Row ID | Des # | Sponsor | Route | Work Category | Work Type | Location | County | Des Length | Federal Fund Type | Year | Phase | Total Funds | Federal Funds | Non-Federal Funds | NE/ RS/ A#/ AM |
Public Transit Projects Chicago UZA | |||||||||||||||
1 | 1382963 | East Chicago | FTA | Replace 2-57 Passenger Vehicles | Replace 2-57 Passenger Vehicles | East Chicago | Lake | FTA Section 5339 | 2018 | Capital Equipment | $ 760,000 | $ 646,000 | $ 114,000 | ||
2 | 1382061 | East Chicago | FTA | Preventive Maint. | East Chicago | Lake | FTA 5307 Chicago UA | 2018 | Operating Subsidy | $ 271,330 | $ 217,064 | $ 54,266 | |||
3 | 1382062 | East Chicago | FTA | Comp. Paratransit | East Chicago | Lake | FTA 5307 Chicago UA | 2018 | Operating Subsidy | $ 287,500 | $ 229,999 | $ 57,501 | |||
4 | 1592133 | East Chicago | FTA | Operating Assistance | East Chicago | Lake | FTA 5307 Chicago UA | 2018 | Operating Subsidy | $ 168,272 | $ 84,136 | $ 84,136 | |||
5 | 1592022 | East Chicago | FTA | Replace Two Revenue Vehicles | Replace 2-57 passenger buses | East Chicago | Lake | FTA Section 5339 | 2018 | Capital Equipment | $ 760,000 | $ 646,000 | $ 114,000 | ||
6 | 1592020 | East Chicago | FTA | Operating Assistance | East Chicago | Lake | FTA 5307 Chicago UA | 2018 | Operating Subsidy | $ 236,368 | $ 118,184 | $ 118,184 |
Row ID | Des # | Sponsor | Route | Work Category | Work Type | Location | County | Des Length | Federal Fund Type | Year | Phase | Total Funds | Federal Funds | Non-Federal Funds | NE/ RS/ A#/ AM |
7 | 1592021 | East Chicago | FTA | Comp. Paratransit | East Chicago | Lake | FTA 5307 Chicago UA | 2018 | Operating Subsidy | $ 210,408 | $ 168,326 | $ 42,082 | |||
8 | 1592023 | East Chicago | FTA | Preventive Maint. | East Chicago | Lake | FTA 5307 Chicago UA | 2018 | Operating Subsidy | $ 271,330 | $ 217,064 | $ 54,266 | |||
9 | 1592082 | East Chicago | FTA | Replace One Non-revenue Vehicle | Purchase Service Truck | East Chicago | Lake | FTA 5307 Chicago UA | 2019 | Capital Equipment | $ 60,000 | $ 51,000 | $ 9,000 | ||
10 | 1592079 | East Chicago | FTA | Preventive Maint. | East Chicago | Lake | FTA 5307 Chicago UA | 2019 | Operating Subsidy | $ 271,330 | $ 217,064 | $ 54,266 | |||
11 | 1592080 | East Chicago | FTA | Comp. Paratransit | East Chicago | Lake | FTA 5307 Chicago UA | 2019 | Operating Subsidy | $ 210,408 | $ 168,326 | $ 42,082 | |||
12 | 1592081 | East Chicago | FTA | Operating Assistance | East Chicago | Lake | FTA 5307 Chicago UA | 2019 | Operating Subsidy | $ 236,368 | $ 118,184 | $ 118,184 | |||
13 | 1700715 | Gary PTC | FTA | Transit Operating Grants | Lake Ridge Pilot Service (Year #4) Extension of FFY 2012 Funded Project | Gary | Lake | FHWA CMAQ (Lake Porter) | 2018 | Operating Subsidy | $ 625,000 | $ 500,000 | $ 125,000 |
Row ID | Des # | Sponsor | Route | Work Category | Work Type | Location | County | Des Length | Federal Fund Type | Year | Phase | Total Funds | Federal Funds | Non-Federal Funds | NE/ RS/ A#/ AM |
14 | 1592134 | GPTC | FTA | Replace Maint. Equip. Part 1 | Replace Maint. Equip. Part 2 | Gary | Lake | FTA 5339 Chicago UA | 2018 | Capital Equipment | $ 573,750 | $ 459,000 | $ 114,750 | ||
15 | 1592135 | GPTC | FTA | Replace Maint. Facility Lighting | Replace Maint. Facility Lighting | Gary | Lake | FTA 5339 Chicago UA | 2018 | Capital Equipment | $ 75,000 | $ 60,000 | $ 15,000 | ||
16 | 1600632 | GPTC | FTA | Transit Operating Grants | Broadway BRT (Year 1 Part 2 of 3) | Gary | Lake | FHWA CMAQ (Lake Porter) | 2018 | Operating Subsidy | $ 74,549 | $ 59,639 | $ 14,910 | ||
17 | 1600632 | GPTC | FTA | Transit Operating Grants | Broadway BRT (Year 1 Part 3 of 3) | Gary | Lake | FHWA CMAQ (Lake Porter) | 2018 | Operating Subsidy | $ 916,900 | $ 733,520 | $ 183,380 | ||
18 | 1382986 | GPTC | FTA | Preventive Maint. | Gary | Lake | FTA 5307 Chicago UA | 2018 | Operating Subsidy | $ 4,507,185 | $ 3,605,748 | $ 901,437 | |||
