Tuesday, June 26, 2018 1:00 pm CST at NIRPC Office
Agenda
Welcome, Pledge of Allegiance
FY 19-22 Spending Plans Probable Solution See attachment
New Amendment Process - moving to Quarterly
Meeting date change from last Tuesday to 4th Tuesday
Amendments
LPA
INDOT
New Business
Public Comments
Adjournment Next meeting is July 24, 2018 @ 1:00 pm CST at LaPorte Parks & Rec Dept. If no business is required, it will be cancelled prior.
Attendance: Charles Bradsky, Dominique Edwards (NIRPC), Mitch Bishop LaPorte County), Margaret Dickerson, Beth Shrader, Nick Minich (City of LaPorte), Craig Phillips, Paul Ruane (Michigan City), Justin Kiel (LaCrosse)(via phone), Dianne Carpenter (guest, citizen)
Meeting called to order at 1:09PM
An additional $1,636,589 needs to spend in FY 19 (by June 2019).
Potential solutions for FY 19 & 20 is to let projects earlier. i.e. projects that are scheduled to let in July or August could be accelerated (after discussion between INDOT, LPA and NIRPC) and let in March or April
Almost $62,000 left on the table for FY 18, some of these funds were allocated to Chessie I
Craig made a request for some funds to cover the inflation for 0301165 since this project was moved a year. He does not have an updated estimate. Charles asked Craig to get an updated estimate before moving further with the discussion.
$35,660 requested by Mitch for des #1601868 for KIP for FY 19. A portion of these funds ($30,740) were originally requested for FY 18 but not used.
Nick wants to move des #1700756 & 1700758 from FY 20 to FY 19.
Nick made a motion to approve funding request of $35,660 to be moved to FY 19 for LaPorte Co. and to move des #1700756 & 1700758 from FY 20 to FY 19, Seconded by Craig. Voted unanimously for.
Nick asked if a Tree Inventory/Survey could qualify for federal funds. Charles stated that he would look into that and get back to the group.
Next month an electronic TIP will be available. LPAs will now have the ability to view the TIP make requests for changes online. For an example of what an e-TIP looks like, view the metropolitan Indianapolis TIP at https://mitip.indympo.org/. INDOT has requested that all MPOs in the state develop an e-TIP.
No other new business was presented.
The meeting was adjourned at 2:15 pm. The next meeting will be June 26, 2018 at 1:00CT at the LaPorte Parks & Rec Dept.
Northwestern Indiana Regional Planning Commission
MPO funds only - 2018-2021 LPA highway projects: Michigan City UZA 6/15/2018
Row ID
Row ID
Includes all amendment changes & proposed amendment #10 changes
< last updated
Des # | Sponsor | Route | Work Type | Location | Letting Date | Federal Fund Type | Year | Phase | In TIP or SPMS Only | Risk | Comments | TIP 2019 | ||||
STBG | CMAQ | HSIP | TA | |||||||||||||
13 | 1401028 | LaPorte | Chessie Trail I | Bicycle & Pedestrian Facilities | From Truesdell Ave NW to East Shore Pkwy at Pine Lake Ave | 5/10/2018 | CMAQ Mich City UZA | 2018 | 1_PE | $ 14,821 | 1_Zero Obligated | Added March 2018 TROC | $ 14,821 | |||
14 | 1401028 | LaPorte | Chessie Trail I | Bicycle & Pedestrian Facilities | From Truesdell Ave NW to East Shore Pkwy at Pine Lake Ave | 5/10/2018 | CMAQ Mich City UZA | 2018 | 2_RW | $ 16,636 | 1_Zero Obligated | AM April 18; Added to cover extra costs April TROC | $ 16,636 | |||
13 | 1500422 | LaPorte | Sidewalks | Bicycle & Pedestrian Facilities | SRTS near Handley Elementary School. | 12/12/2018 | FHWA TAP (LaPorte) | 2019 | 3_CN | $ 194,020 | 3_Med Schedule | Decreased $26,699 and moved to 2019 TC$242,525/ Fed$194,020/ Non- fed$48,505 | $ 194,020 | |||
14 | 1382219 | LaPorte County | Johnson Rd | Intersection improv. With new signals | Johnson Rd Int Imp @ CR 400 North (Keiffer Rd) | 3/6/2019 | STBG II Mich City UZA | 2019 | 3_CN | $ 1,000,000 | 2_Low Schedule | Q3LQR- CN est $1,100,020 ($890,000 fed) CE $150,000 ($110,000) | $ 1,000,000 | |||
15 | 1601868 | LaPorte County | KIP | Signs, Other | at entrance & within Kingsbury Industrial Park | 3/6/2019 | STBG II Mich City UZA | 2019 | 3_CN | $ 149,600 | 4_ High Schedule | move to March 2019 | $ 149,600 | |||
16 | 1601922 | LaCrosse | Sidewalks | Bike/Pedestrian Facilities | Construct Sidewalks at various locations in City of LaCrosse. | 3/6/2019 | STBG II Mich City UZA | 2019 | 3_CN | $ 100,000 | 2_Low | Increase Award $20,000 TC$125,000/ Fed$100,000/ Non- Fed$25,000 | $ 100,000 | |||
