Row ID | Des # | Sponsor | Route | Work Category | Work Type | Location | County | Des Length | Federal Fund Type | Year | Phase | Total Funds | Federal Funds | Non-Federal Funds | NE/ RS/ A#/ AM | |
INDIANA DEPARTMENT of TRANSPORTATION (INDOT) Sponsored Projects | ||||||||||||||||
1 | 0500028 | INDOT | SR 2 | District Bridge Project (Replacement) | Br Repl, Cont. Rc Slab | Bridge over M J Brown Ditch, 2.70 miles E of I-65 | Lake | 0 | STBG | State | 2018 | CN | $ 1,342,000 | $ 1,073,600 | $ 268,400 | |
2 | 0500480 | INDOT | US 20 | Added Travel Lanes Project | Added Travel Lanes, Construct Turn Lanes | US 421 to US 35/SR 212 in Michigan City | LaPorte | 3.87299991 | STBG | State | 2018 | CN | $ 720,000 | $ 576,000 | $ 144,000 | RS |
3 | 0500480 | INDOT | US 20 | Added Travel Lanes Project | Added Travel Lanes, Construct Turn Lanes | US 421 to US 35/SR 212 in Michigan City | LaPorte | 3.87299991 | STBG | State | 2018 | PE | $ 820,000 | $ 656,000 | $ 164,000 | RS |
4 | 0500480 | INDOT | US 20 | Added Travel Lanes Project | Added Travel Lanes, Construct Turn Lanes | US 421 to US 35/SR 212 in Michigan City | LaPorte | 3.87299991 | STBG | State | 2018 | PE | $ 1,182,000 | $ 945,600 | $ 236,400 | RS |
5 | 0500480 | INDOT | US 20 | Added Travel Lanes Project | Added Travel Lanes, Construct Turn Lanes | US 421 to US 35/SR 212 in Michigan City | LaPorte | 3.87299991 | STBG | State | 2018 | CN | $ 8,480,000 | $ 6,784,000 | $ 1,696,000 | RS |
6 | 0902261 | INDOT | US 12 | District Bridge Project (Rehabilitation) | Bridge Deck Overlay | over Trail Creek, 0.21 miles East of US 35 | LaPorte | 0 | STBG | State | 2018 | PE | $ 240,000 | $ 192,000 | $ 48,000 | |
7 | 0902261 | INDOT | US 12 | District Bridge Project (Rehabilitation) | Bridge Deck Overlay | over Trail Creek, 0.21 miles East of US 35 | LaPorte | 0 | STBG | State | 2018 | CN | $ 2,654,647 | $ 2,123,718 | $ 530,929 |
Row ID | Des # | Sponsor | Route | Work Category | Work Type | Location | County | Des Length | Federal Fund Type | Year | Phase | Total Funds | Federal Funds | Non-Federal Funds | NE/ RS/ A#/ AM |
8 | 1006456 | INDOT | PR 1078 | New Road Construction Project | New Road Construction | Illiana Expressway | Lake | 0 | State | 2018 | PE | $ - | $ - | $ - | RS/NE |
9 | 1006456 | INDOT | PR 1078 | New Road Construction Project | New Road Construction | Illiana Expressway | Lake | 0 | State | 2018 | CN | $ - | $ - | $ - | RS/NE |
10 | 1006608 | INDOT | SR 130 | District Intersection Improvement Project | Other Intersection Improvement | SR 130 & CR 600N, 0.65 miles E of Lake/Porter Co Line00 | Porter | 0 | STBG State | 2018 | PE | $ 50,000 | $ 40,000 | $ 10,000 | |
11 | 1006608 | INDOT | SR 130 | District Intersection Improvement Project | Other Intersection Improvement | SR 130 & CR 600N, 0.65 miles E of Lake/Porter Co Line00 | Porter | 0 | STBG State | 2018 | UT1 | $ 50,000 | $ 40,000 | $ 10,000 | |
12 | 1006608 | INDOT | SR 130 | District Intersection Improvement Project | Other Intersection Improvement | SR 130 & CR 600N, 0.65 miles E of Lake/Porter Co Line00 | Porter | 0 | STBG State | 2020 | CN | $ 836,186 | $ 668,949 | $ 167,237 | |
13 | 1006608 | INDOT | SR 130 | District Intersection Improvement Project | Other Intersection Improvement | SR 130 & CR 600N, 0.65 miles E of Lake/Porter Co Line00 | Porter | 0 | STBG State | 2020 | RR2 | $ 350,000 | $ 280,000 | $ 70,000 | |
14 | 1006612 | INDOT | US 30 | District Intersection Improvement Project | Intersect. Improv. W/ Added Turn Lanes | & Randolph St | Lake | 0 | NHPP Non Interstate | 2018 | CN | $ 537,000 | $ 429,600 | $ 107,400 |
Row ID | Des # | Sponsor | Route | Work Category | Work Type | Location | County | Des Length | Federal Fund Type | Year | Phase | Total Funds | Federal Funds | Non-Federal Funds | NE/ RS/ A#/ AM |
15 | 1006619 | INDOT | SR 149 | District Intersection Improvement Project | Intersect. Improv. W/ Added Turn Lanes | & CR 1050N | Porter | 0 | STBG State | 2018 | CN | $ 643,000 | $ 514,400 | $ 128,600 | |
16 | 1006622 | 73435952 | US 20 | District Intersection Improvement Project | Other Intersection Improvement | & Waverly Rd | Porter | 0 | STBG State | 2018 | CN | $ 799,000 | $ 639,200 | $ 159,800 | |
17 | 1006624 | INDOT | US 6 | District Intersection Improvement Project | Other Intersection Improvement | & Meridian St | Porter | 0 | STBG State | 2018 | PE | $ 45,000 | $ 36,000 | $ 9,000 | |
18 | 1006624 | INDOT | US 6 | District Intersection Improvement Project | Other Intersection Improvement | & Meridian St | Porter | 0 | STBG State | 2018 | CN | $ 582,564 | $ 466,051 | $ 116,513 | |
19 | 1006634 | INDOT | SR 51 | District Bridge Project (Replacement) | HMA Overlay, Functional | from US 30 to US 20 | Lake | 9.5539999 | STBG State | 2018 | PE | $ 15,000 | $ 12,000 | $ 3,000 | |