19 | 1382987 | GPTC | FTA | Comp. Paratransit | Gary | Lake | FTA 5307 Chicago UA | 2018 | Operating Subsidy | $ 866,553 | $ 693,242 | $ 173,311 | |||
20 | 1382988 | GPTC | FTA | FY 2017 Operating Assistance | Gary | Lake | FTA 5307 Chicago UA | 2018 | Operating Subsidy | $ 1,277,294 | $ 638,647 | $ 638,647 |
Row ID | Des # | Sponsor | Route | Work Category | Work Type | Location | County | Des Length | Federal Fund Type | Year | Phase | Total Funds | Federal Funds | Non-Federal Funds | NE/ RS/ A#/ AM |
21 | 1382989 | GPTC | FTA | Service Planning | Gary | Lake | FTA 5339 Chicago UA | 2018 | PL | $ 100,000 | $ 80,000 | $ 20,000 | |||
22 | 1592028 | GPTC | FTA | Fare Payment Kiosks | Gary | Lake | FTA 5307 Chicago UA | 2018 | Capital Equipment | $ 135,000 | $ 108,000 | $ 27,000 | |||
23 | 1529029 | GPTC | FTA | Driver Training Infrastr. | Training Course and Simulator | Gary | Lake | FTA 5307 Chicago UA | 2018 | Capital Equipment | $ 245,000 | $ 196,000 | $ 49,000 | ||
24 | 1592030 | GPTC | FTA | Training Hardware and Software | Admin. and Human Capital Improvs. | Gary | Lake | FTA 5307 Chicago UA | 2018 | Capital Equipment | $ 2,000 | $ 1,600 | $ 400 | ||
25 | 1592031 | GPTC | FTA | Associated Transit | System-Wide Station Improvs. | Gary | Lake | FTA 5307 Chicago UA | 2018 | Capital Equipment | $ 62,500 | $ 50,000 | $ 12,500 | ||
26 | 1592032 | GPTC | FTA | Fleet Managt. Software | Gary | Lake | FTA 5307 Chicago UA | 2018 | Capital Equipment | $ 75,000 | $ 60,000 | $ 15,000 | |||
27 | 1593038 | GPTC | FTA | Replace Maint. Equip. Part 1 | Heating and Exhaust System Repairs, Replace Hoists and Floor Drains | Gary | Lake | FTA 5307 Chicago UA | 2018 | Capital Equipment | $ 126,250 | $ 101,000 | $ 25,250 |
Row ID | Des # | Sponsor | Route | Work Category | Work Type | Location | County | Des Length | Federal Fund Type | Year | Phase | Total Funds | Federal Funds | Non-Federal Funds | NE/ RS/ A#/ AM |
28 | 1592075 | GPTC | FTA | Replace One revenue Vehicle | Replace 1 35' Vehicle No. 9706 | Gary | Lake | FTA 5339 Chicago UA | 2018 | Capital Equipment | $ 1,200,000 | $ 1,020,000 | $ 180,000 | ||
29 | 1592076 | GPTC | FTA | Replace Six Revenue Vehicles | Replace 6 Accessible Vans for Comp. Paratransit Service | Gary | Lake | FTA 5339 Chicago UA | 2018 | Capital Equipment | $ 540,000 | $ 459,000 | $ 81,000 | ||
30 | 1382970 | GPTC | FTA | Automatic Passenger Counters | Moved from FY 2014 | Gary | Lake | FTA 5339 Chicago UA | 2018 | Capital Equipment | $ 200,000 | $ 160,000 | $ 40,000 | ||
31 | 1592039 | GPTC | FTA | Replace Three Revenue Vehicles | Replace #7001- 7003 | Gary | Lake | FTA Chicago UA | 2018 | Capital Equipment | $ 1,200,000 | $ 1,020,000 | $ 180,000 | ||
32 | 1592024 | GPTC | FTA | Preventive Maint. | Gary | Lake | FTA 5307 Chicago UA | 2018 | Operating Subsidy | $ 4,507,185 | $ 3,605,748 | $ 901,437 | |||
33 | 1592019 | GPTC | FTA | Comp. Paratransit | Gary | Lake | FTA 5307 Chicago UA | 2018 | Operating Subsidy | $ 801,250 | $ 641,000 | $ 160,250 | |||
34 | 1592027 | GPTC | FTA | JARC Service | Gary | Lake | FTA 5307 Chicago UA | 2018 | Operating Subsidy | $ 1,451,246 | $ 725,623 | $ 725,623 |
Row ID | Des # | Sponsor | Route | Work Category | Work Type | Location | County | Des Length | Federal Fund Type | Year | Phase | Total Funds | Federal Funds | Non-Federal Funds | NE/ RS/ A#/ AM |
35 | 1592025 | GPTC | FTA | FY 2018 Operating Assistance | Gary | Lake | FTA 5307 Chicago UZA | 2018 | Operating Subsidy | $ 1,277,294 | $ 638,647 | $ 638,647 | |||
36 | 1592026 | GPTC | FTA | Service Planning | Gary | Lake | FTA 5307 Chicago UZA | 2018 | PL | $ 100,000 | $ 80,000 | $ 20,000 | |||
37 | 1592088 | GPTC | FTA | Associated Transit | System-Wide Station Improvs. | Gary | Lake | FTA 5307 Chicago UA | 2019 | Capital Equipment | $ 62,500 | $ 50,000 | $ 12,500 | ||
38 | 1592089 | GPTC | FTA | ADA Call Tracking Software | Gary | Lake | FTA 5307 Chicago UA | 2019 | Capital Equipment | $ 35,000 | $ 28,000 | $ 7,000 | |||
