.000


2020


CN


$ 391.000


$ 391.000


2021


PE


$ 600.385


$ 600.385


2018


PE


$ 1 600


$ 1 600

Signals at Chicago

Sheffield Ave. UZA


Lake Signals. New or


lOlst Ave New STBG I

64 1702159

County

lOlst Ave

Improved

Signals at Chicago

Sheffield Ave UZA


65 1601846 l..ake S1a1ion


Public Access E- Alternative Fuel 85 & CNG

Infrastructure S1ation 3P

Agreement .


CMAQ

Chicago UZA


Bicycle &

  1. 1592273 Lowell Pedestrian Equipment


    Up 1o 20 Bicycle Racks


    CMAQ

    Chicago UZA


    lnslall Signal Pre-

  2. 1592420 Merrillville Emption Devices I


All signals in Hobart, Crown Point.

Schererville. Merrillville. Highland


HSIP

Chicago 2019 CN $ 2.135 869 $ 2135.869 UZA

lnslall Signal f're. AllSigna in HSIP

68 1592420 Merrillville Emption Devices Other ake Chicago 2021 CN $ 1.017.563 $ 1,017.563 $

2 Counly LPA's) UZA


from 2021lo 2019


  1. 1006787 Merrillville Mississippi St


    Added Travel 93rd Ave lo 101sl Lanes Ave


    STBG I

    Chicago 2022 CN $ 3.612.000 $ 3 612.000

    UZA



  2. 0710056 Munster 451h St


Railroad Grade Separation &. Added Travel Lones

Reconstruction of

451h St from 0,2 PYB

mi E of Calumet Chicago 2018 CN $ 6.980.644 $ 6.980.644 Ave to Calumet UZA

Ave


Row ID


Des #


Sponsor


Route


Work Type


Locatfon


Federal Fund Type


Year


Phase


In TIP or SPMS

Only


TIP 2018


Actual

Oblgaled 2018


TIP 2019


TIP 2020


TIP 2021


2022


2023


71


0710056


Munster


45th St


Railroad Grade Separation & Added Travel

lanes


Reconstruction of 45th St from 0.2 mi E of Calumet Ave lo Calume1 Ave


STBGI

Chicago

UZA


201B


CN


$


2.6 19,356


$


2.619.356


72


1173597


Muns1er


E-l/Pennsy Trail


Bicycle & Pedestrian Facilities


Bik.e/Ped Trail Connector. Erie- Lacka"Nanna & Pennsy Greenway Trails al Cody Ditch and Mof'}h Ditch


TAP

Chicago

UZA


2019


CN


$


784,080


$


784.080


73


1173707


Munster


Pennsy Greenway


Bicycle & Pedestrian Facilities


Construct Pennsy Greenway Trail from Fisher St at Timrick Dr to Calumet Ave north of 45th St


CMAQ

Chicago

UZA


2020


CN


$


555 040


$ 555.040


74


t 600543


NIRPC


Purchase Alt Fuel


for Dunes Leaming Center

CMAQ

Chicago

UZA


2018


UPWP


$


40.000


$


40000


$


'40.000


75


1600543


NIRPC


CMAQ Planning


Public Education

SFY 2018

CMAQ

Chicago

UZA


2018


UPWP


$


360,000


$


360.000


$


360.000


76


1600543


NIRPC


Regional Planning


Origin- Destination Study

STBGI

Chicago

UZA


2018


UPWP


$


125000


$


125.000


$


125.000


77


I600543


NIRPC


Regional Planning


TIP SoHware license Fee

STBGI

Chicago

UZA


2018


UPWP


$


36,000


$


36.000


$


36.000


78


0300602


Portage


Iron Hon:e Trail


Bicycle & Pedestrian Focililies

Construct Trail from Hamstrom Rd lo Portage Ave


CMAQ

Chicago

UZA


2018


CN


$


164.680


$


164,680


79


0600754


Portage


Central Ave

Road Reconstruction (3R/4R

Standards) Env Mit.


Central Ave Reconstruc1ion: Hornstrom Rd to I 80/90 [Toll Road)


STBGI

Chicago

UZA


2018


RW


$


16.000


$


16.000


80


0600754


Portage


Central Ave


Rood Reconstruction (3R/4R

Standards)


Centro/ Ave Reconstruction: Hornstrom Rd to I 80/90 (Toll Road)


STBGI

Chicago

UZA


2018


CN


$


4 371.154


$


4.371.154


0900080


Portage


Central Ave


Access Control


Willowcreek Rd lnlerseclion lmprovemenls at Central Ave.