20 | 1006634 | INDOT | SR 51 | District Bridge Project (Replacement) | HMA Overlay, Functional | from US 30 to US 20 | Lake | 9.5539999 | STBG State | 2018 | CN | $ 4,994,973 | $ 3,995,978 | $ 998,995 | |
21 | 1006635 | INDOT | US 41 | District Small Structure Project | HMA Overlay, Preventive Maintenance | from SR 2 N jct to 2.57mi S of US 231 (135th Ave) | Lake | 7.37200022 | NHPP Non Interstate | 2018 | CN | $ 3,100,000 | $ 2,480,000 | $ 620,000 |
Row ID | Des # | Sponsor | Route | Work Category | Work Type | Location | County | Des Length | Federal Fund Type | Year | Phase | Total Funds | Federal Funds | Non-Federal Funds | NE/ RS/ A#/ AM |
22 | 1006716 | INDOT | I 65 | District Small Structure Project | Bridge Deck Replacement | NB Bridge over Conrail RR, Central Ave and Ditch, 0.67 miles N of I80/94 | Lake | 0 | NHPP Interstate | 2018 | CN | $ 4,749,000 | $ 4,274,100 | $ 474,900 | |
23 | 1006746 | INDOT | I 94 | District Bridge Project (Rehabilitation) | Small Structure Pipe Lining | 0.86 mi E of US 421 | LaPorte | 0 | NHPP Interstate | 2018 | CN | $ 489,000 | $ 440,100 | $ 48,900 | |
24 | 1006747 | INDOT | I 94 | District Bridge Project (Rehabilitation) | Small Structure Pipe Lining | 1.31 mi E of US 421 | LaPorte | 0 | NHPP Interstate | 2018 | CN | $ 273,000 | $ 245,700 | $ 27,300 | |
25 | 1006756 | INDOT | SR 51 | District Bridge Project (Replacement) | Bridge Replacement, Concrete | SR 51, SBL at Burns Ditch (Deep River), 2.95 miles N of US 6 | Lake | 0 | STBG State | 2018 | CN | $ 2,314,937 | $ 1,851,950 | $ 462,987 | |
26 | 1006756 | INDOT | SR 51 | District Bridge Project (Replacement) | Bridge Replacement, Concrete | SR 51, SBL at Burns Ditch (Deep River), 2.95 miles N of US 6 | Lake | 0 | STBG State | 2018 | PE | $ 335,000 | $ 268,000 | $ 67,000 | |
27 | 1006772 | INDOT | US 231 | District Small Structure Project | HMA Overlay, Functional | from W Jct of SR 55 to US 41 | Lake | 5.55600023 | NHPP Non Interstate | 2018 | CN | $ 1,700,000 | $ 1,360,000 | $ 340,000 | |
28 | 1172245 | INDOT | US 41 | District Bridge Project (Rehabilitation) | Bridge Deck Replacement | Bridge over Conrail, IHB RR, and 4 other streets, 1.95 miles S of I-90 | Lake | 0 | STBG State | 2018 | CN | $ 1,259,000 | $ 1,007,200 | $ 251,800 |
Row ID | Des # | Sponsor | Route | Work Category | Work Type | Location | County | Des Length | Federal Fund Type | Year | Phase | Total Funds | Federal Funds | Non-Federal Funds | NE/ RS/ A#/ AM |
29 | 1172430 | INDOT | I 65 | Added Travel Lanes Project | Added Travel Lanes | I-65 ATL from US 231 to US 30 | Lake | 5.58300018 | NHPP Interstate | 2019 | PE | $ 3,750,000 | $ 3,375,000 | $ 375,000 | RS/NE |
30 | 1173422 | INDOT | I 65 | District Small Structure Project | Bridge Deck Replacement | SBBridge over Conrail RR, Central Ave and Ditch, 0.67 miles N of I80/94 | Lake | 0 | NHPP Interstate | 2018 | CN | $ 4,749,000 | $ 4,274,100 | $ 474,900 | |
31 | 1296339 | INDOT | US 20 | District Bridge Project (Rehabilitation) | Bridge Painting | Bridge over Amtrak and Chandler Rd, 0.88 miles E of SR 520 | Porter | 0 | STBG State | 2021 | PE | $ 50,000 | $ 40,000 | $ 10,000 | |
32 | 1296339 | INDOT | US 20 | District Bridge Project (Rehabilitation) | Bridge Painting | Bridge over Amtrak and Chandler Rd, 0.88 miles E of SR 520 | Porter | 0 | STBG State | 2021 | CN | $ 572,488 | $ 457,990 | $ 114,498 | |
33 | 1296364 | INDOT | SR 49 | District Bridge Project (Rehabilitation) | Bridge Painting | Bridge over Amtrak, 0.33 miles N of I-94 | Porter | 0 | NHPP Non Interstate | 2018 | PE | $ 27,740 | $ 22,192 | $ 5,548 | |
34 | 1296364 | INDOT | SR 49 | District Bridge Project (Rehabilitation) | Bridge Painting | Bridge over Amtrak, 0.33 miles N of I-94 | Porter | 0 | NHPP Non Interstate | 2018 | RR1 | $ 100,000 | $ 80,000 | $ 20,000 | |
35 | 1296364 | INDOT | SR 49 | District Bridge Project (Rehabilitation) | Bridge Painting | Bridge over Amtrak, 0.33 miles N of I-94 | Porter | 0 | NHPP Non Interstate | 2020 | CN | $ 349,312 | $ 279,450 | $ 69,862 |
Row ID | Des # | Sponsor | Route | Work Category | Work Type | Location | County | Des Length | Federal Fund Type | Year | Phase | Total Funds | Federal Funds | Non-Federal Funds | NE/ RS/ A#/ AM |
36 | 1296364 | INDOT | SR 49 | District Bridge Project (Rehabilitation) | Bridge Painting | Bridge over Amtrak, 0.33 miles N of I-94 | Porter | 0 | NHPP Non Interstate | 2020 | CE | $ 130,000 | $ 104,000 | $ 26,000 | |
37 | 1296943 | INDOT | US 20 | District Pavement Project (Non-I) | Interchange Modification | US 20 at US 35/SR 212 | LaPorte | 0 | STBG State | 2018 | CN | $ 647,000 | $ 517,600 | $ 129,400 | |
38 | 1296981 | INDOT | SR 51 | District Bridge Project (Replacement) | Bridge Removal | NB Bridge over Burns Ditch, 0.55 miles S of US 20 | Lake | 0 | STBG State | 2018 | CN | $ 2,681,955 | $ 2,145,564 | $ 536,391 | |