39 | 1592090 | GPTC | FTA | Replace Revenue Vehicles | Replace #7004- 7006 | Gary | Lake | FTA Chicago UA | 2019 | Capital Equipment | $ 1,200,000 | $ 1,020,000 | $ 180,000 | ||
40 | 1592083 | GPTC | FTA | Preventive Maint. | Gary | Lake | FTA 5307 Chicago UA | 2019 | Operating Subsidy | $ 4,507,185 | $ 3,605,748 | $ 901,437 | |||
41 | 1592085 | GPTC | FTA | FY 2019 ADA Comp. Paratransit | Gary | Lake | FTA 5307 Chicago UA | 2019 | Operating Subsidy | $ 801,250 | $ 641,000 | $ 160,250 |
Row ID | Des # | Sponsor | Route | Work Category | Work Type | Location | County | Des Length | Federal Fund Type | Year | Phase | Total Funds | Federal Funds | Non-Federal Funds | NE/ RS/ A#/ AM |
42 | 1592087 | GPTC | FTA | JARC Service | Gary | Lake | FTA 5307 Chicago UA | 2019 | Operating Subsidy | $ 1,451,246 | $ 725,623 | $ 725,623 | |||
43 | 1592084 | GPTC | FTA | FY 2019 Operating Assistance | Gary | Lake | FTA 5307 Chicago UZA | 2019 | Operating Subsidy | $ 1,277,294 | $ 638,647 | $ 638,647 | |||
44 | 1592086 | GPTC | FTA | Service Planning | Gary | Lake | FTA 5307 Chicago UZA | 2019 | PL | $ 100,000 | $ 80,000 | $ 20,000 | |||
45 | 1700535 | NICTD | FTA | Local Transit Projects | Mid-Life - 2000 Cars | Multiple | SOGR | 2018 | Capital Equipment | $ 500,000 | $ 400,000 | $ 100,000 | |||
46 | 1700536 | NICTD | FTA | Local Transit Projects | End of Life - 1982 Cars | Multiple | SOGR | 2018 | Capital Equipment | $ 1,017,500 | $ 814,000 | $ 203,500 | |||
47 | 1700537 | NICTD | FTA | Local Transit Projects | Catenary Replacement | Multiple | SOGR | 2018 | Capital Equipment | $ 2,000,000 | $ 1,600,000 | $ 400,000 | |||
48 | 1700540 | NICTD | FTA | Local Transit Projects | Replacement Rail | Multiple | SOGR | 2018 | Capital Equipment | $ 700,000 | $ 560,000 | $ 140,000 |
Row ID | Des # | Sponsor | Route | Work Category | Work Type | Location | County | Des Length | Federal Fund Type | Year | Phase | Total Funds | Federal Funds | Non-Federal Funds | NE/ RS/ A#/ AM |
49 | 1700541 | NICTD | FTA | Local Transit Projects | Mtce./Supv./Poli ce Vehicles | Multiple | SOGR | 2018 | Capital Equipment | $ 500,000 | $ 400,000 | $ 100,000 | |||
50 | 1700542 | NICTD | FTA | Local Transit Projects | Track Equipment | Multiple | SOGR | 2018 | Capital Equipment | $ 600,000 | $ 480,000 | $ 120,000 | |||
51 | 1700545 | NICTD | FTA | Local Transit Projects | Shop Equipment | Multiple | SOGR | 2018 | Capital Equipment | $ 250,000 | $ 200,000 | $ 50,000 | |||
52 | 1700546 | NICTD | FTA | Local Transit Projects | Track Improvements | Multiple | SOGR | 2018 | Capital Equipment | $ 2,300,000 | $ 1,840,000 | $ 460,000 | |||
53 | 1700549 | NICTD | FTA | Local Transit Projects | New Roof - Mechanical Shop | Multiple | SOGR | 2018 | Capital Equipment | $ 1,000,000 | $ 800,000 | $ 200,000 | |||
54 | 1700550 | NICTD | FTA | Local Transit Projects | Computer Facilities | Multiple | SOGR | 2018 | Capital Equipment | $ 325,000 | $ 260,000 | $ 65,000 | |||
55 | 1700551 | NICTD | FTA | Local Transit Projects | Replace Public Address Systems | Multiple | SOGR | 2018 | Capital Equipment | $ 250,000 | $ 200,000 | $ 50,000 |
Row ID | Des # | Sponsor | Route | Work Category | Work Type | Location | County | Des Length | Federal Fund Type | Year | Phase | Total Funds | Federal Funds | Non-Federal Funds | NE/ RS/ A#/ AM |
56 | 1700552 | NICTD | FTA | Local Transit Projects | Replace Dispatcher Communication System | Multiple | SOGR | 2018 | Capital Equipment | $ 500,000 | $ 400,000 | $ 100,000 | |||
57 | 1700553 | NICTD | FTA | Local Transit Projects | PE - Voice Radio System Upgrade | Multiple | SOGR | 2018 | Capital Equipment | $ 175,000 | $ 140,000 | $ 35,000 | |||
58 | 1700530 | NICTD | FTA | Local Transit Projects | PTC Implementation | Multiple | N/A | 2018 | CN | $ 25,000,000 | $ - | $ 25,000,000 | |||
59 | 1700538 | NICTD | FTA | Local Transit Projects | Substation Improvements | Multiple | SOGR | 2018 | CN | $ 1,500,000 | $ 1,200,000 | $ 300,000 | |||
60 | 1700539 | NICTD | FTA | Local Transit Projects | Bridge Rehabilitation | Multiple | SOGR | 2018 | CN | $ 1,500,000 | $ 1,200,000 | $ 300,000 | |||