17 | 1700756 | LaPorte | Sidewalks | Bike/Pedestrian Facilities | Construct Sidewalks at various locations in City of LaPorte. | 9/11/2019 | STBG II Mich City UZA | 2020 | 3_CN | $ 120,000 | 2_Low | |||||
18 | 1700757 | LaPorte | Sidewalks | Bike/Pedestrian Facilities | Construct Sidewalks at various locations in City of LaPorte. | 3/19/2020 | STBG II Mich City UZA | 2020 | 3_CN | $ 120,000 | 2_Low | |||||
19 | 1700758 | LaPorte | local street | Road Preventive Maintenance | At various locations in City of LaPorte. | 9/25/2019 | STBG II Mich City UZA | 2020 | 3_CN | $ 100,000 | 2_Low | |||||
20 | 1700759 | LaPorte | local street | Road Preventive Maintenance | At various locations in City of LaPorte. | 2/18/2020 | STBG II Mich City UZA | 2020 | 3_CN | $ 100,000 | 2_Low | |||||
21 | 1601867 | LaPorte | Chessie Trail II | Bicycle & Pedestrian Facilities | from Pine Lake Ave Entrance to Newporte Landing SW to J Street at 1st St. | 2/8/2021 | STBG II Mich City UZA | 2020 | 2_RW | $ 160,000 | 2_Low | |||||
22 | 1592335 | LaPorte County | Marquette /Singing Sands Trail (LPCO) | Bicycle & Pedestrian Facilities | Along US 12 from IN/MI State Line to Meer Rd | 12/11/2019 | STBG II Mich City UZA | 2020 | 3_CN | $ 765,398 | 4_High Schedule | Q3LQR- CN est $956,749 ($765,398 fed); CE $0 ?? CN funding amount? | ||||
23 | 1500324 | Michigan City | Singing Sands Trail 2 (MC) | Bike/Pedestrian Facilities | Michigan City - Singing Sands Lighthouse Trail Phase 2, US 12 to Liberty Trail | 7/10/2019 | STBG II Mich City UZA | 2020 | 3_CN | $ 1,619,422 | 2_Low | Q3LQR- CN est $1,500,000 ($1,200,000 fed); CE $187,500 ($150,000 Fed) letting date? | ||||
24 | 1601869 | Michigan City | Singing Sands Trail 3 (MC) | Bike/Pedestrian Facilities | Michigan City - Singing Sands Lighthouse Trail Phase 3, Liberty Trail to Meer Rd | 7/1/2020 | STBG II Mich City UZA | 2020 | 1_PE | $ 74,553 | 3_Med | |||||
25 | 1700760 | LaPorte | local street | Road Preventive Maintenance | At various locations in City of LaPorte. | 1/13/2021 | STBG II Mich City UZA | 2021 | 3_CN | $ 200,000 | 2_Low | |||||
26 | 1601867 | LaPorte | Chessie Trail II | Bicycle & Pedestrian Facilities | from Pine Lake Ave Entrance to Newporte Landing SW to J Street at 1st St. | 2/8/2021 | STBG II Mich City UZA | 2021 | 3_CN | $ 960,000 | 2_Low | |||||
27 | 1601869 | Michigan City | Singing Sands Trail 3 (MC) | Bike/Pedestrian Facilities | Michigan City - Singing Sands Lighthouse Trail Phase 3, Liberty Trail to Meer Rd | 7/1/2020 | STBG II Mich City UZA | 2021 | 3_CN | $ 811,809 | 3_Med | CN est $1,014,761 CE $121,771 | ||||
28 | 2021 | 4_CE | ||||||||||||||
Change Orders | ||||||||||||||||
Des # | Sponsor | Route | Work Type | Location | Letting Date | Federal Fund Type | Year | CO number | CO amount | Approval date | Comments | |||||
1592640 | LaPorte | Various | Bike/Pedestrian Facilities | Sidewalk Replacement, various locations throughout city | 2/28/2017 | 2018 | CO_4 | $ 29,465.87 | ||||||||
Estimated obligations Change orders | $ 1,249,600 | $ 31,457 | $ - | $ 194,020 | ||||||||||||
Estimated and actual obligations | $ 1,249,600 | $ 31,457 | $ - | $ 194,020 | ||||||||||||
2018-2021 fiscal constraint analysis | Obligation authority per funding source per fiscal year Loans / payback from other UZAs Section 164 Penalty Prior year obligation authority balance | $ 1,165,082 | $ 626,051 | $ 259,086 | $ 97,687 | |||||||||||
$ 72,192 | ||||||||||||||||
Note3 | $ 300,000 | $ 126,750 | ||||||||||||||
Total obligation authority | $ 1,465,082.00 | $ 626,051.00 | $ 331,278.00 | $ 224,437.00 | ||||||||||||
Balance (Obligation authority less estimated and actual obligations) | $ 215,482.00 | $ 594,594.00 | $ 331,278.00 | $ 30,417.00 | ||||||||||||
Grand total obligation authority per fiscal year Grand total of estimated and actual obligations per fiscal year | $ 2,646,848.00 | |||||||||||||||
$ 1,475,077.00 | ||||||||||||||||
Total available obligation authority per fiscal year | $ 1,171,771 |
Northwestern Indiana Regional Planning Commission
MPO funds only - 2018-2021 LPA highway projects: Michigan City UZA 6/15/2018 last updat
Row ID
Row ID
