Unified Planning Work Program
The 2040 Comprehensive Regional Plan that guides NIRPC’s planning activities identified five planning areas in which to focus upon. These include, the environment, growth + conservation, human + economic resources, stewardship + governance, and transportation. Throughout this UPWP each task will be identified by the icons below for which planning focus area the task contributes to.
Environment
Growth + conservation
Human + economic resources
Stewardship + governance
Transportation
DRAFT 2019-2020 Unified Planning Work Program
NIRPC Commission – 2018 appointments 12
NIRPC staff organization and functions 14
FHWA + FTA planning emphasis areas 15
Metropolitan planning activities and tasks 16
Administration + public participation 16
Planning management + administration 17
Public participation + communication tools 18
Title VI program management 19
Environmental Justice program management 20
Americans with Disabilities Act program management 21
UPWP development and management 22
Planning data analysis + forecasts 25
Performance-based planning activities 27
Transportation Improvement Program development 32
Transportation Improvement Program management 33
Environmental mitigation planning 34
4
2050 comprehensive regional plan development 36
Comprehensive regional plan implementation 37
Surface transportation planning 41
Environmental linkages planning 43
Active transportation planning 45
Special planning activities 47
Alternative fuels – Dunes Learning Center partnership 55
General management of NIRPC, office + staff 59
Non-NIRPC planning activities 66
UPWP submittal letters and resolution of adoption 67
Cost allocation plan approvals 70
NIRPC / INDOT / transit operators 72
CMAP / NIRPC / IDOT / INDOT 84
FHWA planning emphasis area letter 86
activities
activities
Transportation | Environment | Communication Finance | Adm inistration | KRC | ED | ||||||||||||||||||||||||||
2019 | Trey Wadsworth | Mitch Barloga | Gabrielle Biciunas | Charles Bradsky | Eman Ibrahim | Terrell Waddell | Scott Weber | James Winters | Reg. Planner | GIS Planner | Graduate intern | Undergrad intern | Kathy Luther | Joe Exl | Rachel Veronesi | John Smith | Public Participation | Daria Sztaba | Connie Boos | Allen Hammond | Talaya Jones | Lisa Todd | Meredith Stilwell | Mary Thorne | Carolyn Brown | Admin Asst | Jody Melton | Ty Warner | Total number | ||
Staff time assigned to USDOT federal grants > | 100% | 100% | 100% | 100% | 100% | 100% | 90% | 100% | 100% | 100% | 100% | 100% | 59% | 30% | 100% | 50% | 100% | 20% | 0% | 100% | 33% | 85% | 20% | 80% | 0% | 65% | 0% | 0% | |||
Staff time assigned to non-USDOT federal grants > | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 21% | 70% | 0% | 0% | 0% | 0% | 0% | 0% | 2% | 0% | 0% | 0% | 0% | 35% | 0% | 0% | |||
Staff time assigned to NIRPC share > | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 5% | |||
Staff time allocated > | 0% | 0% | 0% | 0% | 0% | 0% | 10% | 0% | 0% | 0% | 0% | 0% | 20% | 0% | 0% | 50% | 0% | 80% | 100% | 0% | 65% | 15% | 80% | 20% | 100% | 0% | 0% | 95% | |||
UPWP section | |||||||||||||||||||||||||||||||
Administration and public participation | of hours | ||||||||||||||||||||||||||||||
Planning management + administration | 19 100 | 984 | - | - | - | - | - | - | - | - | - | - | - | 574 | - | - | - | - | 164 | - | - | - | - | 164 | 328 | - | - | - | - | 2,214 | |
Public participation + communication tools | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 738 | 1,394 | - | - | - | - | - | 164 | 82 | - | - | - | - | 2,378 | ||
Title VI program management | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 82 | - | - | - | - | - | - | - | - | - | - | - | 82 | ||
Environmental Justice program management | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 82 | - | - | - | - | - | - | - | - | - | - | - | 82 | ||