61 | 1700543 | NICTD | FTA | Local Transit Projects | Hammond MOW and Parking | Multiple | SOGR | 2018 | CN | $ 1,625,000 | $ 1,300,000 | $ 325,000 | |||
62 | 1700544 | NICTD | FTA | Local Transit Projects | Station Improvements | Multiple | SOGR | 2018 | CN | $ 1,325,000 | $ 1,060,000 | $ 265,000 |
Row ID | Des # | Sponsor | Route | Work Category | Work Type | Location | County | Des Length | Federal Fund Type | Year | Phase | Total Funds | Federal Funds | Non-Federal Funds | NE/ RS/ A#/ AM |
64 | 1700528 | NICTD | FTA | Local Transit Projects | West Lake Project Development | Lake | N/A | 2018 | PE | $ 20,000,000 | $ - | $ 20,000,000 | RS | ||
65 | 1700529 | NICTD | FTA | Local Transit Projects | Double Track Gary to Michigan City Project Development | Multiple | N/A | 2018 | PE | $ 4,000,000 | $ - | $ 4,000,000 | RS | ||
66 | 1700533 | NICTD | FTA | Local Transit Projects | Add Track 7 - Millennium Station | Chicago, IL | Cook | SOGR | 2018 | PE | $ 2,630,123 | $ 2,104,098 | $ 526,025 | ||
67 | 1700534 | NICTD | FTA | Local Transit Projects | Positive Train Control | Multiple | SOGR | 2018 | PE | $ 1,500,000 | $ 1,200,000 | $ 300,000 | |||
68 | 1700548 | NICTD | FTA | Local Transit Projects | Pines Yard PE | Multiple | SOGR | 2018 | PE | $ 375,000 | $ 300,000 | $ 75,000 | |||
69 | 1700532 | NICTD | FTA | Local Transit Projects | South Bend Station Relocation Study | St Joseph | SOGR | 2018 | PL | $ 1,000,000 | $ 800,000 | $ 200,000 | |||
70 | 1700547 | NICTD | FTA | Local Transit Projects | Control Center Contingency Plan | Multiple | SOGR | 2018 | PL | $ 250,000 | $ 200,000 | $ 50,000 |
Row ID | Des # | Sponsor | Route | Work Category | Work Type | Location | County | Des Length | Federal Fund Type | Year | Phase | Total Funds | Federal Funds | Non-Federal Funds | NE/ RS/ A#/ AM |
71 | 1700531 | NICTD | FTA | Local Transit Projects | Maintenance Overhaul | Multiple | FTA 5307 Chicago UA | 2018 | $ 4,953,825 | $ 3,963,060 | $ 990,765 | ||||
72 | 1700562 | NICTD | FTA | Local Transit Projects | Mid-Life - 2000 Cars | Multiple | SOGR | 2018 | Capital Equipment | $ 500,000 | $ 400,000 | $ 100,000 | |||
73 | 1700563 | NICTD | FTA | Local Transit Projects | End of Life - 1982 Cars | Multiple | SOGR | 2018 | Capital Equipment | $ 1,500,000 | $ 1,200,000 | $ 300,000 | |||
74 | 1700564 | NICTD | FTA | Local Transit Projects | Catenary/Signal Improvements | Multiple | SOGR | 2018 | Capital Equipment | $ 2,100,000 | $ 1,680,000 | $ 420,000 | |||
75 | 1700567 | NICTD | FTA | Local Transit Projects | Replacement Rail | Multiple | SOGR | 2018 | Capital Equipment | $ 750,000 | $ 600,000 | $ 150,000 | |||
76 | 1700568 | NICTD | FTA | Local Transit Projects | Mtce./Supv./Poli ce Vehicles | Multiple | SOGR | 2018 | Capital Equipment | $ 550,000 | $ 440,000 | $ 110,000 | |||
77 | 1700569 | NICTD | FTA | Local Transit Projects | Track Equipment | Multiple | SOGR | 2018 | Capital Equipment | $ 650,000 | $ 520,000 | $ 130,000 |
Row ID | Des # | Sponsor | Route | Work Category | Work Type | Location | County | Des Length | Federal Fund Type | Year | Phase | Total Funds | Federal Funds | Non-Federal Funds | NE/ RS/ A#/ AM |
78 | 1700571 | NICTD | FTA | Local Transit Projects | Train Control Improvements | Multiple | SOGR | 2018 | Capital Equipment | $ 412,500 | $ 330,000 | $ 82,500 | |||
79 | 1700559 | NICTD | FTA | Local Transit Projects | PTC Implementation | Multiple | N/A | 2018 | CN | $ 25,000,000 | $ - | $ 25,000,000 | |||
80 | 1700560 | NICTD | FTA | Local Transit Projects | Add Track 7 - Millenium Station | Multiple | SOGR | 2018 | CN | $ 4,696,575 | $ 3,757,260 | $ 939,315 | |||
81 | 1700561 | NICTD | FTA | Local Transit Projects | Positive Train Control | Multiple | SOGR | 2018 | CN | $ 1,500,000 | $ 1,200,000 | $ 300,000 | |||
82 | 1700565 | NICTD | FTA | Local Transit Projects | Substation Improvements | Multiple | SOGR | 2018 | CN | $ 2,000,000 | $ 1,600,000 | $ 400,000 | |||