CMAQ

Chicago

UZA


2019


CN


$


1.152,000


$


1.152.000


81





Row ID


Des #


Sponsor


ltoute


Work.Type


Location


federal fund Type


Year


Phase


In TIP or SPMS

Only


TIP 2018


Adual Oblgaled 2018


TIP 2019


TIP 2020


TIP 2021


2022


2023


82


1173430


Portage


Central Ave


Road Reconstruction f3R/4R S1andards)


Central Ave. reconstruc1ion from Lake/Porter Co Une1o Willowcreek.

Road


STBGI

Chicago UZA


2018


RW


$ 200000


$ 200,000


83


1173430


Portage


Central Ave


Road Reconstruction f3R/4R Standards}


Central Ave reconstruction from ake/Porter Co. Une1o Willowcreek Road


STBGI

Chicago UZA


2021


CN


$ 2.080.000


$ .


$ 2.080.000


84


1500418


Portage


Marquette Trail


Bicycle & Pedestrian Facilities


Construct Marquette Greenway along Ameriplex Drive from SR 249 east to Solt Creek.


TAP

Chicago UZA


2021


CN


$ 1.495.560


$ 1.495,560


85


1601923


Portage


WiUowcreek Road


Bridge Rehabi1ilotion Or Repair

Rehobilitale Wlllowcreek Rd Bridge over 1- 80/90.


STBG I

Chicago UZA


2019


CN


$ 640.000


$ 640.000


86


1401029


Porter County


CR IOOS


lnfersec.

Improvement

CR 1005-2000 W

of CR725 Wlo 1000 E of CR SOOW


STBG I

Chicago UZA


2019


PE


$ 652000


$ 652.000


87


1173594


Porter County


Calumet Trail


Bicycle & Pedestrian Facili1ies

Calumet Trail Rehab. Pl & P2 (from Mineral Springs Rd to SR 49)


TAP

Chicago UZA


2022


CN


$ 1.495.560


$ 1.495 560


88


1500419


Porter County


Calumet Trail


Bicycle & Pedestrian Facilities


Construct Calumet Trail V from Broadway in Beverly Shores taus 12a1 LaPorte/Porter County Line.


TAP

Chicago UZA


2022


PE


$ 200.000


$ 200.000


89


1500419


Porter County


Calumet Trail


Bicycle & Pedestrian Facilities


Construe!

Calumet Trail V from Broadway in Beverly Shores t o US 12 al LaPorte/Porter County Line,


TAP

Chicago UZA


2023


CN


$ 1.400.000


$ 1,400.000


90


1700500


Poner County


WiUowcreek Road


Willowcreek Rood Extension Comdor Study (with NEPA)


CR 700N to US 30


STBGI

Chicago UZA


2018


PE


$ 248.000


$ 248.000




Row ID Des t Sponsor Route Work Type locatton

Federal Fund Type


Year Phase

In TIP or SPMS

Only


TIP 2018


Actual Oblgaled 2018


TIP 2019 TIP 2020 TIP 2021 2022 2023



91 0401062 Schererville


Pennsy Greenway


Bicycle & Pedestrian Facilities

Pennsy Greenway - Multiple Phases (Non-CN DES)


STBGI

Chicago 2018 PE $ 60,000 $ 60.000

UZA



Bicycle &

Pennsy


STBG I

$

92 0401062 Schererville Pennsy Pedestrian Greenway - Chicago 2018 RR 308.000 $ 308000 Greenway Multiple Phases

Facilities

(Non-CN DESI

UZA



  1. 1173595 Schererville


    Pennsy Greenway


    Bicycle & Pedestrian Facilities

    Pennsy Greenway P2 Main SI lo 1371h Ave,,


    TAP

    Chicago 2018 CN $ 387.002 $ 387.002

    UZA

  2. 1173595 Schererville

    Pennsy Greenway

    Bicycle & Pedestrian Facilities

    Pennsy Greenway P2. Main St to 1371h Ave.