39 | 1296986 | INDOT | I 65 | District Small Structure Project | Bridge Replacement, Steel | 101st Avenue over I-65, 2.50 miles S of US 30 | Lake | 0 | NHPP Interstate | 2018 | CN | $ 1,472,000 | $ 1,324,800 | $ 147,200 | |
40 | 1296990 | INDOT | US 20 | District Bridge Project (Rehabilitation) | Bridge Deck Replacement | Bridge over Amtrak and Chandler Rd, 0.88 miles E. of SR 520 | Porter | 0 | STBG State | 2021 | CN | $ 3,756,771 | $ 3,005,417 | $ 751,354 | |
41 | 1296990 | INDOT | US 20 | District Bridge Project (Rehabilitation) | Bridge Deck Replacement | Bridge over Amtrak and Chandler Rd, 0.88 miles E. of SR 520 | Porter | 0 | STBG State | 2021 | PE | $ 165,000 | $ 132,000 | $ 33,000 | |
42 | 1296990 | INDOT | US 20 | District Bridge Project (Rehabilitation) | Bridge Deck Replacement | Bridge over Amtrak and Chandler Rd, 0.88 miles E. of SR 520 | Porter | 0 | STBG State | 2021 | PE | $ 250,000 | $ 200,000 | $ 50,000 |
Row ID | Des # | Sponsor | Route | Work Category | Work Type | Location | County | Des Length | Federal Fund Type | Year | Phase | Total Funds | Federal Funds | Non-Federal Funds | NE/ RS/ A#/ AM |
43 | 1298068 | INDOT | SR 2 | District Pavement Project (Non-I) | HMA Overlay, Functional | From 1.4 mi E of SR 4 (Burson) to US 20 | LaPorte | 6.80000019 | STBG State | 2018 | CN | $ 8,741,000 | $ 6,992,800 | $ 1,748,200 | |
44 | 1298125 | INDOT | US 20 | District Pavement Project (Non-I) | HMA Overlay, Functional | From SR 212 to SR 39 | LaPorte | 4.80100012 | STBG State | 2018 | CN | $ 5,333,000 | $ 4,266,400 | $ 1,066,600 | |
45 | 1298128 | INDOT | US 20 | District Pavement Project (Non-I) | HMA Overlay, Functional | From SR 39 to SR 2 | LaPorte | 7.74300003 | STBG State | 2018 | CN | $ 7,642,000 | $ 6,113,600 | $ 1,528,400 | |
46 | 1298302 | INDOT | SR 2 | District Intersection Improvement Project | Intersection Improvement, Roundabout | SR 2 at CR100S, 4.32 mi. W of US 30 | Porter | 0 | STBG State | 2018 | CN | $ 1,325,000 | $ 1,060,000 | $ 265,000 | |
47 | 1298309 | INDOT | US 41 | District Small Structure Project | Added Travel Lanes, Construct Turn Lanes | From 1.48 mi. S of US 30 (82nd Lane) to 0.83 mi. S of US 30 (77th Ave.) | Lake | 0.65799999 | NHPP Non Interstate | 2018 | CN | $ 2,700,000 | $ 2,160,000 | $ 540,000 | |
48 | 1298312 | INDOT | SR 2 | District Intersection Improvement Project | Other Intersection Improvement | SR 2 at CR 500W, 6.79 mi. W of US 30 | Porter | 0 | STBG State | 2018 | CN | $ 530,000 | $ 424,000 | $ 106,000 | |
49 | 1298313 | INDOT | US 20 | District Pavement Project (Non-I) | Intersect. Improv. W/ Added Turn Lanes | US 20 at CR 400W, 1.44 mi. E of US 35 | LaPorte | 0 | STBG State | 2018 | CN | $ 1,235,770 | $ 988,616 | $ 247,154 |
Row ID | Des # | Sponsor | Route | Work Category | Work Type | Location | County | Des Length | Federal Fund Type | Year | Phase | Total Funds | Federal Funds | Non-Federal Funds | NE/ RS/ A#/ AM |
50 | 1298316 | INDOT | US 6 | District Intersection Improvement Project | Intersect. Improv. W/ Added Turn Lanes | US 6 at Calumet Rd., 0.48 mi. E of SR 49 | Porter | 0 | STBG State | 2018 | CN | $ 646,859 | $ 517,487 | $ 129,372 | |
51 | 1298397 | INDOT | US 12 | District Bridge Project (Rehabilitation) | Bridge Thin Deck Overlay | Bridge over EJ&E RR, Conrail RR, and Carey St., 1.33 mi W of SR 912 | Lake | 0 | STBG State | 2018 | CN | $ 3,086,000 | $ 2,468,800 | $ 617,200 | |
52 | 1298398 | INDOT | US 12 | District Bridge Project (Replacement) | Bridge Replacement, Other Construction | Pedestrian walkway over US- 12, 0.83 mi W of SR 912 | Lake | 0 | STBG State | 2018 | RW | $ 50,000 | $ 40,000 | $ 10,000 | |
53 | 1298398 | INDOT | US 12 | District Bridge Project (Replacement) | Bridge Replacement, Other Construction | Pedestrian walkway over US- 12, 0.83 mi W of SR 912 | Lake | 0 | STBG State | 2018 | UT1 | $ 102,600 | $ 82,080 | $ 20,520 | |
54 | 1298398 | INDOT | US 12 | District Bridge Project (Replacement) | Bridge Replacement, Other Construction | Pedestrian walkway over US- 12, 0.83 mi W of SR 912 | Lake | 0 | STBG State | 2020 | CN | $ 1,139,868 | $ 911,894 | $ 227,974 | |
55 | 1298402 | INDOT | US 20 | District Bridge Project (Rehabilitation) | Bridge Deck Replacement | Bridge over CSX RR, 1.3 mi. W of SR 249 | Porter | 0 | STBG State | 2018 | CN | $ 3,257,000 | $ 2,605,600 | $ 651,400 | |
56 | 1298444 | INDOT | US 41 | District Bridge Project (Rehabilitation) | Bridge Deck Replacement | Bridge over Conrail RR and 236th Avenue, NBL, 4.54 mi. S of SR 2 | Lake | 0 | NHPP Non Interstate | 2018 | PE | $ 250,000 | $ 200,000 | $ 50,000 |
Row ID | Des # | Sponsor | Route | Work Category | Work Type | Location | County | Des Length | Federal Fund Type | Year | Phase | Total Funds | Federal Funds | Non-Federal Funds | NE/ RS/ A#/ AM |