83 | 1700566 | NICTD | FTA | Local Transit Projects | Bridge Rehabilitation | Multiple | SOGR | 2018 | CN | $ 1,500,000 | $ 1,200,000 | $ 300,000 | |||
84 | 1700570 | NICTD | FTA | Local Transit Projects | Station Improvements | Multiple | SOGR | 2018 | CN | $ 2,100,000 | $ 1,680,000 | $ 420,000 |
Row ID | Des # | Sponsor | Route | Work Category | Work Type | Location | County | Des Length | Federal Fund Type | Year | Phase | Total Funds | Federal Funds | Non-Federal Funds | NE/ RS/ A#/ AM |
85 | 1700572 | NICTD | FTA | Local Transit Projects | New Line and Signal Building | Multiple | SOGR | 2018 | CN | $ 2,500,000 | $ 2,000,000 | $ 500,000 | |||
86 | 1700573 | NICTD | FTA | Local Transit Projects | Replacement Lighting - Shops Yards | Multiple | SOGR | 2018 | CN | $ 1,500,000 | $ 1,200,000 | $ 300,000 | |||
87 | 1700558 | NICTD | FTA | Local Transit Projects | South Bend Realignment NEPA/Final Engineering | Multiple | N/A | 2018 | PE | $ 5,000,000 | $ - | $ 5,000,000 | |||
88 | 1700556 | NICTD | FTA | Local Transit Projects | West Lake PE/Real Estate Acquisition | Multiple | N/A | 2018 | RW | $ 50,000,000 | $ - | $ 50,000,000 | RS | ||
89 | 1700557 | NICTD | FTA | Local Transit Projects | 2nd Track Gary to Michigan City Eng./Real Estate Acq. | Multiple | N/A | 2018 | RW | $ 20,000,000 | $ - | $ 20,000,000 | RS | ||
90 | 1700581 | NICTD | FTA | Local Transit Projects | Mid-Life - 2000 Cars | Multiple | SOGR | 2019 | Capital Equipment | $ 625,000 | $ 500,000 | $ 125,000 | |||
91 | 1700582 | NICTD | FTA | Local Transit Projects | End of Life - 1982 Cars | Multiple | SOGR | 2019 | Capital Equipment | $ 2,375,000 | $ 1,900,000 | $ 475,000 |
Row ID | Des # | Sponsor | Route | Work Category | Work Type | Location | County | Des Length | Federal Fund Type | Year | Phase | Total Funds | Federal Funds | Non-Federal Funds | NE/ RS/ A#/ AM |
92 | 1700583 | NICTD | FTA | Local Transit Projects | Catenary/Signal Improvements | Multiple | SOGR | 2019 | Capital Equipment | $ 2,100,000 | $ 1,680,000 | $ 420,000 | |||
93 | 1700586 | NICTD | FTA | Local Transit Projects | Replacement Rail | Multiple | SOGR | 2019 | Capital Equipment | $ 750,000 | $ 600,000 | $ 150,000 | |||
94 | 1700588 | NICTD | FTA | Local Transit Projects | Mtce./Supv./Poli ce Vehicles | Multiple | SOGR | 2019 | Capital Equipment | $ 550,000 | $ 440,000 | $ 110,000 | |||
95 | 1700589 | NICTD | FTA | Local Transit Projects | Track Equipment | Multiple | SOGR | 2019 | Capital Equipment | $ 650,000 | $ 520,000 | $ 130,000 | |||
96 | 1700592 | NICTD | FTA | Local Transit Projects | Inward Facing Cameras | Multiple | SOGR | 2019 | Capital Equipment | $ 2,000,000 | $ 1,600,000 | $ 400,000 | |||
97 | 1700579 | NICTD | FTA | Local Transit Projects | PTC Implementation | Multiple | N/A | 2019 | CN | $ 25,000,000 | $ - | $ 25,000,000 | |||
98 | 1700580 | NICTD | FTA | Local Transit Projects | Positive Train Control | Multiple | SOGR | 2019 | CN | $ 1,250,000 | $ 1,000,000 | $ 250,000 |
Row ID | Des # | Sponsor | Route | Work Category | Work Type | Location | County | Des Length | Federal Fund Type | Year | Phase | Total Funds | Federal Funds | Non-Federal Funds | NE/ RS/ A#/ AM |
99 | 1700584 | NICTD | FTA | Local Transit Projects | Substation Improvements | Multiple | SOGR | 2019 | CN | $ 2,000,000 | $ 1,600,000 | $ 400,000 | |||
100 | 1700585 | NICTD | FTA | Local Transit Projects | Bridge Rehabilitation | Multiple | SOGR | 2019 | CN | $ 1,625,000 | $ 1,300,000 | $ 325,000 | |||
101 | 1700590 | NICTD | FTA | Local Transit Projects | Station Improvements | Multiple | SOGR | 2019 | CN | $ 6,079,256 | $ 4,863,405 | $ 1,215,851 | |||
102 | 1700591 | NICTD | FTA | Local Transit Projects | Add Track 7 - Millenium Station | Multiple | SOGR | 2019 | CN | $ 2,700,000 | $ 2,160,000 | $ 540,000 | |||
103 | 1700575 | NICTD | FTA | Local Transit Projects | 2nd Track Gary - Michigan City Real Estate Acq./Const. | Multiple | Core Capacity | 2019 | RW | $ 110,000,000 | $ 60,000,000 | $ 50,000,000 | RS | ||