Includes all amendment changes & proposed amendment #10 changes
Des # | Sponsor | Route | Work Type | Location | Letting Date | Federal Fund Type | Year | Phase | In TIP or SPMS Only | Risk | TIP 2020 | ||||
STBG | CMAQ | HSIP | TAP/TE-TA | ||||||||||||
13 | 1401028 | LaPorte | Chessie Trail I | Bicycle & Pedestrian Facilities | From Truesdell Ave NW to East Shore Pkwy at Pine Lake Ave | 5/10/2018 | CMAQ Mich City UZA | 2018 | 1_PE | $ 14,821 | 1_Zero Obligated | ||||
14 | 1401028 | LaPorte | Chessie Trail I | Bicycle & Pedestrian Facilities | From Truesdell Ave NW to East Shore Pkwy at Pine Lake Ave | 5/10/2018 | CMAQ Mich City UZA | 2018 | 2_RW | $ 16,636 | 1_Zero Obligated | ||||
13 | 1500422 | LaPorte | Sidewalks | Bicycle & Pedestrian Facilities | SRTS near Handley Elementary School. | 12/12/2018 | FHWA TAP (LaPorte) | 2019 | 3_CN | $ 194,020 | 3_Med Schedule | ||||
14 | 1382219 | LaPorte County | Johnson Rd | Intersection improv. With new signals | Johnson Rd Int Imp @ CR 400 North (Keiffer Rd) | 3/6/2019 | STBG II Mich City UZA | 2019 | 3_CN | $ 1,000,000 | 2_Low Schedule | ||||
15 | 1601868 | LaPorte County | KIP | Signs, Other | at entrance & within Kingsbury Industrial Park | 3/6/2019 | STBG II Mich City UZA | 2019 | 3_CN | $ 149,600 | 4_ High Schedule | ||||
16 | 1601922 | LaCrosse | Sidewalks | Bike/Pedestrian Facilities | Construct Sidewalks at various locations in City of LaCrosse. | 3/6/2019 | STBG II Mich City UZA | 2019 | 3_CN | $ 100,000 | 2_Low | ||||
17 | 1700756 | LaPorte | Sidewalks | Bike/Pedestrian Facilities | Construct Sidewalks at various locations in City of LaPorte. | 9/11/2019 | STBG II Mich City UZA | 2020 | 3_CN | $ 120,000 | 2_Low | $ 120,000 | |||
18 | 1700757 | LaPorte | Sidewalks | Bike/Pedestrian Facilities | Construct Sidewalks at various locations in City of LaPorte. | 3/19/2020 | STBG II Mich City UZA | 2020 | 3_CN | $ 120,000 | 2_Low | $ 120,000 | |||
19 | 1700758 | LaPorte | local street | Road Preventive Maintenance | At various locations in City of LaPorte. | 9/25/2019 | STBG II Mich City UZA | 2020 | 3_CN | $ 100,000 | 2_Low | $ 100,000 | |||
20 | 1700759 | LaPorte | local street | Road Preventive Maintenance | At various locations in City of LaPorte. | 2/18/2020 | STBG II Mich City UZA | 2020 | 3_CN | $ 100,000 | 2_Low | $ 100,000 | |||
21 | 1601867 | LaPorte | Chessie Trail II | Bicycle & Pedestrian Facilities | from Pine Lake Ave Entrance to Newporte Landing SW to J Street at 1st St. | 2/8/2021 | STBG II Mich City UZA | 2020 | 2_RW | $ 160,000 | 2_Low | $ 160,000 | |||
22 | 1592335 | LaPorte County | Marquette /Singing Sands Trail (LPCO) | Bicycle & Pedestrian Facilities | Along US 12 from IN/MI State Line to Meer Rd | 12/11/2019 | STBG II Mich City UZA | 2020 | 3_CN | $ 765,398 | 4_High Schedule | $ 765,398 | |||
23 | 1500324 | Michigan City | Singing Sands Trail 2 (MC) | Bike/Pedestrian Facilities | Michigan City - Singing Sands Lighthouse Trail Phase 2, US 12 to Liberty Trail | 7/10/2019 | STBG II Mich City UZA | 2020 | 3_CN | $ 1,619,422 | 2_Low | $ 1,619,422 | |||
24 | 1601869 | Michigan City | Singing Sands Trail 3 (MC) | Bike/Pedestrian Facilities | Michigan City - Singing Sands Lighthouse Trail Phase 3, Liberty Trail to Meer Rd | 7/1/2020 | STBG II Mich City UZA | 2020 | 1_PE | $ 74,553 | 3_Med | $ 74,553 | |||
25 | 1700760 | LaPorte | local street | Road Preventive Maintenance | At various locations in City of LaPorte. | 1/13/2021 | STBG II Mich City UZA | 2021 | 3_CN | $ 200,000 | 2_Low | ||||
26 | 1601867 | LaPorte | Chessie Trail II | Bicycle & Pedestrian Facilities | from Pine Lake Ave Entrance to Newporte Landing SW to J Street at 1st St. | 2/8/2021 | STBG II Mich City UZA | 2021 | 3_CN | $ 960,000 | 2_Low | ||||
27 | 1601869 | Michigan City | Singing Sands Trail 3 (MC) | Bike/Pedestrian Facilities | Michigan City - Singing Sands Lighthouse Trail Phase 3, Liberty Trail to Meer Rd | 7/1/2020 | STBG II Mich City UZA | 2021 | 3_CN | $ 811,809 | 3_Med | ||||
28 | 2021 | 4_CE | |||||||||||||
Change Orders | |||||||||||||||
Des # | Sponsor | Route | Work Type | Location | Letting Date | Federal Fund Type | Year | CO number | CO amount | Approval date | Comments | ||||