57 | 1298444 | INDOT | US 41 | District Bridge Project (Rehabilitation) | Bridge Deck Replacement | Bridge over Conrail RR and 236th Avenue, NBL, 4.54 mi. S of SR 2 | Lake | 0 | NHPP Non Interstate | 2018 | CN | $ 1,755,000 | $ 1,404,000 | $ 351,000 | |
58 | 1298448 | INDOT | US 41 | District Bridge Project (Rehabilitation) | Bridge Deck Replacement | Bridge over Conrail RR and 236th Avenue, SBL, 4.54 mi. S of SR 2 | Lake | 0 | NHPP Non Interstate | 2018 | CN | $ 1,350,000 | $ 1,080,000 | $ 270,000 | |
59 | 1298541 | INDOT | SR 912 | District Bridge Project (Rehabilitation) | Bridge Deck Replacement | Bridge over Guthrie St., 0.32 mi. W of US 12 | Lake | 0 | NHPP Non Interstate | 2018 | CN | $ 1,887,000 | $ 1,509,600 | $ 377,400 | |
60 | 1298543 | INDOT | SR 912 | District Bridge Project (Rehabilitation) | Replace Superstructure | Bridge over US 12/Industrial Highway | Lake | 0 | NHPP Non Interstate | 2018 | CN | $ 1,728,000 | $ 1,382,400 | $ 345,600 | |
61 | 1298544 | INDOT | SR 912 | District Bridge Project (Rehabilitation) | Replace Superstructure | SR-912 ramp SSE over SR-912 and US-12 WB ramp | Lake | 0 | NHPP Non Interstate | 2018 | CN | $ 2,884,000 | $ 2,307,200 | $ 576,800 | |
62 | 1298548 | INDOT | I 80 | District Bridge Project (Rehabilitation) | Bridge Deck Overlay | Georgia St bridge over I-80 | Lake | 0 | NHPP Interstate | 2018 | CN | $ 1,264,000 | $ 1,137,600 | $ 126,400 | |
63 | 1298548 | INDOT | I 80 | District Bridge Project (Rehabilitation) | Bridge Deck Overlay | Georgia St bridge over I-80 | Lake | 0 | NHPP Interstate | 2018 | PE | $ 158,000 | $ 142,200 | $ 15,800 |
Row ID | Des # | Sponsor | Route | Work Category | Work Type | Location | County | Des Length | Federal Fund Type | Year | Phase | Total Funds | Federal Funds | Non-Federal Funds | NE/ RS/ A#/ AM |
64 | 1298562 | INDOT | US 35 | District Pavement Project (Non-I) | Small Structure Maint and Repair | 0.61 mi. S of US- 20 (35-46-204.30) | LaPorte | 0 | STBG State | 2018 | CN | $ 266,335 | $ 213,068 | $ 53,267 | |
65 | 1298566 | INDOT | SR 55 | District Small Structure Project | Small Structure Maint and Repair | 1.03 mi. S of US- 231 | Lake | 0 | STBG State | 2018 | CN | $ 510,000 | $ 408,000 | $ 102,000 | |
66 | 1298567 | INDOT | I 65 | District Small Structure Project | Small Structure Pipe Lining | Small structure over Little Calumet River, 0.17 mi N of I- 80/94 | Lake | 0 | NHPP Interstate | 2018 | CN | $ 570,000 | $ 513,000 | $ 57,000 | |
67 | 1298621 | INDOT | US 30 | District Small Structure Project | Small Structure Maint and Repair | 0.02 mi. E of SR- 53 | Lake | 0 | NHPP Non Interstate | 2018 | CN | $ 660,000 | $ 528,000 | $ 132,000 | |
68 | 1383250 | INDOT | US 12 | District Pavement Project (Non-I) | HMA Overlay, Functional | 1.56 mi E. of US 41 (Schrage Ave) to US 12 & US 20 Jct (Columbus Dr) | Lake | 3.24600005 | NHPP Non Interstate | 2018 | PE | $ 10,000 | $ 8,000 | $ 2,000 | |
69 | 1383250 | INDOT | US 12 | District Pavement Project (Non-I) | HMA Overlay, Functional | 1.56 mi E. of US 41 (Schrage Ave) to US 12 & US 20 Jct (Columbus Dr) | Lake | 3.24600005 | NHPP Non Interstate | 2018 | CN | $ 2,120,000 | $ 1,696,000 | $ 424,000 | |
70 | 1383250 | INDOT | US 12 | District Pavement Project (Non-I) | HMA Overlay, Functional | 1.56 mi E. of US 41 (Schrage Ave) to US 12 & US 20 Jct (Columbus Dr) | Lake | 3.24600005 | NHPP Non Interstate | 2018 | PE | $ 180,000 | $ 144,000 | $ 36,000 |
Row ID | Des # | Sponsor | Route | Work Category | Work Type | Location | County | Des Length | Federal Fund Type | Year | Phase | Total Funds | Federal Funds | Non-Federal Funds | NE/ RS/ A#/ AM |
71 | 1383583 | INDOT | SR 49 | District Pavement Project (Non-I) | HMA Overlay, Functional | From SR 8 to US 30 | Porter | 8.7510004 | STBG State | 2019 | PE | $ 450,000 | $ 360,000 | $ 90,000 | |
72 | 1383583 | INDOT | SR 49 | District Pavement Project (Non-I) | HMA Overlay, Functional | From SR 8 to US 30 | Porter | 8.7510004 | STBG State | 2019 | CN | $ 5,537,477 | $ 4,429,982 | $ 1,107,495 | |
73 | 1383614 | INDOT | US 20 | New Interchange Project | New Interchange Construction | at SR 2 | LaPorte | 0 | STBG State | 2019 | CN | $ 11,748,000 | $ 9,398,400 | $ 2,349,600 | |
74 | 1383615 | INDOT | SR 55 | Intersection Improvement Project | Intersection Improvement, Roundabout | Intersection of SR 55 and 73rd Ave., 1.0 mi N of US 30 | Lake | 0 | NHPP Non Interstate | 2019 | RW | $ 500,000 | $ 400,000 | $ 100,000 | |
75 | 1383615 | INDOT | SR 55 | Intersection Improvement Project | Intersection Improvement, Roundabout | Intersection of SR 55 and 73rd Ave., 1.0 mi N of US 30 | Lake | 0 | NHPP Non Interstate | 2019 | UT2 | $ 120,000 | $ 96,000 | $ 24,000 | |