ADA program management | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 82 | - | - | 82 | - | - | - | - | - | - | - | - | 164 | ||
UPWP development and management | 164 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 164 | - | - | - | - | - | 164 | - | - | - | - | 492 | ||
Total costs for task group | |||||||||||||||||||||||||||||||
Data collection + analysis | |||||||||||||||||||||||||||||||
Transportation data collection | 19 200 | - | - | - | - | - | 1,640 | 82 | - | 164 | 164 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 2,050 | |
Planning data analysis + forecasts | - | - | - | - | - | - | 82 | - | 984 | 164 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 1,230 | ||
GIS support services | - | - | - | - | - | - | - | - | 82 | 1,312 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 1,394 | ||
Performance-based planning activities | - | - | - | - | - | - | 328 | - | 164 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 492 | ||
Congestion management | - | - | - | - | - | - | 246 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 246 | ||
Travel demand modeling | - | - | - | - | - | - | 246 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 246 | ||
Air quality conformity | - | - | - | - | - | - | 246 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 246 | ||
Total costs for task group | |||||||||||||||||||||||||||||||
Short-range planning | |||||||||||||||||||||||||||||||
PL + 5303 | TIP development | 19 300 | - | - | - | 820 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 820 |
TIP management | - | - | - | 820 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 246 | - | - | 1,066 | ||
Environmental red flag investigations | - | - | - | - | - | - | - | - | - | - | - | - | - | 164 | - | - | - | - | - | - | - | - | - | - | - | 82 | - | - | 246 | ||
Total costs for task group | |||||||||||||||||||||||||||||||
Long-range planning | |||||||||||||||||||||||||||||||
2050 CRP development | 19 400 | 410 | - | 984 | - | 820 | - | - | - | - | - | 1,640 | 1,640 | 328 | 164 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 5,986 | |
CRP implementation | - | - | 492 | - | 164 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 656 | ||
Environmental linkages planning | - | - | - | - | - | - | - | - | - | - | - | - | - | 164 | - | - | - | - | - | - | - | - | - | - | - | 246 | - | - | 410 | ||
Regional land use planning | - | - | 164 | - | 492 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 164 | - | - | - | - | 820 | ||
Surface transportation planning | - | - | - | - | - | - | 246 | - | 246 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 328 | - | - | - | - | 820 | ||
Total costs for task group | |||||||||||||||||||||||||||||||
Multi-modal planning | |||||||||||||||||||||||||||||||
Active transportation planning | 19 500 | - | 1,640 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 246 | - | - | - | - | 1,886 | |
Transit planning | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
Total costs for task group | |||||||||||||||||||||||||||||||
Total budget for PL / 5303 + match L / 5303 + match available per MPO Council distribution ammed PL / 5303 + needed match to program PL / 5303 | 574 | 1,640 | 1,640 | 1,640 | 1,476 | 1,640 | 1,476 | - | 1,640 1,640 1,640 1,640 328 492 - 738 1,640 164 - 82 ^ hours of staff time billed to PL + 5303 across all metropolitan planning activities / 1,640 = 100% ^ | - | - | 164 | 984 | - | 574 | - | - | ||||||||||||||
Transportation | Environment | Communication Finance | Adm inistration | KRC | ED | ||||||||||||||||||||||||||