1592640 | LaPorte | Various | Bike/Pedestrian Facilities | Sidewalk Replacement, various locations throughout city | 2/28/2017 | 2018 | CO_4 | $ 29,465.87 | |||||||
Estimated obligations Change orders | $ 3,059,373 | $ - | $ - | $ - | |||||||||||
Estimated and actual obligations | $ 3,059,373 | $ - | $ - | $ - | |||||||||||
2018-2021 fiscal constraint analysis | Obligation authority per funding source per fiscal year Loans / payback from other UZAs Section 164 Penalty Prior year obligation authority balance | $ 1,165,082 | $ 626,051 | $ 259,086 | $ 97,687 | ||||||||||
$ 72,192 | |||||||||||||||
$ 1,655,792 | |||||||||||||||
Total obligation authority | $ 2,820,874.00 | $ 626,051.00 | $ 331,278.00 | $ 97,687.00 | |||||||||||
Balance (Obligation authority less estimated and actual obligations) | $ (238,499.00) | $ 626,051.00 | $ 331,278.00 | $ 97,687.00 | |||||||||||
Grand total obligation authority per fiscal year Grand total of estimated and actual obligations per fiscal year | $ 3,875,890.00 | ||||||||||||||
$ 3,059,373.00 | |||||||||||||||
Total available obligation authority per fiscal year |
Northwestern Indiana Regional Planning Commission
MPO funds only - 2018-2021 LPA highway projects: Michigan City UZA 6/15/2018 last updat
Row ID
Row ID
Includes all amendment changes & proposed amendment #10 changes
Des # | Sponsor | Route | Work Type | Location | Letting Date | Federal Fund Type | Year | Phase | In TIP or SPMS Only | Risk | TIP 2021 | ||||
STBG | CMAQ | HSIP | TA | ||||||||||||
13 | 1401028 | LaPorte | Chessie Trail I | Bicycle & Pedestrian Facilities | From Truesdell Ave NW to East Shore Pkwy at Pine Lake Ave | 5/10/2018 | CMAQ Mich City UZA | 2018 | 1_PE | $ 14,821 | 1_Zero Obligated | ||||
14 | 1401028 | LaPorte | Chessie Trail I | Bicycle & Pedestrian Facilities | From Truesdell Ave NW to East Shore Pkwy at Pine Lake Ave | 5/10/2018 | CMAQ Mich City UZA | 2018 | 2_RW | $ 16,636 | 1_Zero Obligated | ||||
13 | 1500422 | LaPorte | Sidewalks | Bicycle & Pedestrian Facilities | SRTS near Handley Elementary School. | 12/12/2018 | FHWA TAP (LaPorte) | 2019 | 3_CN | $ 194,020 | 3_Med Schedule | ||||
14 | 1382219 | LaPorte County | Johnson Rd | Intersection improv. With new signals | Johnson Rd Int Imp @ CR 400 North (Keiffer Rd) | 3/6/2019 | STBG II Mich City UZA | 2019 | 3_CN | $ 1,000,000 | 2_Low Schedule | ||||
15 | 1601868 | LaPorte County | KIP | Signs, Other | at entrance & within Kingsbury Industrial Park | 3/6/2019 | STBG II Mich City UZA | 2019 | 3_CN | $ 149,600 | 4_ High Schedule | ||||
16 | 1601922 | LaCrosse | Sidewalks | Bike/Pedestrian Facilities | Construct Sidewalks at various locations in City of LaCrosse. | 3/6/2019 | STBG II Mich City UZA | 2019 | 3_CN | $ 100,000 | 2_Low | ||||
17 | 1700756 | LaPorte | Sidewalks | Bike/Pedestrian Facilities | Construct Sidewalks at various locations in City of LaPorte. | 9/11/2019 | STBG II Mich City UZA | 2020 | 3_CN | $ 120,000 | 2_Low | ||||
18 | 1700757 | LaPorte | Sidewalks | Bike/Pedestrian Facilities | Construct Sidewalks at various locations in City of LaPorte. | 3/19/2020 | STBG II Mich City UZA | 2020 | 3_CN | $ 120,000 | 2_Low | ||||
19 | 1700758 | LaPorte | local street | Road Preventive Maintenance | At various locations in City of LaPorte. | 9/25/2019 | STBG II Mich City UZA | 2020 | 3_CN | $ 100,000 | 2_Low | ||||
20 | 1700759 | LaPorte | local street | Road Preventive Maintenance | At various locations in City of LaPorte. | 2/18/2020 | STBG II Mich City UZA | 2020 | 3_CN | $ 100,000 | 2_Low | ||||
21 | 1601867 | LaPorte | Chessie Trail II | Bicycle & Pedestrian Facilities | from Pine Lake Ave Entrance to Newporte Landing SW to J Street at 1st St. | 2/8/2021 | STBG II Mich City UZA | 2020 | 2_RW | $ 160,000 | 2_Low | ||||
22 | 1592335 | LaPorte County | Marquette /Singing Sands Trail (LPCO) | Bicycle & Pedestrian Facilities | Along US 12 from IN/MI State Line to Meer Rd | 12/11/2019 | STBG II Mich City UZA | 2020 | 3_CN | $ 765,398 | 4_High Schedule | ||||
23 | 1500324 | Michigan City | Singing Sands Trail 2 (MC) | Bike/Pedestrian Facilities | Michigan City - Singing Sands Lighthouse Trail Phase 2, US 12 to Liberty Trail | 7/10/2019 | STBG II Mich City UZA | 2020 | 3_CN | $ 1,619,422 | 2_Low | ||||