104 | 1700574 | NICTD | FTA | Local Transit Projects | West Lake Project Engineering/Real Estate Acquisition | Multiple | New Start | 2019 | RW | $ 91,190,000 | $ 63,095,000 | $ 28,095,000 | RS | ||
105 | 1700576 | NICTD | FTA | Local Transit Projects | S. Bend Realignment Real Estate Acq./Constructio n | Multiple | TIGER | 2019 | RW | $ 5,000,000 | $ 2,500,000 | $ 2,500,000 |
Row ID | Des # | Sponsor | Route | Work Category | Work Type | Location | County | Des Length | Federal Fund Type | Year | Phase | Total Funds | Federal Funds | Non-Federal Funds | NE/ RS/ A#/ AM |
106 | 1700596 | NICTD | FTA | Local Transit Projects | Rolling Stock Acquisition | Multiple | N/A | 2020 | Capital Equipment | $ 5,000,000 | $ - | $ 5,000,000 | |||
107 | 1700597 | NICTD | FTA | Local Transit Projects | Mid-Life - 2000 Cars | Multiple | SOGR | 2020 | Capital Equipment | $ 625,000 | $ 500,000 | $ 125,000 | |||
108 | 1700598 | NICTD | FTA | Local Transit Projects | End of Life - 1982 Cars | Multiple | SOGR | 2020 | Capital Equipment | $ 2,375,000 | $ 1,900,000 | $ 475,000 | |||
109 | 1700599 | NICTD | FTA | Local Transit Projects | Catenary/Signal Improvements | Multiple | SOGR | 2020 | Capital Equipment | $ 2,100,000 | $ 1,680,000 | $ 420,000 | |||
110 | 1700602 | NICTD | FTA | Local Transit Projects | Replacement Rail | Multiple | SOGR | 2020 | Capital Equipment | $ 750,000 | $ 600,000 | $ 150,000 | |||
111 | 1700603 | NICTD | FTA | Local Transit Projects | Mtce./Supv./Poli ce Vehicles | Multiple | SOGR | 2020 | Capital Equipment | $ 550,000 | $ 440,000 | $ 110,000 | |||
112 | 1700604 | NICTD | FTA | Local Transit Projects | Track Equipment | Multiple | SOGR | 2020 | Capital Equipment | $ 650,000 | $ 520,000 | $ 130,000 |
Row ID | Des # | Sponsor | Route | Work Category | Work Type | Location | County | Des Length | Federal Fund Type | Year | Phase | Total Funds | Federal Funds | Non-Federal Funds | NE/ RS/ A#/ AM |
113 | 1700606 | NICTD | FTA | Local Transit Projects | Rolling Stock Acquisition | Multiple | SOGR | 2020 | Capital Equipment | $ 10,000,000 | $ 8,000,000 | $ 2,000,000 | |||
114 | 1700607 | NICTD | FTA | Local Transit Projects | Inward Facing Cameras | Multiple | SOGR | 2020 | Capital Equipment | $ - | $ - | $ - | |||
115 | 1700619 | NICTD | FTA | Local Transit Projects | Mechanical Components | Multiple | SOGR | 2020 | Capital Equipment | $ 1,200,000 | $ 960,000 | $ 240,000 | |||
116 | 1700594 | NICTD | FTA | Local Transit Projects | Double Track Gary to Michigan City Construction | Multiple | Core Capacity | 2020 | CN | $ 120,000,000 | $ 60,000,000 | $ 60,000,000 | RS | ||
117 | 1700593 | NICTD | FTA | Local Transit Projects | West Lake Project Construction | Lake | New Start | 2020 | CN | $ 231,920,000 | $ 129,960,000 | $ 101,960,000 | RS | ||
118 | 1700600 | NICTD | FTA | Local Transit Projects | Substation Improvements | Multiple | SOGR | 2020 | CN | $ 2,000,000 | $ 1,600,000 | $ 400,000 | |||
119 | 1700601 | NICTD | FTA | Local Transit Projects | Bridge Rehabilitation | Multiple | SOGR | 2020 | CN | $ 1,625,000 | $ 1,300,000 | $ 325,000 |
Row ID | Des # | Sponsor | Route | Work Category | Work Type | Location | County | Des Length | Federal Fund Type | Year | Phase | Total Funds | Federal Funds | Non-Federal Funds | NE/ RS/ A#/ AM |
120 | 1700605 | NICTD | FTA | Local Transit Projects | Station Improvements | Multiple | SOGR | 2020 | CN | $ 1,283,341 | $ 1,026,673 | $ 256,668 | |||
121 | 1700595 | NICTD | FTA | Local Transit Projects | South Bend Realignment Construction | Multiple | TIGER | 2020 | CN | $ 10,000,000 | $ 5,000,000 | $ 5,000,000 | |||
122 | 1700622 | NICTD | FTA | Local Transit Projects | Rolling Stock Acquisition | Multiple | N/A | 2021 | Capital Equipment | $ 5,000,000 | $ - | $ 5,000,000 | |||
123 | 1700623 | NICTD | FTA | Local Transit Projects | Mid-Life - 2000 Cars | Multiple | SOGR | 2021 | Capital Equipment | $ 625,000 | $ 500,000 | $ 125,000 | |||