2019 | Trey Wadsworth | Mitch Barloga | Gabrielle Biciunas | Charles Bradsky | Eman Ibrahim | Terrell Waddell | Scott Weber | James Winters | Reg. Planner | GIS Planner | Graduate intern | Undergrad intern | Kathy Luther | Joe Exl | Rachel Veronesi | John Smith | Public Participation | Daria Sztaba | Connie Boos | Allen Hammond | Talaya Jones | Lisa Todd | Meredith Stilwell | Mary Thorne | Carolyn Brown | Admin Asst | Jody Melton | Ty Warner | Total number | ||
Staff time assigned to USDOT federal grants > | 100% | 100% | 100% | 100% | 100% | 100% | 90% | 100% | 100% | 100% | 100% | 100% | 59% | 30% | 100% | 50% | 100% | 20% | 0% | 100% | 33% | 85% | 20% | 80% | 0% | 65% | 0% | 0% | |||
Staff time assigned to non-USDOT federal grants > | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 21% | 70% | 0% | 0% | 0% | 0% | 0% | 0% | 2% | 0% | 0% | 0% | 0% | 35% | 0% | 0% | |||
Staff time assigned to NIRPC share > | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 5% | |||
Staff time allocated > | 0% | 0% | 0% | 0% | 0% | 0% | 10% | 0% | 0% | 0% | 0% | 0% | 20% | 0% | 0% | 50% | 0% | 80% | 100% | 0% | 65% | 15% | 80% | 20% | 100% | 0% | 0% | 95% | |||
UPWP section | |||||||||||||||||||||||||||||||
Administration and public participation | of hours | ||||||||||||||||||||||||||||||
Planning management + administration | 19 100 | 984 | - | - | - | - | - | - | - | - | - | - | - | 574 | - | - | - | - | 164 | - | - | - | - | 164 | 328 | - | - | - | - | 2,214 | |
Public participation + communication tools | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 738 | 1,394 | - | - | - | - | - | 164 | 82 | - | - | - | - | 2,378 | ||
Title VI program management | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 82 | - | - | - | - | - | - | - | - | - | - | - | 82 | ||
Environmental Justice program management | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 82 | - | - | - | - | - | - | - | - | - | - | - | 82 | ||
ADA program management | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 82 | - | - | 82 | - | - | - | - | - | - | - | - | 164 | ||
UPWP development and management | 164 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 164 | - | - | - | - | - | 164 | - | - | - | - | 492 | ||
Total costs for task group | |||||||||||||||||||||||||||||||
Data collection + analysis | |||||||||||||||||||||||||||||||
Transportation data collection | 19 200 | - | - | - | - | - | 1,640 | 82 | - | 164 | 164 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 2,050 | |
Planning data analysis + forecasts | - | - | - | - | - | - | 82 | - | 984 | 164 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 1,230 | ||
GIS support services | - | - | - | - | - | - | - | - | 82 | 1,312 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 1,394 | ||
Performance-based planning activities | - | - | - | - | - | - | 328 | - | 164 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 492 | ||
Congestion management | - | - | - | - | - | - | 246 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 246 | ||
Travel demand modeling | - | - | - | - | - | - | 246 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 246 | ||
Air quality conformity | - | - | - | - | - | - | 246 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 246 | ||
Total costs for task group | |||||||||||||||||||||||||||||||
Short-range planning | |||||||||||||||||||||||||||||||
PL + 5303 | TIP development | 19 300 | - | - | - | 820 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 820 |
TIP management | - | - | - | 820 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 246 | - | - | 1,066 | ||
Environmental red flag investigations | - | - | - | - | - | - | - | - | - | - | - | - | - | 164 | - | - | - | - | - | - | - | - | - | - | - | 82 | - | - | 246 | ||
Total costs for task group | |||||||||||||||||||||||||||||||
Long-range planning | |||||||||||||||||||||||||||||||