24 | 1601869 | Michigan City | Singing Sands Trail 3 (MC) | Bike/Pedestrian Facilities | Michigan City - Singing Sands Lighthouse Trail Phase 3, Liberty Trail to Meer Rd | 7/1/2020 | STBG II Mich City UZA | 2020 | 1_PE | $ 74,553 | 3_Med | ||||
25 | 1700760 | LaPorte | local street | Road Preventive Maintenance | At various locations in City of LaPorte. | 1/13/2021 | STBG II Mich City UZA | 2021 | 3_CN | $ 200,000 | 2_Low | $ 200,000 | |||
26 | 1601867 | LaPorte | Chessie Trail II | Bicycle & Pedestrian Facilities | from Pine Lake Ave Entrance to Newporte Landing SW to J Street at 1st St. | 2/8/2021 | STBG II Mich City UZA | 2021 | 3_CN | $ 960,000 | 2_Low | $ 960,000 | |||
27 | 1601869 | Michigan City | Singing Sands Trail 3 (MC) | Bike/Pedestrian Facilities | Michigan City - Singing Sands Lighthouse Trail Phase 3, Liberty Trail to Meer Rd | 7/1/2020 | STBG II Mich City UZA | 2021 | 3_CN | $ 811,809 | 3_Med | $ 811,809 | |||
28 | 2021 | 4_CE | $ - | ||||||||||||
Change Orders | |||||||||||||||
Des # | Sponsor | Route | Work Type | Location | Letting Date | Federal Fund Type | Year | CO number | CO amount | Approval date | Comments | ||||
1592640 | LaPorte | Various | Bike/Pedestrian Facilities | Sidewalk Replacement, various locations throughout city | 2/28/2017 | 2018 | CO_4 | $ 29,465.87 | |||||||
Estimated obligations Change orders | $ 811,809 | $ - | $ - | $ 1,160,000 | |||||||||||
Estimated and actual obligations | $ 811,809 | $ - | $ - | $ 1,160,000 | |||||||||||
2018-2021 fiscal constraint analysis | Obligation authority per funding source per fiscal year Loans / payback from other UZAs Section 164 Penalty Prior year obligation authority balance | $ 1,165,082 | $ 626,051 | $ 259,086 | $ 97,687 | ||||||||||
$ 72,192 | |||||||||||||||
Total obligation authority | $ 1,165,082.00 | $ 626,051.00 | $ 331,278.00 | $ 97,687.00 | |||||||||||
Balance (Obligation authority less estimated and actual obligations) | $ 353,273.00 | $ 626,051.00 | $ 331,278.00 | $ (1,062,313.00) | |||||||||||
Grand total obligation authority per fiscal year Grand total of estimated and actual obligations per fiscal year | $ 2,220,098.00 | ||||||||||||||
$ 1,971,809.00 | |||||||||||||||
Total available obligation authority per fiscal year |
Northwestern Indiana Regional Planning Commission
MPO funds only - 2018-2021 LPA highway projects: Michigan City UZA 6/15/2018 last updat
Row ID
Row ID
Includes all amendment changes & proposed amendment #10 changes
Des # | Sponsor | Route | Work Type | Location | Letting Date | Federal Fund Type | Year | Phase | In TIP or SPMS Only | Risk | 2022 | Post-TIP | ||||
STBG | CMAQ | HSIP | TA | All sources | ||||||||||||
13 | 1401028 | LaPorte | Chessie Trail I | Bicycle & Pedestrian Facilities | From Truesdell Ave NW to East Shore Pkwy at Pine Lake Ave | 5/10/2018 | CMAQ Mich City UZA | 2018 | 1_PE | $ 14,821 | 1_Zero Obligated | |||||
14 | 1401028 | LaPorte | Chessie Trail I | Bicycle & Pedestrian Facilities | From Truesdell Ave NW to East Shore Pkwy at Pine Lake Ave | 5/10/2018 | CMAQ Mich City UZA | 2018 | 2_RW | $ 16,636 | 1_Zero Obligated | |||||
13 | 1500422 | LaPorte | Sidewalks | Bicycle & Pedestrian Facilities | SRTS near Handley Elementary School. | 12/12/2018 | FHWA TAP (LaPorte) | 2019 | 3_CN | $ 194,020 | 3_Med Schedule | |||||
14 | 1382219 | LaPorte County | Johnson Rd | Intersection improv. With new signals | Johnson Rd Int Imp @ CR 400 North (Keiffer Rd) | 3/6/2019 | STBG II Mich City UZA | 2019 | 3_CN | $ 1,000,000 | 2_Low Schedule | |||||
15 | 1601868 | LaPorte County | KIP | Signs, Other | at entrance & within Kingsbury Industrial Park | 3/6/2019 | STBG II Mich City UZA | 2019 | 3_CN | $ 149,600 | 4_ High Schedule | |||||
16 | 1601922 | LaCrosse | Sidewalks | Bike/Pedestrian Facilities | Construct Sidewalks at various locations in City of LaCrosse. | 3/6/2019 | STBG II Mich City UZA | 2019 | 3_CN | $ 100,000 | 2_Low | |||||
17 | 1700756 | LaPorte | Sidewalks | Bike/Pedestrian Facilities | Construct Sidewalks at various locations in City of LaPorte. | 9/11/2019 | STBG II Mich City UZA | 2020 | 3_CN | $ 120,000 | 2_Low | |||||
18 | 1700757 | LaPorte | Sidewalks | Bike/Pedestrian Facilities | Construct Sidewalks at various locations in City of LaPorte. | 3/19/2020 | STBG II Mich City UZA | 2020 | 3_CN | $ 120,000 | 2_Low | |||||