    STBG I

    Chicago 2018 CN $ 800.000 $ 800.000

    UZA

    Pennsy

    Pennsy Greenway, P3

    Bicycle & from Wilhelm STBG I

  3. 1382661 Schererville Greenway Pedestrian Street at Chicago 2018 CN $ 1.278 000 $ 1.278.000 Facilities Schererville Town UZA

    Hall lo 2131h Street


    Kennedy Ave at

    Kennedy Added Travel Junclion St. South STBG I

  4. 1173760 Schererville

    Ave lanes

    lo 671h St. and Chicago 2019 RW $ 200.000 $ 200000

    then South to US UZA

    30


    Kennedy Ave at

    Kennedy Added Travel Junclion SI.Sou1h STBG I

  5. 1173760 Schererville

    Ave lanes

    to 67th St.and Chicago 2020 CN $ 4.206 .472 $ 4.206.472

    then Soulh lo US UZA

    30


    STBG I

  6. 1382603 Schererville Ave Lones Junc1ion St Chicago 2022 RW $ 200.000 $ 200000

    UZA


  7. 1382603 Schererville


    Kennedy Added Travel Oak SI lo Ave Lones Junction Sf


    STBG I

    Chicago 2023 CN $ 8.198.707 $ 8.198.707

    UZA


  8. 0900075 Valparaiso Silhavy Rd Rebuild 3R/4R


    Evans Ave to LaPorte Ave


    STBG I

    Chicago 2018 RW $ 200.000 $ 200.000

    UZA


  9. 0900075 Volporaiso Silhavy Rd Rebuild 3R/4R


    Evans Ave to LaPorte Ave


    STBGI

    Chicago 2019 CN $ 3.558.761 $ 3.558.761 UZA


    from 2022 to 2019


    lnteeclion Silhavy Rd STBGI

  10. 1382601 Valparaiso Silhavy Rd Improvement. Roundaboul at Chicago 2018 CN $ 3.558.760 $ 3.558.760 Roundabout LaPorte Ave UZA


    $ $ -

    ConstrueI Sidewalks in

  11. 1500421 Valparaiso Pedestrian vicinity of Chicago 2019 CN 277.840 $ 277840

Northview


from 2019 to 2018

Facilities

Elementary School [TAP SRTS)

UZA



Row ID


Des t


Sponsor


Route


Work Type


Location


Federal Fund Type


Year


Phase


In TIP or SPMS

Only


TIP 2018


Actual

Oblgaled 2018


TIP 2019


TIP 2020


TIP 2021


2022


2023


104


1601159


Valparaiso


Ransom Rd


Olher Type Project (Miscellaneous)

Ransom Rood Safely Improvements.

CR50W lo CR 150W


HSIP

Chicago

UZA


2019


RW


$ 23.400


$ 23.olOO


105


1601159


Valparaiso


Ransom Rd


Other Type Project (Miscellaneous)

Ransom Rood Safety Improvements.

CR50W lo CR 150W


HSIP

Chicago

UZA


2019


CN


$ 419 .220


$ 419.220


106


16011114


Valparaiso


FTA Tronsfen

CMAQ Demo Operating Assistance


V-Une Porter

Hospllal •I

CMAQ

Chicago

UZA


2019


Flex


$ 340.000


$ 340.000

$ -


107


16011114


Valparaiso


FTA Transren:

CMAQ Demo Operating Assis lance


V-Une Porter

Hospltal '2

CMAQ

Chicago

UZA


2020


Flex


$ 332.BOO


$ 332.BOO

$ -


108


16011114


Valparaiso


FTA Tronslen

CMAQ Demo Operating Assfstance


V-Line Porter

Haspital #3

CMAQ

Chicago

UZA


2021


Flex


$ 326.olOO


$ 326.400

$ -


109


1601185


Valparaiso


FTA Transfe


CMAQ Demo Operating Assistance


CMAQ Demo Chicago DASH Sus #5 !Year ti)


CMAQ

Chicago

UZA


2019


Flex


$ 275.200


$ 275.200


110


1601185


Valparaiso


AA Transfers


CMAQ Demo Operating Assistance


CMAQ Demo Chicago DASH Bus #5 !Year ti)


CMAQ

Chicago

UZA


2020


Flex


$ 269.600


$ 269.600


1 11


1601185


Valparaiso


FTA Transfers


CMAQ Demo Operaling Assistance


CMAQ Demo Chicago DASH Bus #5 !Year # I)


CMAQ

Chicago

UZA


2021


Flex


$ 264.000


$ 264.000


112


1601726


Winfield


Rondolph St


Other Type Project (Miscellaneous)


Randolph SI

HAWK Signal


HSIP

Chicago

UZA


2020


CN


$ 70.200


$ 70.200


113


1601727


Winfield


Randolph St


Other Type

Project

{Miscellaneous)


Randolph St School Zone Flashers


HSIP

Chicago

UlA


2020


CN


$ 9.000


$ 9.000


114


1601728


Winfield


109th Ave


Signoge. New or Replacement

109th Ave Signage lmprovemenls

HSIP

Chicago

UZA


2020


CN


$ 5 •00


$ 5 400

from 2019 to 2018


from 2020 to 2019


from 2021 to 2020


Row ID Des t Sponsor Route Work Type Location Federal Year Phase In TIP ot SPMS TIP 2018 Actval TIP 2019 TIP 2020 TIP 2021 2022 2023

Fund Type Only Oblgaled 2018

- ..