124 | 1700624 | NICTD | FTA | Local Transit Projects | End of Life - 1982 Cars | Multiple | SOGR | 2021 | Capital Equipment | $ 2,500,000 | $ 2,000,000 | $ 500,000 | |||
125 | 1700626 | NICTD | FTA | Local Transit Projects | Catenary/Signal Improvements | Multiple | SOGR | 2021 | Capital Equipment | $ 2,100,000 | $ 1,680,000 | $ 420,000 | |||
126 | 1700631 | NICTD | FTA | Local Transit Projects | Replacement Rail | Multiple | SOGR | 2021 | Capital Equipment | $ 1,000,000 | $ 800,000 | $ 200,000 |
Row ID | Des # | Sponsor | Route | Work Category | Work Type | Location | County | Des Length | Federal Fund Type | Year | Phase | Total Funds | Federal Funds | Non-Federal Funds | NE/ RS/ A#/ AM |
127 | 1700632 | NICTD | FTA | Local Transit Projects | Mtce./Supv./Poli ce Vehicles | Multiple | SOGR | 2021 | Capital Equipment | $ 562,500 | $ 450,000 | $ 112,500 | |||
128 | 1700633 | NICTD | FTA | Local Transit Projects | Track Equipment | Multiple | SOGR | 2021 | Capital Equipment | $ 675,000 | $ 540,000 | $ 135,000 | |||
129 | 1700635 | NICTD | FTA | Local Transit Projects | Rolling Stock Acquisition | Multiple | SOGR | 2021 | Capital Equipment | $ 10,000,000 | $ 8,000,000 | $ 2,000,000 | |||
130 | 1700636 | NICTD | FTA | Local Transit Projects | Mechanical Components | Multiple | SOGR | 2021 | Capital Equipment | $ 1,250,000 | $ 1,000,000 | $ 250,000 | |||
131 | 1700620 | NICTD | FTA | Local Transit Projects | Double Tracking - Gary to Michigan City | Multiple | Core Capacity | 2021 | CN | $ 36,000,000 | $ 25,000,000 | $ 11,000,000 | RS | ||
132 | 1700621 | NICTD | FTA | Local Transit Projects | West Lake Service | Multiple | New Start | 2021 | CN | $ 210,920,000 | $ 108,960,000 | $ 101,960,000 | RS | ||
133 | 1700627 | NICTD | FTA | Local Transit Projects | Substation Improvements | Multiple | SOGR | 2021 | CN | $ 2,000,000 | $ 1,600,000 | $ 400,000 |
Row ID | Des # | Sponsor | Route | Work Category | Work Type | Location | County | Des Length | Federal Fund Type | Year | Phase | Total Funds | Federal Funds | Non-Federal Funds | NE/ RS/ A#/ AM |
134 | 1700630 | NICTD | FTA | Local Transit Projects | Bridge Rehabilitation | Multiple | SOGR | 2021 | CN | $ 1,625,000 | $ 1,300,000 | $ 325,000 | |||
135 | 1700634 | NICTD | FTA | Local Transit Projects | Station Improvements | Multiple | SOGR | 2021 | CN | $ 1,284,008 | $ 1,027,206 | $ 256,802 | |||
136 | 1592040 | NICTD | FTA | Local Transit Projects | Maintenance Overhaul | Multiple | FTA 5307 Chicago UZA | 2018 | PL | $ 5,281,263 | $ 4,225,010 | $ 1,056,253 | |||
137 | 1383006 | NIRPC | FTA | MPO Planning | Region-wide | Multiple | FTA 5307 Chicago UZA | 2018 | PL | $ 100,000 | $ 80,000 | $ 20,000 | |||
138 | 1383005 | NIRPC | FTA | Subgrantee Grant Admin. | Region-wide | Multiple | FTA 5307 Chicago UZA | 2018 | PL | $ 327,025 | $ 261,620 | $ 65,405 | |||
139 | 1592041 | NIRPC | FTA | MPO Planning | Region-wide | Multiple | FTA 5307 Chicago UZA | 2018 | PL | $ 176,000 | $ 140,800 | $ 35,200 | |||
140 | 1592042 | NIRPC | FTA | Subgrantee Grant Admin. | Region-wide | Multiple | FTA 5307 Chicago UZA | 2018 | PL | $ 327,025 | $ 261,620 | $ 65,405 |
Row ID | Des # | Sponsor | Route | Work Category | Work Type | Location | County | Des Length | Federal Fund Type | Year | Phase | Total Funds | Federal Funds | Non-Federal Funds | NE/ RS/ A#/ AM |
141 | 1592094 | NIRPC | FTA | Replace computers and Related Equipment | Region-wide | Multiple | FTA 5307 Chicago UA | 2019 | Capital Equipment | $ 100,000 | $ 80,000 | $ 20,000 | |||
142 | 1592092 | NIRPC | FTA | MPO Planning | Region-wide | Multiple | FTA 5307 Chicago UZA | 2019 | PL | $ 176,000 | $ 140,800 | $ 35,200 | |||
143 | 1592093 | NIRPC | FTA | Subgrantee Grant Admin. | Region-wide | Multiple | FTA 5307 Chicago UZA | 2019 | PL | $ 327,025 | $ 261,620 | $ 65,405 | |||
144 | 1592136 | North Township | FTA | Facility Improvs. | Lake County | Lake | FTA 5307 Chicago UA | 2018 | Associated Transit Improveme nts | $ 10,000 | $ 8,000 | $ 2,000 | |||