19 | 1700758 | LaPorte | local street | Road Preventive Maintenance | At various locations in City of LaPorte. | 9/25/2019 | STBG II Mich City UZA | 2020 | 3_CN | $ 100,000 | 2_Low | |||||
20 | 1700759 | LaPorte | local street | Road Preventive Maintenance | At various locations in City of LaPorte. | 2/18/2020 | STBG II Mich City UZA | 2020 | 3_CN | $ 100,000 | 2_Low | |||||
21 | 1601867 | LaPorte | Chessie Trail II | Bicycle & Pedestrian Facilities | from Pine Lake Ave Entrance to Newporte Landing SW to J Street at 1st St. | 2/8/2021 | STBG II Mich City UZA | 2020 | 2_RW | $ 160,000 | 2_Low | |||||
22 | 1592335 | LaPorte County | Marquette /Singing Sands Trail (LPCO) | Bicycle & Pedestrian Facilities | Along US 12 from IN/MI State Line to Meer Rd | 12/11/2019 | STBG II Mich City UZA | 2020 | 3_CN | $ 765,398 | 4_High Schedule | |||||
23 | 1500324 | Michigan City | Singing Sands Trail 2 (MC) | Bike/Pedestrian Facilities | Michigan City - Singing Sands Lighthouse Trail Phase 2, US 12 to Liberty Trail | 7/10/2019 | STBG II Mich City UZA | 2020 | 3_CN | $ 1,619,422 | 2_Low | |||||
24 | 1601869 | Michigan City | Singing Sands Trail 3 (MC) | Bike/Pedestrian Facilities | Michigan City - Singing Sands Lighthouse Trail Phase 3, Liberty Trail to Meer Rd | 7/1/2020 | STBG II Mich City UZA | 2020 | 1_PE | $ 74,553 | 3_Med | |||||
25 | 1700760 | LaPorte | local street | Road Preventive Maintenance | At various locations in City of LaPorte. | 1/13/2021 | STBG II Mich City UZA | 2021 | 3_CN | $ 200,000 | 2_Low | |||||
26 | 1601867 | LaPorte | Chessie Trail II | Bicycle & Pedestrian Facilities | from Pine Lake Ave Entrance to Newporte Landing SW to J Street at 1st St. | 2/8/2021 | STBG II Mich City UZA | 2021 | 3_CN | $ 960,000 | 2_Low | |||||
27 | 1601869 | Michigan City | Singing Sands Trail 3 (MC) | Bike/Pedestrian Facilities | Michigan City - Singing Sands Lighthouse Trail Phase 3, Liberty Trail to Meer Rd | 7/1/2020 | STBG II Mich City UZA | 2021 | 3_CN | $ 811,809 | 3_Med | |||||
28 | 2021 | 4_CE | ||||||||||||||
Change Orders | ||||||||||||||||
Des # | Sponsor | Route | Work Type | Location | Letting Date | Federal Fund Type | Year | CO number | CO amount | |||||||
1592640 | LaPorte | Various | Bike/Pedestrian Facilities | Sidewalk Replacement, various locations throughout city | 2/28/2017 | 2018 | CO_4 | $ 29,465.87 | ||||||||
Estimated obligations Change orders | $ - | $ - | $ - | $ - | $ - | |||||||||||
Estimated and actual obligations | $ - | $ - | $ - | $ - | $ - | |||||||||||
2018-2021 fiscal constraint analysis | Obligation authority per funding source per fiscal year Loans / payback from other UZAs Section 164 Penalty Prior year obligation authority balance | $ 1,165,082 | $ 626,051 | $ 259,086 | $ 97,687 | $ 2,147,906 | ||||||||||
$ 72,192 | $ 72,192 | |||||||||||||||
Total obligation authority | $ 1,165,082.00 | $ 626,051.00 | $ 331,278.00 | $ 97,687.00 | $ 2,220,098.00 | |||||||||||
Balance (Obligation authority less estimated and actual obligations) | $ 1,165,082.00 | $ 626,051.00 | $ 331,278.00 | $ 97,687.00 | $ 72,192 | |||||||||||
Grand total obligation authority per fiscal year Grand total of estimated and actual obligations per fiscal year | $ 2,220,098.00 | $ 2,220,098.00 | ||||||||||||||
$ - | $ - | |||||||||||||||
Total available obligation authority per fiscal year |
2018-2021 Transportation Improvement Program for Lake, Porter, and LaPorte Counties, Indiana |
Resolution 18-10; Amendment #13 July 2018 |
1601211 | Lake County | Truck Stop Electrification. CMAQ Equipment. 3P Agreement | Eliminate Project | CMAQ Chicago UZA | PE | 2018 | $ (433,732) $ | (329,386) $ | (104,346) |
Lake county does not want continue with this P3 project
1592338 | LaPorte County | Economic Cooridor Study | Add project | STBG II Michigan City UZA | PL | 2018 | $ 20,000 | $ 16,000 | $ 4,000 |
The county requests funds for this study.
1601157 | Crown Point | 109th Ave Access Control, Delaware Pkwy to SR 53, includes median construction | Add Phase | HSIP Chicago UZA | PE | 2018 | $ 40,506 | $ 36,455 | $ 4,051 |
The city wishes to add this phase to FY 18
1173430 | Portage | Central Ave; From County Line Rd to Willowcreek Road | Add Phase | DEMO | PE | 2019 | $ 56,085 | $ 56,085 | $ - |
The City wishes to add this phase to FY 19.