2050 CRP development | 19 400 | 410 | - | 984 | - | 820 | - | - | - | - | - | 1,640 | 1,640 | 328 | 164 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 5,986 | |
CRP implementation | - | - | 492 | - | 164 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 656 | ||
Environmental linkages planning | - | - | - | - | - | - | - | - | - | - | - | - | - | 164 | - | - | - | - | - | - | - | - | - | - | - | 246 | - | - | 410 | ||
Regional land use planning | - | - | 164 | - | 492 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 164 | - | - | - | - | 820 | ||
Surface transportation planning | - | - | - | - | - | - | 246 | - | 246 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 328 | - | - | - | - | 820 | ||
Total costs for task group | |||||||||||||||||||||||||||||||
Multi-modal planning | |||||||||||||||||||||||||||||||
Active transportation planning | 19 500 | - | 1,640 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 246 | - | - | - | - | 1,886 | |
Transit planning | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
Total costs for task group | |||||||||||||||||||||||||||||||
Total budget for PL / 5303 + match L / 5303 + match available per MPO Council distribution ammed PL / 5303 + needed match to program PL / 5303 | 574 | 1,640 | 1,640 | 1,640 | 1,476 | 1,640 | 1,476 | - | 1,640 1,640 1,640 1,640 328 492 - 738 1,640 164 - 82 ^ hours of staff time billed to PL + 5303 across all metropolitan planning activities / 1,640 = 100% ^ | - | - | 164 | 984 | - | 574 | - | - | ||||||||||||||
Estimated time charges
2019 | Transportation Environment Communication Finance Adm inistration KRC ED | ||||||||||||||||||||||||||||||
Trey Wadsworth | Mitch Barloga | Gabrielle Biciunas | Charles Bradsky | Eman Ibrahim | Terrell Waddell | Scott Weber | James Winters | Reg. Planner | GIS Planner | Graduate intern | Undergrad intern | Kathy Luther | Joe Exl | Rachel Veronesi | John Smith | Public Participation | Daria Sztaba | Connie Boos | Talaya Jones | Lisa Todd | Meredith Stilwell | Mary Thorne | Carolyn Brown | Admin Asst | Jody Melton | Ty Warner | Total number of hours | ||||
Staff time assigned to USDOT federal grants > | 100% | 100% | 100% | 100% | 100% | 100% | 90% | 100% | 100% | 100% | 100% | 100% | 59% | 30% | 100% | 50% | 100% | 20% | 0% | 100% | 33% | 85% | 20% | 80% | 0% | 65% | 0% | 0% | |||
Staff time assigned to non-USDOT federal grants > | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 21% | 70% | 0% | 0% | 0% | 0% | 0% | 0% | 2% | 0% | 0% | 0% | 0% | 35% | 0% | 0% | |||
Staff time assigned to NIRPC share > | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 5% | |||
Staff time allocated > | 0% | 0% | 0% | 0% | 0% | 0% | 10% | 0% | 0% | 0% | 0% | 0% | 20% | 0% | 0% | 50% | 0% | 80% | 100% | 0% | 65% | 15% | 80% | 20% | 100% | 0% | 0% | 95% | |||
UPWP section | |||||||||||||||||||||||||||||||
Sp | No activities identified in this UPWP period | 19 600 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
Total budget for 5307 + match | |||||||||||||||||||||||||||||||
5307 | Sub-grantees oversight | 19 700 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 1,558 | 541 | 1,394 | - | - | - | 164 | - | - | 3,657 |
Transit planning | - | - | - | - | 164 | - | 164 | 1,640 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 246 | - | - | 2,214 | ||
Total budget for 5307 + match | |||||||||||||||||||||||||||||||
vitie | |||||||||||||||||||||||||||||||
Air quality + eduction (FY2018 CMAQ) | 19 800 | - | - | - | - | - | - | - | - | - | - | - | - | 148 | - | 1,640 | 82 | - | - | - | - | - | - | - | - | - | 82 | - | - | 1,952 | |
Household Travel Survey (FY2017 STPBG) | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
E-TIP (FY 2017 STPBG) | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
Alternative fuels - Dunes Learning Ctr partner. | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