145 | 1383014 | North Township | FTA | Route Match | Participant in Regional Dispatch. | Lake County | Lake | FTA 5307 Chicago UA | 2018 | Capital Equipment | $ 12,500 | $ 10,000 | $ 2,500 | ||
146 | 1383015 | North Township | FTA | Replace one vehicle | Replace One Revenue Vehicle (DAR 16) | Lake County | Lake | STP Transfer | 2018 | Capital Equipment | $ 72,480 | $ 57,984 | $ 14,496 | ||
147 | 1701045 | North Township | FTA | Operating Assistance | Lake County | Lake | FTA 5307 Chicago UA | 2018 | Operating Subsidy | $ 230,000 | $ 115,000 | $ 115,000 |
Row ID | Des # | Sponsor | Route | Work Category | Work Type | Location | County | Des Length | Federal Fund Type | Year | Phase | Total Funds | Federal Funds | Non-Federal Funds | NE/ RS/ A#/ AM |
148 | 1383013 | North Township | FTA | Preventive Maint. | Lake County | Lake | FTA 5307 Chicago UA | 2018 | Operating Subsidy | $ 37,500 | $ 30,000 | $ 7,500 | |||
149 | 1592044 | North Township | FTA | Route Match | Participant in Regional Dispatch. | Lake County | Lake | FTA 5307 Chicago UA | 2018 | Capital Equipment | $ 13,500 | $ 10,800 | $ 2,700 | ||
150 | 1592045 | North Township | FTA | Replace One Revenue Vehicle (DAR 17) | Lake County | Lake | FTA 5307 Chicago UA | 2018 | Capital Equipment | $ 135,000 | $ 114,750 | $ 20,250 | |||
151 | 1592043 | North Township | FTA | Preventive Maint. | Lake County | Lake | FTA 5307 Chicago UA | 2018 | Operating Subsidy | $ 57,288 | $ 45,830 | $ 11,458 | |||
152 | 1592096 | North Township | FTA | Route Match | Participant in Regional Dispatch | Lake County | Lake | FTA 5307 Chicago UA | 2019 | Capital Equipment | $ 14,500 | $ 11,600 | $ 2,900 | ||
153 | 1592097 | North Township | FTA | Replace One Revenue Vehicle (DAR 18) | Lake County | Lake | FTA 5307 Chicago UA | 2019 | Capital Equipment | $ 141,000 | $ 119,850 | $ 21,150 | |||
154 | 1592099 | North Township | FTA | Replace Office Computer Equipment | Lake County | Lake | FTA Chicago UA | 2019 | Capital Equipment | $ 3,500 | $ 2,800 | $ 700 |
Row ID | Des # | Sponsor | Route | Work Category | Work Type | Location | County | Des Length | Federal Fund Type | Year | Phase | Total Funds | Federal Funds | Non-Federal Funds | NE/ RS/ A#/ AM |
155 | 1592098 | North Township | FTA | Replace 9 Tablets | Includes Vehicle Securement Devices | Lake County | Lake | FTA Chicago UZA | 2019 | Capital Equipment | $ 4,500 | $ 3,600 | $ 900 | ||
156 | 1592018 | North Township | FTA | Expanded Demand Response | Year 5 | Lake County | Lake | CMAQ | 2019 | Operating Subsidy | $ 600,000 | $ 480,000 | $ 120,000 | ||
157 | 1592095 | North Township | FTA | Preventive Maint. | Lake County | Lake | FTA 5307 Chicago UA | 2019 | Operating Subsidy | $ 59,000 | $ 47,200 | $ 11,800 | |||
158 | 1383020 | OE | FTA | Replace 3 Revenue Vehicles | Replace 3 Revenue Vehicles | Porter County | Porter | STP Transfer | 2018 | Capital Equipment | $ 238,242 | $ 190,593 | $ 47,648 | ||
159 | 1383019 | OE | FTA | Preventive Maint. | Porter County | Porter | FTA 5307 Chicago UA | 2018 | Operating Subsidy | $ 155,000 | $ 124,000 | $ 31,000 | |||
160 | 1592047 | OE | FTA | Replace 2 Revenue Vehicles | Porter County | Porter | FTA Chicago UA | 2018 | Capital Equipment | $ 148,568 | $ 126,283 | $ 22,285 | |||
161 | 1592046 | OE | FTA | Preventive Maint. | Porter County | Porter | FTA 5307 Chicago UA | 2018 | Operating Subsidy | $ 132,459 | $ 105,972 | $ 26,487 |
Row ID | Des # | Sponsor | Route | Work Category | Work Type | Location | County | Des Length | Federal Fund Type | Year | Phase | Total Funds | Federal Funds | Non-Federal Funds | NE/ RS/ A#/ AM |
162 | 1592101 | OE | FTA | Replace 2 Revenue Vehicles | Porter County | Porter | FTA Chicago UA | 2019 | Capital Equipment | $ 153,025 | $ 130,071 | $ 22,954 | |||
163 | 1592100 | OE | FTA | Preventive Maint. | Porter County | Porter | FTA 5307 Chicago UA | 2019 | Operating Subsidy | $ 139,431 | $ 111,545 | $ 27,886 | |||
164 | 1383029 | PCACS | FTA | Route Match | Participant in Regional Dispatch | Porter County | Porter | FTA 5307 Chicago UA |