76 | 1383615 | INDOT | SR 55 | Intersection Improvement Project | Intersection Improvement, Roundabout | Intersection of SR 55 and 73rd Ave., 1.0 mi N of US 30 | Lake | 0 | NHPP Non Interstate | 2020 | CN | $ 1,996,000 | $ 1,596,800 | $ 399,200 | |
77 | 1383615 | INDOT | SR 55 | Intersection Improvement Project | Intersection Improvement, Roundabout | Intersection of SR 55 and 73rd Ave., 1.0 mi N of US 30 | Lake | 0 | NHPP Non Interstate | 2020 | CE | $ 170,000 | $ 136,000 | $ 34,000 |
Row ID | Des # | Sponsor | Route | Work Category | Work Type | Location | County | Des Length | Federal Fund Type | Year | Phase | Total Funds | Federal Funds | Non-Federal Funds | NE/ RS/ A#/ AM |
78 | 1383631 | INDOT | US 6 | Intersection Improvement Project | Intersection Improvement, Roundabout | Intersection of US 6 and SR 2 | LaPorte | 0 | NHPP Non Interstate | 2018 | PE | $ 5,000 | $ 4,000 | $ 1,000 | |
79 | 1383631 | INDOT | US 6 | Intersection Improvement Project | Intersection Improvement, Roundabout | Intersection of US 6 and SR 2 | LaPorte | 0 | NHPP Non Interstate | 2018 | UT1 | $ 5,000 | $ 4,000 | $ 1,000 | |
80 | 1383631 | INDOT | US 6 | Intersection Improvement Project | Intersection Improvement, Roundabout | Intersection of US 6 and SR 2 | LaPorte | 0 | NHPP Non Interstate | 2019 | CN | $ 1,269,000 | $ 1,015,200 | $ 253,800 | |
81 | 1383631 | INDOT | US 6 | Intersection Improvement Project | Intersection Improvement, Roundabout | Intersection of US 6 and SR 2 | LaPorte | 0 | NHPP Non Interstate | 2019 | RW | $ 80,000 | $ 64,000 | $ 16,000 | |
82 | 1383631 | INDOT | US 6 | Intersection Improvement Project | Intersection Improvement, Roundabout | Intersection of US 6 and SR 2 | LaPorte | 0 | NHPP Non Interstate | 2019 | UT2 | $ 35,000 | $ 28,000 | $ 7,000 | |
83 | 1383631 | INDOT | US 6 | Intersection Improvement Project | Intersection Improvement, Roundabout | Intersection of US 6 and SR 2 | LaPorte | 0 | NHPP Non Interstate | 2020 | CE | $ 54,000 | $ 43,200 | $ 10,800 | |
84 | 1383633 | INDOT | SR 2 | Intersection Improvement Project | Other Intersection Improvement | at Hayes- Leonard | Porter | 0 | NHPP Non Interstate | 2019 | CN | $ 1,234,000 | $ 987,200 | $ 246,800 |
Row ID | Des # | Sponsor | Route | Work Category | Work Type | Location | County | Des Length | Federal Fund Type | Year | Phase | Total Funds | Federal Funds | Non-Federal Funds | NE/ RS/ A#/ AM |
85 | 1383635 | INDOT | SR 2 | Intersection Improvement Project | Intersect. Improv. W/ Added Turn Lanes | Intersection of SR 2 at Horse Prairie Ave, 0.25 mi W of US 30 | Porter | 0 | NHPP Non Interstate | 2018 | PE | $ 10,000 | $ 8,000 | $ 2,000 | |
86 | 1383635 | INDOT | SR 2 | Intersection Improvement Project | Intersect. Improv. W/ Added Turn Lanes | Intersection of SR 2 at Horse Prairie Ave, 0.25 mi W of US 30 | Porter | 0 | NHPP Non Interstate | 2018 | UT1 | $ 10,000 | $ 8,000 | $ 2,000 | |
87 | 1383635 | INDOT | SR 2 | Intersection Improvement Project | Intersect. Improv. W/ Added Turn Lanes | Intersection of SR 2 at Horse Prairie Ave, 0.25 mi W of US 30 | Porter | 0 | NHPP Non Interstate | 2019 | RW | $ 240,000 | $ 192,000 | $ 48,000 | |
88 | 1383635 | INDOT | SR 2 | Intersection Improvement Project | Intersect. Improv. W/ Added Turn Lanes | Intersection of SR 2 at Horse Prairie Ave, 0.25 mi W of US 30 | Porter | 0 | NHPP Non Interstate | 2019 | UT2 | $ 90,000 | $ 72,000 | $ 18,000 | |
89 | 1383635 | INDOT | SR 2 | Intersection Improvement Project | Intersect. Improv. W/ Added Turn Lanes | Intersection of SR 2 at Horse Prairie Ave, 0.25 mi W of US 30 | Porter | 0 | NHPP Non Interstate | 2020 | PE | $ 42,000 | $ 33,600 | $ 8,400 | |
90 | 1383635 | INDOT | SR 2 | Intersection Improvement Project | Intersect. Improv. W/ Added Turn Lanes | Intersection of SR 2 at Horse Prairie Ave, 0.25 mi W of US 30 | Porter | 0 | NHPP Non Interstate | 2020 | CN | $ 1,057,000 | $ 845,600 | $ 211,400 | |
91 | 1383635 | INDOT | SR 2 | Intersection Improvement Project | Intersect. Improv. W/ Added Turn Lanes | Intersection of SR 2 at Horse Prairie Ave, 0.25 mi W of US 30 | Porter | 0 | NHPP Non Interstate | 2020 | CE | $ 42,000 | $ 33,600 | $ 8,400 |
Row ID | Des # | Sponsor | Route | Work Category | Work Type | Location | County | Des Length | Federal Fund Type | Year | Phase | Total Funds | Federal Funds | Non-Federal Funds | NE/ RS/ A#/ AM |
92 | 1383695 | INDOT | US 41 | District Pavement Project (Non-I) | Auxiliary Lanes, Two-way Left Turn Lanes | From US 231 to 1.99 mi. N of US 231 (93rd Avenue) | Lake | 1.99800003 | NHPP Non Interstate | 2019 | CN | $ 4,989,000 | $ 3,991,200 | $ 997,800 | |
93 | 1383706 | INDOT | SR 8 | District Bridge Project (Replacement) | Bridge Replacement, Steel | Bridge Over Hanna Arm, 2.01 mi W of SR 39 | LaPorte | 0 | STBG State | 2018 | PE | $ 77,000 | $ 61,600 | $ 15,400 | |