Total budget for CMAQ or STP + match |
Loaded individual cost on grants > - - - - - - - - - - - - - - - - - - - - - - - - - - -
Loaded individual cost on grants > - - - - - - - - - - - - - - - - - - - - - - - - - - -
-
-
TIP funded acti
TIP funded acti
ecial
ecial
2019 estimated task budgets
UPWP section | Task group name | Funding source | Total by federal funding source | Total task cost | Federal share | NIRPC share | Non-NIRPC / in-kind value |
19-100 | Administration and public participation | PL/5303 | $1,383,956 | $464,105 | $371,284 | $92,821 | $0 |
19-200 | Data collection + analysis | $408,196 | $326,557 | $81,639 | $0 | ||
19-300 | Short-range planning | $191,286 | $153,029 | $38,257 | $0 | ||
19-400 | Long-range planning | $486,414 | $389,131 | $97,283 | $0 | ||
19-500 | Multi-modal planning | $179,943 | $143,954 | $35,989 | $0 | ||
19-600 | Special planning activities | $0 | $0 | $0 | $0 | ||
19-700 | FTA activities + tasks | 5307 | $246,105 | $307,631 | $246,105 | $61,526 | $0 |
19-800 | NIRPC programs | CMAQ / STP | $271,492 | $369,365 | $271,492 | $9,000 | $58,873 |
19-900 | NIRPC administration / other grants | Non-USDOT | TBD | TBD | TBD | TBD | TBD |
DRAFT 2019-2020 Unified Planning Work Program
5303 activities
5303 activities
Estimated time charges
2020 | Transportation | Environment | Communication Finance | Adm inistration | KRC | ED | ||||||||||||||||||||||||||
Trey Wadsworth | Mitch Barloga | Gabrielle Biciunas | Charles Bradsky | Eman Ibrahim | Terrell Waddell | Scott Weber | James Winters | Reg. Planner | GIS Planner | Graduate intern | Undergrad intern | Kathy Luther | Joe Exl | Rachel Veronesi | John Smith | Public Participation | Daria Sztaba | Connie Boos | Allen Hammond | Talaya Jones | Lisa Todd | Meredith Stilwell | Mary Thorne | Carolyn Brown | Admin Asst | Jody Melton | Ty Warner | Total number of | ||||
Staff time assigned to USDOT federal grants > | 100% | 100% | 100% | 100% | 100% | 100% | 90% | 100% | 100% | 100% | 100% | 100% | 59% | 30% | 100% | 50% | 100% | 20% | 0% | 100% | 33% | 85% | 20% | 80% | 0% | 65% | 0% | 0% | ||||
Staff time assigned to non-USDOT federal grants > | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 21% | 70% | 0% | 0% | 0% | 0% | 0% | 0% | 2% | 0% | 0% | 0% | 0% | 35% | 0% | 0% | ||||
Staff time assigned to NIRPC share > | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 5% | ||||
Staff time allocated > | 0% | 0% | 0% | 0% | 0% | 0% | 10% | 0% | 0% | 0% | 0% | 0% | 20% | 0% | 0% | 50% | 0% | 80% | 100% | 0% | 65% | 15% | 80% | 20% | 100% | 0% | 0% | 95% | ||||
Administration and public participation | hours | |||||||||||||||||||||||||||||||
Planning management + administration | 19 100 | 1,148 | - | - | - | - | - | - | - | - | - | - | - | 328 | - | - | - | - | 164 | - | - | - | - | 164 | 328 | - | - | - | - | 2,132 | ||
Public participation + communication tools | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 738 | 1,394 | - | - | - | - | - | 164 | 82 | - | - | - | - | 2,378 | |||
Title VI program management | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 82 | - | - | - | - | - | - | - | - | - | - | - | 82 | |||
Environmental Justice program management | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 82 | - | - | - | - | - | - | - | - | - | - | - | 82 | |||
ADA program management | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 82 | - | - | 82 | - | - | - | - | - | - | - | - | 164 | |||
UPWP development and management | 164 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 164 | - | - | - | - | - | 164 | - | - | - | - | 492 | |||
Total costs for task group | ||||||||||||||||||||||||||||||||
Data collection + analysis | ||||||||||||||||||||||||||||||||