1600418 | Gary | Road Reconstruction; Industrial Highway (Airport Rd.), Phase III, Cline Ave to EJ&E RR bridge | Add Funds | STBG I Chicago UZA | ROW CN | 2020 2022 | $ 200,000 $ 896,000 | $ 160,000 $ 716,800 | $ 40,000 $ 179,200 |
The city wishes to eliminate des # 0710064 and apply all funding towards this project. These funds will go towards improved lighting, signage, & landscaping. This will will improve the primary gateway to the Gary Chicago International Airport, and strengthen it as an important economic asset for Gary and Northwest Indiana.
0710064 | Gary | Multiple locations at/near intersection of 15th Ave and MLK Dr. | Eliminate Project | STBG I Chicago UZA | ROW CN | 2020 2022 | $ 200,000 $ 896,000 | $ 160,000 $ 716,800 | $ 40,000 $ 179,200 |
The city wishes to eliminate this project and apply all funds towards 1600418.
1172078 | Gary | Road Reconstruction; Ridge Road Reconstruction, Connecticut St to Mississippi St. Phase 2 | Change Scope; Reduce funds | STBG I Chicago UZA | CN | 2019 | $ 3,750,000 | $ 3,000,000 | $ 750,000 |
The City of Gary proposes shifting the scope of the Ridge Road Reconstruction project (DES#1172078) to the 15th Avenue Gateway project. The $3,000,000 in reallocated funding would go toward the repaving and reconstruction of 15th Avenue, Michigan Street, and Texas Street, between Interstate 65 and Martin Luther King Boulevard. This shift aligns the City’s infrastructure improvement dollars with a project in a key economic development area, where existing Tax Increment Financing from the City’s Midwest Center TIF District can provide a viable source of local funding to match the project’s federal grant dollars. | |||||||||
PENDING | Gary | Road Reconstruction; Complete Streets Enhancements | Change Scope; Reduce funds | STBG I Chicago UZA | CN | 2019 | $ 2,575,000 | $ 2,060,000 | $ 515,000 |
The City of Gary proposes shifting the remaining funding from the Ridge Road Reconstruction project (DES#1172078) to the East Lakefront Complete Streets project (des number is Pending). The anticipated $2,060,000 in reallocated funding would match $6.1 million in pledged state and local funding, and go toward adding bike lanes, and improving sidewalks, landscaping, lighting, and signage on Lake Street and US 12 & 20. This project will advance transit-oriented development and economic development around the Miller South Shore commuter station and improve access to the Indiana Dunes National Lakeshore. This shift aligns the City’s infrastructure improvement dollars with a project in a key economic development area, where existing Tax Increment Financing from the City’s East Lakefront TIF District, and other sources, can provide a viable source of local funding to match the project’s federal grant dollars . |
2018-2021 Transportation Improvement Program for Lake, Porter, and LaPorte Counties, Indiana |
Resolution 18-11; Amendment #14 July 2018 |
CN | 2021 | $ 12,030,394 | $ 9,624,315 | $ 2,406,079 | |||||
PE | 2019 | $ 1,110,000 | $ 888,000 | $ 222,000 | |||||
1801376 | INDOT | SR 49, Intersection Improv. W/Added Turn Lanes, Intersection w/Gateway Blvd, CR 1100N, Porter Ave & Indian Boundary Rd | Add Project | STP | RW RR | 2019 2020 | $ 150,000 $ 50,000 | $ 120,000 $ 40,000 | $ 30,000 $ 10,000 |
UT | 2020 | $ 100,000 | $ 80,000 | $ 20,000 | |||||
RW | 2020 | $ 490,000 | $ 392,000 | $ 98,000 |
New project request from INDOT
CN | 2021 | $ 8,513,979 | $ 7,662,581 | $ 851,398 | |||||
1800932 | INDOT | I80/94, Profiling, PCCP, From the Illinois State Line to 1.0mi W of I-65 (Grant St) | Add Project | NHPP Interstate | PE RR | 2019 2021 | $ 632,000 $ 50,000 | $ 568,800 $ 45,000 | $ 63,200 $ 5,000 |
UT | 2020 | $ 50,000 | $ 45,000 | $ 5,000 |
New project request from INDOT
CN | 2021 | $ 324,453 | $ 259,562 | $ 64,891 | |||||
1800824 | INDOT | US 20, Bridge Thin Deck Overlay, 1.44mi W of SR 2 @ N&S RR | Add Project | NHPP | PE UT | 2019 2020 | $ 40,788 $ 10,000 | $ 32,630 $ 8,000 | $ 8,158 $ 2,000 |