94 | 1383706 | INDOT | SR 8 | District Bridge Project (Replacement) | Bridge Replacement, Steel | Bridge Over Hanna Arm, 2.01 mi W of SR 39 | LaPorte | 0 | STBG State | 2018 | RW | $ 30,000 | $ 24,000 | $ 6,000 | |
95 | 1383706 | INDOT | SR 8 | District Bridge Project (Replacement) | Bridge Replacement, Steel | Bridge Over Hanna Arm, 2.01 mi W of SR 39 | LaPorte | 0 | STBG State | 2018 | CN | $ 684,207 | $ 547,366 | $ 136,841 | |
96 | 1383711 | INDOT | US 41 | District Bridge Project (Rehabilitation) | Bridge Deck Overlay | 01.20 N US-30 | Lake | 0 | NHPP Non Interstate | 2019 | CN | $ 2,875,000 | $ 2,300,000 | $ 575,000 | |
97 | 1383718 | INDOT | I 94 | District Small Structure Project | Small Structure Pipe Lining | 3.21 mi E of US 421 | LaPorte | 0 | NHPP Interstate | 2019 | CN | $ 345,000 | $ 310,500 | $ 34,500 | |
98 | 1383719 | INDOT | US 30 | District Small Structure Project | Small Structure Maint and Repair | Box Culvert near CR 325 E - WB | Porter | 0 | NHPP Non Interstate | 2019 | CN | $ 117,000 | $ 93,600 | $ 23,400 |
Row ID | Des # | Sponsor | Route | Work Category | Work Type | Location | County | Des Length | Federal Fund Type | Year | Phase | Total Funds | Federal Funds | Non-Federal Funds | NE/ RS/ A#/ AM |
99 | 1383725 | INDOT | US 6 | Intersection Improvement Project | HMA Overlay, Functional | From SR 51 to 0.51 mi E of SR 51 (Union St) | Lake | 0.51499999 | NHPP Non Interstate | 2018 | PE | $ 50,000 | $ 40,000 | $ 10,000 | |
100 | 1383725 | INDOT | US 6 | Intersection Improvement Project | HMA Overlay, Functional | From SR 51 to 0.51 mi E of SR 51 (Union St) | Lake | 0.51499999 | NHPP Non Interstate | 2020 | CN | $ 587,898 | $ 470,318 | $ 117,580 | |
101 | 1400116 | INDOT | US 35 | Intersection Improvement Project | HMA Overlay, Functional | Boyd to SR 2 | LaPorte | 2.51999998 | STBG State | 2020 | CN | $ 2,706,347 | $ 2,165,078 | $ 541,269 | |
102 | 1400204 | INDOT | US 12 | District Bridge Project (Rehabilitation) | Bridge Deck Replacement | 0.51 mi. W of US 20 (Lift Bridge) | Lake | 0 | NHPP Non Interstate | 2019 | PE | $ 69,600 | $ 55,680 | $ 13,920 | |
103 | 1400204 | INDOT | US 12 | District Bridge Project (Rehabilitation) | Bridge Deck Replacement | 0.51 mi. W of US 20 (Lift Bridge) | Lake | 0 | NHPP Non Interstate | 2019 | CN | $ 464,000 | $ 371,200 | $ 92,800 | |
104 | 1400287 | INDOT | SR 149 | District Bridge Project (Rehabilitation) | Small Structure Pipe Lining | 1.64 mi S of jct US 20 | Porter | 0 | NHPP Non Interstate | 2018 | CN | $ 112,901 | $ 90,321 | $ 22,580 | |
105 | 1401586 | INDOT | US 35 | District Bridge Project (Rehabilitation) | Bridge Deck Sealing | 2.45 mi S of US 6 over the Kankakee River | LaPorte | 0 | STBG State | 2018 | CN | $ 16,203 | $ 12,962 | $ 3,241 |
Row ID | Des # | Sponsor | Route | Work Category | Work Type | Location | County | Des Length | Federal Fund Type | Year | Phase | Total Funds | Federal Funds | Non-Federal Funds | NE/ RS/ A#/ AM |
106 | 1500081 | INDOT | US 41 | District Bridge Project (Rehabilitation) | Bridge Replacement, Other Construction | Over GTW RR, 2.80 mi N of US-30 | Lake | 0 | NHPP Non Interstate | 2018 | RW | $ 100,000 | $ 80,000 | $ 20,000 | |
107 | 1500081 | INDOT | US 41 | District Bridge Project (Rehabilitation) | Bridge Replacement, Other Construction | Over GTW RR, 2.80 mi N of US-30 | Lake | 0 | NHPP Non Interstate | 2018 | CN | $ 5,275,842 | $ 4,220,674 | $ 1,055,168 | |
108 | 1500081 | INDOT | US 41 | District Bridge Project (Rehabilitation) | Bridge Replacement, Other Construction | Over GTW RR, 2.80 mi N of US-30 | Lake | 0 | NHPP Non Interstate | 2018 | PE | $ 575,000 | $ 460,000 | $ 115,000 | |
109 | 1500090 | INDOT | US 12 | District Pavement Project (Non-I) | Intersect. Improv. W/ Added Turn Lanes | US 12(Columbus Dr) with Railroad Ave & McShane Ave 0.25mi E of US 20 (Indy Blvd) | Lake | 0.056 | NHPP Non Interstate | 2018 | PE | $ 123,000 | $ 98,400 | $ 24,600 | |
110 | 1500090 | INDOT | US 12 | District Pavement Project (Non-I) | Intersect. Improv. W/ Added Turn Lanes | US 12(Columbus Dr) with Railroad Ave & McShane Ave 0.25mi E of US 20 (Indy Blvd) | Lake | 0.056 | NHPP Non Interstate | 2018 | RW | $ 200,000 | $ 160,000 | $ 40,000 | |
111 | 1500090 | INDOT | US 12 | District Pavement Project (Non-I) | Intersect. Improv. W/ Added Turn Lanes | US 12(Columbus Dr) with Railroad Ave & McShane Ave 0.25mi E of US 20 (Indy Blvd) | Lake | 0.056 | NHPP Non Interstate | 2018 | CN | $ 1,543,000 | $ 1,234,400 | $ 308,600 | |
112 | 1500091 | INDOT | SR 55 | Intersection Improvement Project | Intersect. Improv. W/ Added Turn Lanes | Intersection of SR 55 at 57th Ave, 3.0 mi N of US 30 | Lake | 0.109 | NHPP Non Interstate | 2019 | RW | $ 100,000 | $ 80,000 | $ 20,000 |
Row ID | Des # | Sponsor | Route | Work Category | Work Type | Location | County | Des Length | Federal Fund Type | Year | Phase | Total Funds | Federal Funds | Non-Federal Funds | NE/ RS/ A#/ AM |