Transportation data collection | 19 200 | - | - | - | - | - | 1,640 | 82 | - | 164 | 164 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 2,050 | ||
Planning data analysis + forecasts | - | - | - | - | - | - | 82 | - | 984 | 164 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 1,230 | |||
GIS support services | - | - | - | - | - | - | - | - | 82 | 1,312 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 1,394 | |||
Performance-based planning activities | - | - | - | - | - | - | 328 | - | 164 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 492 | |||
Congestion management | - | - | - | - | - | - | 246 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 246 | |||
Travel demand modeling | - | - | - | - | - | - | 246 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 246 | |||
Air quality conformity | - | - | - | - | - | - | 246 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 246 | |||
Total costs for task group | ||||||||||||||||||||||||||||||||
Short-range planning | ||||||||||||||||||||||||||||||||
PL + | TIP development | 19 300 | - | - | - | 820 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 820 | |
TIP management | - | - | - | 820 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 246 | - | - | 1,066 | |||
Environmental red flag investigations | - | - | - | - | - | - | - | - | - | - | - | - | - | 164 | - | - | - | - | - | - | - | - | - | - | - | 82 | - | - | 246 | |||
Total costs for task group | ||||||||||||||||||||||||||||||||
Long-range planning | ||||||||||||||||||||||||||||||||
CRP implementation | - | - | 1,476 | - | 984 | - | - | - | - | - | 1,640 | 1,640 | 164 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 5,904 | |||
Environmental linkages planning | - | - | - | - | - | - | - | - | - | - | - | - | - | 328 | - | - | - | - | - | - | - | - | - | - | - | 246 | - | - | 574 | |||
Regional land use planning | - | - | 164 | - | 492 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 164 | - | - | - | - | 820 | |||
Surface transportation planning | - | - | - | - | - | - | 410 | - | 246 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 328 | - | - | - | - | 984 | |||
Total costs for task group | ||||||||||||||||||||||||||||||||
Multi-modal planning | ||||||||||||||||||||||||||||||||
Active transportation planning | 19 500 | - | 1,640 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 246 | - | - | - | - | 1,886 | ||
Transit planning (programmed in 5307) | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | |||
Total costs for task group | ||||||||||||||||||||||||||||||||
Total budget for PL / 5303 + match | 1,312 1,640 | 1,640 | 1,640 | 1,476 | 1,640 | 1,640 | - | 1,640 | 1,640 | 1,640 | 1,640 | 492 492 | - | 738 1,640 328 | - | 82 | - | - | 328 1,312 | - | 574 | - | - |
2020 | Transportation Environment Communication Finance Adm inistration KRC ED | ||||||||||||||||||||||||||||||
Trey Wadsworth | Mitch Barloga | Gabrielle Biciunas | Charles Bradsky | Eman Ibrahim | Terrell Waddell | Scott Weber | James Winters | Reg. Planner | GIS Planner | Graduate intern | Undergrad intern | Kathy Luther | Joe Exl | Rachel Veronesi | John Smith | Public Participation | Daria Sztaba | Allen Hammond | Talaya Jones | Lisa Todd | Meredith Stilwell | Mary Thorne | Carolyn Brown | Admin Asst | Jody Melton | Ty Warner | Total number of hours | ||||
Staff time assigned to USDOT federal grants > | 100% | 100% | 100% | 100% | 100% | 100% | 90% | 100% | 100% | 100% | 100% | 100% | 59% | 30% | 100% | 50% | 100% | 20% | 0% | 100% | 33% | 85% | 20% | 80% | 0% | 65% | 0% | 0% | |||
Staff time assigned to non-USDOT federal grants > | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 21% | 70% | 0% | 0% | 0% | 0% | 0% | 0% | 2% | 0% | 0% | 0% | 0% | 35% | 0% | 0% | |||
Staff time assigned to NIRPC share > | 0% | 0% | 0% | 0% | 0% | 0% | 0% |