0900067 Merrillville Mississippi SI


Added Travel 83rd Ave 1o 93rd Lanes 1 Ave

oO- _,_ ;;.i..


STBG I

Chicago 2018 co $ 86.223 $ 86.223 $ 86.223

UZA

1173706 Merrillville C&O Trail Pedes.tr.ian

"

local Safety

173rd Ave to Mississippi SI

Ch.i.c.ago 2018 co $ 45.632 $ 45.632 $ 45.632

1592417 Porter Signs

Project

Reg 8. Worn Sign' Sec 164 2018 co $ 491 $ 491 $ 491


$ 20.668 $ 20 668 $ 20.668


$ 124.603.343 $ 26.007.393 $ 2004.971 $ 26 310961 $ 1 7.331.863 $ 22 236.944 $ 19.565.982 $ 13.150.200

2018 2018 2019 2020 2021 2022 2023

Apportionment $ 18.861.630 $ 18.861.630 $ 18861.630 $ 18.861.630 $ 18861,630 $ 18861.630 $ 18861.630

201 7 C/O $ 377.499 $ 377.499 $ $ $ $ $

PYB $ 6.980.644 $ 6.980.W $ 9.156 260 $ 550.000

Total Revenue s 26,219,773 $ 26.219,m s 28,017.890 s 19,411,630 s 18,861,630 s 18.861,630 s 18.861,630

Balance s 212,380 $ 24.214,802 s 1.706,929 s 2,079,767 s (3,375,314) s (704.352) s 5,711,430


2018-2021 TIP Is ttscally constrained: Revenue Js $92.510. 923 Expense fs $91.887, 161.

Full buildoul will occur in 2023.

2018-2021 Transportation Improvement Program for Lake, Porter, and LaPorte Counties, Indiana Amendment #04 October 2017


Local Projects/Pro ject Phases



DES Sponsor Project Description/Location TIP Action


Chicago Ave ATL Phase I: IN/IL State Line to Change Year (from

Fund Type


Phase Year Total Cost Federal Non-Federal

1500221 Hammond

Marble St 2021)

STBG I PE 2018 $ 1 1,750,000 $ 9,400,000 $ 2,350,000



1592420 Merrillville

Install Signal Pre-Emption Devices Phases 1 & 2 (Combined)

Increase Award HSIP CN 2019 $ 3,503,81 3 $ 3,153,432 $ 350,381



0900075 Valparaiso

Silhavy Road Reconstruction (3R/4R): Evans Change Year (from Ave to LaPorte Ave. 2022)

STBG I CN 2019 $ 4,448,451 $ 3,558,761 $ 889,690



1500421 Valparaiso


1382594 Cedar Lake

Construct Sidewalks in vicinity of Northview Change Year (from Elementary School (TAP SRTS) 2019)


Change Year Lake Shore Drive Intersection Improvements @ (advance from

Cline Ave (roundabout) 2022); Increase Award

TAP CN 2018 $ 347,300 $ 277,840 $ 69,460


STBG I CN 2019 $ 1,875,000 $ 1,500,000 $ 375,000



CMAQ Demo Operating Assistance: Broadway

Change Year

1600632 Gary PTC (advance from HSIP PE 201 8 $ 25,000 $ 22,500 $ 2,500

Express Year #3

2019



CMAQ Demo Operating Assistance: V-Line


Change Year

FTA 2018 $ 425,000 $ 340,000 $ 85,000

1601184 Valparaiso

Expansion to Porter Hospital

(advance from CMAQ FTA 2019 $ 416,000 $ 332,800 $ 83,200

2019, 2021, 2022)

FTA 2020 $ 408,000 $ 326,400 $ 81,600




1592274 Highland

Signage on multiple trails, installed. Multiple Change Year (from LPA's 2020)


TAP CN 2019 $ 1,000,000 $ 800,000 $ 200,000