113 | 1500091 | INDOT | SR 55 | Intersection Improvement Project | Intersect. Improv. W/ Added Turn Lanes | Intersection of SR 55 at 57th Ave, 3.0 mi N of US 30 | Lake | 0.109 | NHPP Non Interstate | 2019 | UT2 | $ 100,000 | $ 80,000 | $ 20,000 | |
114 | 1500091 | INDOT | SR 55 | Intersection Improvement Project | Intersect. Improv. W/ Added Turn Lanes | Intersection of SR 55 at 57th Ave, 3.0 mi N of US 30 | Lake | 0.109 | NHPP Non Interstate | 2020 | CE | $ 64,000 | $ 51,200 | $ 12,800 | |
115 | 1500091 | INDOT | SR 55 | Intersection Improvement Project | Intersect. Improv. W/ Added Turn Lanes | Intersection of SR 55 at 57th Ave, 3.0 mi N of US 30 | Lake | 0.109 | NHPP Non Interstate | 2020 | CN | $ 593,000 | $ 474,400 | $ 118,600 | |
116 | 1500170 | INDOT | IR 1001 | Railroad Grade Crossing Project | Railroad Protection | CR 200S at CN RR DOT# 283306K near Mill Creek | LaPorte | 0 | Sec 130 | 2018 | CN | $ 320,000 | $ 320,000 | $ - | |
117 | 1500171 | INDOT | IR 1001 | Railroad Grade Crossing Project | Railroad Protection | Froberg Rd/150W at CN RR DOT# 283242B W of Valparaiso | Porter | 0 | Sec 130 | 2018 | CN | $ 320,000 | $ 320,000 | $ - | |
118 | 1500590 | INDOT | US 41 | District Bridge Project (Rehabilitation) | Bridge Painting | Bridge over Conrail RR & 236th Ave, NBL, 4.54 mi S of SR 2 | Lake | 0 | NHPP Non Interstate | 2018 | PE | $ 13,000 | $ 10,400 | $ 2,600 | |
119 | 1500590 | INDOT | US 41 | District Bridge Project (Rehabilitation) | Bridge Painting | Bridge over Conrail RR & 236th Ave, NBL, 4.54 mi S of SR 2 | Lake | 0 | NHPP Non Interstate | 2018 | CN | $ 110,028 | $ 88,022 | $ 22,006 |
Row ID | Des # | Sponsor | Route | Work Category | Work Type | Location | County | Des Length | Federal Fund Type | Year | Phase | Total Funds | Federal Funds | Non-Federal Funds | NE/ RS/ A#/ AM |
120 | 1500602 | INDOT | US 41 | District Bridge Project (Rehabilitation) | Bridge Painting | Bridge over Conrail RR & 236th Ave, SBL, 4.54mi S of SR 2 | Lake | 0 | NHPP Non Interstate | 2018 | CN | $ 110,028 | $ 88,022 | $ 22,006 | |
121 | 1500602 | INDOT | US 41 | District Bridge Project (Rehabilitation) | Bridge Painting | Bridge over Conrail RR & 236th Ave, SBL, 4.54mi S of SR 2 | Lake | 0 | NHPP Non Interstate | 2018 | PE | $ 13,000 | $ 10,400 | $ 2,600 | |
122 | 1500674 | INDOT | I 80 | District Bridge Project (Rehabilitation) | Bridge Deck Overlay | I-80 WB Ramp NS RR and EJ&E RR, 0.50mi E of SR 912 | Lake | 0 | NHPP Interstate | 2021 | PE | $ 157,000 | $ 141,300 | $ 15,700 | |
123 | 1500674 | INDOT | I 80 | District Bridge Project (Rehabilitation) | Bridge Deck Overlay | I-80 WB Ramp NS RR and EJ&E RR, 0.50mi E of SR 912 | Lake | 0 | NHPP Interstate | 2021 | CN | $ 1,993,376 | $ 1,794,038 | $ 199,338 | |
124 | 1500674 | INDOT | I 80 | District Bridge Project (Rehabilitation) | Bridge Deck Overlay | I-80 WB Ramp NS RR and EJ&E RR, 0.50mi E of SR 912 | Lake | 0 | NHPP Interstate | 20201 | PE | $ 75,000 | $ 67,500 | $ 7,500 | |
125 | 1500689 | INDOT | SR 249 | District Pavement Project (Non-I) | HMA Overlay, Preventive Maintenance | From US 20 to US 12 | Porter | 1.90400004 | NHPP Non Interstate | 2018 | CN | $ 1,065,000 | $ 852,000 | $ 213,000 | |
126 | 1592854 | INDOT | US 41 | District Pavement Project (Non-I) | HMA Overlay, Preventive Maintenance | From I-80/94 to 0.77mi S of I-90 (Huehn St) | Lake | 0.001 | NHPP Non Interstate | 2018 | PE | $ 70,000 | $ 56,000 | $ 14,000 |
Row ID | Des # | Sponsor | Route | Work Category | Work Type | Location | County | Des Length | Federal Fund Type | Year | Phase | Total Funds | Federal Funds | Non-Federal Funds | NE/ RS/ A#/ AM |
127 | 1592854 | INDOT | US 41 | District Pavement Project (Non-I) | HMA Overlay, Preventive Maintenance | From I-80/94 to 0.77mi S of I-90 (Huehn St) | Lake | 0.001 | NHPP Non Interstate | 2018 | PE | $ 275,000 | $ 220,000 | $ 55,000 | |
128 | 1592854 | INDOT | US 41 | District Pavement Project (Non-I) | HMA Overlay, Preventive Maintenance | From I-80/94 to 0.77mi S of I-90 (Huehn St) | Lake | 0.001 | NHPP Non Interstate | 2018 | CN | $ 2,782,000 | $ 2,225,600 | $ 556,400 | |
129 | 1592857 | INDOT | SR 49 | District Pavement Project (Non-I) | HMA Overlay, Functional | From 1.14mi S of SR 8 to SR 8 | Porter | 1.16799998 | STBG State | 2018 | CN | $ 412,419 | $ 329,935 | $ 82,484 | |
130 | 1592857 | INDOT | SR 49 | District Pavement Project (Non-I) | HMA Overlay, Functional | From 1.14mi S of SR 8 to SR 8 | Porter | 1.16799998 | STBG State | 2018 | PE | $ 58,000 | $ 46,400 | $ 11,600 | |
131 | 1592873 | INDOT | SR 912 | District Bridge Project (Rehabilitation) | Scour Protection (Erosion) | .22mi E of I-80. Little Calumet River | Lake | 0 | NHPP Non Interstate | 2018 | CN | $ 159,414 | $ 127,531 | $ 31,883 | |
132 | 1592873 | INDOT | SR 912 | District Bridge Project (Rehabilitation) | Scour Protection (Erosion) | .22mi E of I-80. Little Calumet River | Lake | 0 | NHPP Non Interstate | 2018 | PE | $ 22,500 | $ 18,000 | $ 4,500 | |
133 | 1593079 | INDOT | I 80 | District Bridge Project (Rehabilitation) | Bridge Deck Sealing | 1.18mi E of SR 53 | Lake | 0 | NHPP Interstate | 2018 | PE | $ 28,523 | $ 25,671 | $ 2,852 |
Row ID | Des # | Sponsor | Route | Work Category | Work Type | Location | County | Des Length | Federal Fund Type | Year | Phase | Total Funds | Federal Funds | Non-Federal Funds | NE/ RS/ A#/ AM |
134 | 1593079 | INDOT | I 80 | District Bridge Project (Rehabilitation) | Bridge Deck Sealing | 1.18mi E of SR 53 | Lake | 0 | NHPP Interstate | 2020 | CN | $ 388,942 | $ 350,048 | $ 38,894 | |
135 | 1593079 | INDOT | I 80 | District Bridge Project (Rehabilitation) | Bridge Deck Sealing | 1.18mi E of SR 53 | Lake | 0 | NHPP Interstate | 2020 | CE | $ 29,712 | $ 26,741 | $ 2,971 | |
136 | 1593213 | INDOT | I 65 | District Bridge Project (Rehabilitation) | Bridge Deck Overlay | 73rd over I-65, 0.94mi N of US 30 | Lake | 0 | NHPP Interstate | 2018 | PE | $ 157,000 | $ 141,300 | $ 15,700 | |
137 | 1593213 | INDOT | I 65 | District Bridge Project (Rehabilitation) | Bridge Deck Overlay | 73rd over I-65, 0.94mi N of US 30 | Lake | 0 | NHPP Interstate | 2020 | CN | $ 886,906 | $ 798,215 | $ 88,691 | |
138 | 1593213 | INDOT | I 65 | District Bridge Project (Rehabilitation) | Bridge Deck Overlay | 73rd over I-65, 0.94mi N of US 30 | Lake | 0 | NHPP Interstate | 2020 | CE | $ 117,750 | $ 103,620 | $ 14,130 | |
139 | 1593219 | INDOT | I 80 | District Bridge Project (Rehabilitation) | Bridge Deck Overlay | SR 912 EB Ramp to I-80 at N&S RR | Lake | 0 | NHPP Interstate | 2018 | PE | $ 82,380 | $ 74,142 | $ 8,238 | |
140 | 1593219 | INDOT | I 80 | District Bridge Project (Rehabilitation) | Bridge Deck Overlay | SR 912 EB Ramp to I-80 at N&S RR | Lake | 0 | NHPP Interstate | 2020 | CN | $ 949,232 | $ 854,309 | $ 94,923 |
Row ID | Des # | Sponsor | Route | Work Category | Work Type | Location | County | Des Length | Federal Fund Type | Year | Phase | Total Funds | Federal Funds | Non-Federal Funds | NE/ RS/ A#/ AM |
141 | 1593219 | INDOT | I 80 | District Bridge Project (Rehabilitation) | Bridge Deck Overlay | SR 912 EB Ramp to I-80 at N&S RR | Lake | 0 | NHPP Interstate | 2020 | CE | $ 126,000 | $ 113,400 | $ 12,600 | |
142 | 1593246 | INDOT | I 94 | District Small Structure Project | Small Structure Pipe Lining | 0.94mi E of SR 51 | Lake | 0 | NHPP Interstate | 2019 | CN | $ 200,000 | $ 180,000 | $ 20,000 | |
143 | 1593246 | INDOT | I 94 | District Small Structure Project | Small Structure Pipe Lining | 0.94mi E of SR 51 | Lake | 0 | NHPP Interstate | 2019 | PE | $ 30,000 | $ 27,000 | $ 3,000 | |
144 | 1593247 | INDOT | I 94 | District Small Structure Project | Small Structure Pipe Lining | 2.66 mi E of US 421 | LaPorte | 0 | NHPP Interstate | 2019 | PE | $ 30,000 | $ 27,000 | $ 3,000 | |
145 | 1593247 | INDOT | I 94 | District Small Structure Project | Small Structure Pipe Lining | 2.66 mi E of US 421 | LaPorte | 0 | NHPP Interstate | 2019 | CN | $ 200,000 | $ 180,000 | $ 20,000 | |
146 | 1593248 | INDOT | I 94 | District Small Structure Project | Small Structure Pipe Lining | 4.56 mi E of US 421 | LaPorte | 0 | NHPP Interstate | 2019 | PE | $ 30,000 | $ 27,000 | $ 3,000 | |
147 | 1593248 | INDOT | I 94 | District Small Structure Project | Small Structure Pipe Lining | 4.56 mi E of US 421 | LaPorte | 0 | NHPP Interstate | 2019 | CN | $ 200,000 | $ 180,000 | $ 20,000 |
Row ID | Des # | Sponsor | Route | Work Category | Work Type | Location | County | Des Length | Federal Fund Type | Year | Phase | Total Funds | Federal Funds | Non-Federal Funds | NE/ RS/ A#/ AM |
148 | 1593265 | INDOT | US 421 | District Pavement Project (Non-I) | HMA Overlay, Preventive Maintenance | From SR 2 (N Jct) to 0.3mi S of I 94 (CR 300 N) | LaPorte | 6.37300014 | NHPP Non Interstate | 2019 | CN | $ 1,567,500 | $ 1,254,000 | $ 313,500 | |
149 | 1593265 | INDOT | US 421 | District Pavement Project (Non-I) | HMA Overlay, Preventive Maintenance | From SR 2 (N Jct) to 0.3mi S of I 94 (CR 300 N) | LaPorte | 6.37300014 | NHPP Non Interstate | 2019 | PE | $ 156,750 | $ 125,400 | $ 31,350 | |
150 | 1593278 | INDOT | SR 49 | District Bridge Project (Rehabilitation) | Bridge Deck Overlay | Over Cook Ditch, 4.01mi S of SR 8 | Porter | 0 | STBG State | 2019 | CN | $ 200,000 | $ 160,000 | $ 40,000 | |
151 | 1593278 | INDOT | SR 49 | District Bridge Project (Rehabilitation) | Bridge Deck Overlay | Over Cook Ditch, 4.01mi S of SR 8 | Porter | 0 | STBG State | 2019 | PE | $ 30,000 | $ 24,000 | $ 6,000 | |
152 | 1600012 | INDOT | I 65 |