RR | 2021 | $ 15,000 | $ 12,000 | $ 3,000 |
New project request from INDOT
1800834 | INDOT | US 30, Bridge Deck Overlay, 1.86mi E of SR 39, WBL @ Kankakee River | Add Project | NHPP | CN 2021 $ 627,878 $ 502,302 $ 125,576 PE 2019 $ 78,752 $ 63,002 $ 15,750
|
UT 2020 $ 10,000 $ 8,000 $ 2,000 |
New project request from INDOT
1800833 | INDOT | US 30, Bridge Deck Overlay, 1.86mi E of SR 39, EBL @ Kankakee River | Add Project | NHPP | CN 2021 $ 627,878 $ 502,302 $ 125,576 PE 2019 $ 78,752 $ 63,002 $ 15,750
|
UT 2020 $ 10,000 $ 8,000 $ 2,000 |
New project request from INDOT
CN | 2021 | $ 542,728 | $ 434,182 | $ 108,546 | |||||
1800629 | INDOT | SR 49, Bridge Painting, 0.45mi N of SR 2 NBL @ GTW RR | Add Project | STP | PE UT | 2019 2020 | $ 68,288 $ 10,000 | $ 54,630 $ 8,000 | $ 13,658 $ 2,000 |
RR | 2021 | $ 20,000 | $ 16,000 | $ 4,000 |
New project request from INDOT
CN | 2021 | $ 542,728 | $ 434,182 | $ 108,546 | |||||
1800630 | INDOT | SR 49, Bridge Painting, 0.45mi N of SR 2 SBL @ GTW RR | Add Project | STP | PE UT | 2019 2020 | $ 68,288 $ 10,000 | $ 54,630 $ 8,000 | $ 13,658 $ 2,000 |
RR | 2021 | $ 20,000 | $ 16,000 | $ 4,000 |
New project request from INDOT
CN | 2021 | $ 1,157,005 | $ 925,604 | $ 231,401 | |||||
1800844 | INDOT | SR 49, Bridge Deck Overlay, 0.98mi N of US 6 NBL @ CSX RR, CR 900N | Add Project | STP | PE UT | 2019 2020 | $ 145,690 $ 10,000 | $ 116,552 $ 8,000 | $ 29,138 $ 2,000 |
RR | 2021 | $ 12,500 | $ 10,000 | $ 2,500 |
New project request from INDOT
CN | 2021 | $ 1,157,005 | $ 925,604 | $ 231,401 | |||||
1800845 | INDOT | SR 49, Bridge Deck Overlay, 0.98mi N of US 6 SBL @ CSX RR, CR 900N | Add Project | STP | PE UT | 2019 2020 | $ 145,690 $ 10,000 | $ 116,552 $ 8,000 | $ 39,138 $ 2,000 |
RR | 2021 | $ 12,500 | $ 10,000 | $ 2,500 |
New project request from INDOT
CN 2021 $ 1,640,619 $ 1,476,557 $ 164,062 | ||||
1800863 | INDOT | I 94, Bridge Deck Overlay, 2.93mi E of US 421, Johnson Rd @ I-94 EB/WB Norris Ditch | Add Project | NHPP PE 2019 $ 205,776 $ 185,198 $ 20,578 Interstate |
UT 2020 $ 10,000 $ 9,000 $ 1,000 |
New project request from INDOT
CN | 2021 | $ 718,942 | $ 647,048 | $ 71,894 | |||||
1800625 | INDOT | I 94, Bridge Painting, 1.36mi E of US 20, I-94 EB @ Conrail RR | Add Project | NHPP Interstate | PE UT | 2019 2020 | $ 79,200 $ 10,000 | $ 71,280 $ 9,000 | $ 7,920 $ 1,000 |
RR | 2021 | $ 20,000 | $ 18,000 | $ 2,000 |
New project request from INDOT
CN | 2021 | $ 718,942 | $ 647,048 | $ 71,894 | |||||
1800626 | INDOT | I 94, Bridge Painting, 1.36mi E of US 20, I-94 WB @ Conrail RR | Add Project | NHPP Interstate | PE UT | 2019 2020 | $ 79,200 $ 10,000 | $ 71,280 $ 9,000 | $ 7,920 $ 1,000 |
RR | 2021 | $ 20,000 | $ 18,000 | $ 2,000 |
New project request from INDOT
1702611 | INDOT | US 20, Bridge Deck Overlay, 1.05mi E of SR 51, @ Burns Ditch/Deep River | Add Project | NHPP | CN PE | 2021 2019 | $ 765,462 $ 85,200 | $ 612,370 $ 68,160 | $ 153,092 $ 17,040 |
UT | 2020 | $ 10,000 | $ 8,000 | $ 2,000 |
New project request from INDOT
1702610 | INDOT | US 12, Bridge Deck Overlay, 1.27mi W of I- 90, US 12/SR 912 @ SR 312, 2 Ramps | Add Project | NHPP | CN PE | 2021 2019 | $ 1,509,362 $ 181,123 | $ 1,207,490 $ 144,895 | $ 301,872 $ 36,225 |
UT | 2020 | $ 10,000 | $ 8,000 | $ 2,000 |
New project request from INDOT
1800814 | INDOT | US 41, Bridge Deck Overlay, SB on Ramps J @ I-80/94 CD/ Ramps Ave, 0.10mi W of US 41 | Add Project | NHPP | CN 2021 $ 1,512,577 $ 1,210,062 $ 302,515 PE 2019 $ 112,000 $ 89,600 $ 22,400
|
UT 2020 $ 10,000 $ 8,000 $ 2,000 |
New project request from INDOT
1800815 | INDOT | SR 149, Bridge Deck Overlay, @ I-94 EB/WB, 0.39mi N of US 20 | Add Project | STP | CN 2021 $ 1,250,534 $ 1,000,427 $ 250,107 PE 2019 $ 92,560 $ 74,048 $ 18,512
|
UT 2020 $ 10,000 $ 8,000 $ 2,000 |
New project request from INDOT
1702599 | INDOT | US 41, Bridge Deck Overlay, 3.78mi S of SR 312, Calumet Ave @ I-80/94 E/W, CD Ramps | Add Project | NHPP | CN 2021 $ 1,344,241 $ 1,074,393 $ 268,848 PE 2019 $ 99,760 $ 79,808 $ 19,952
|
UT 2020 $ 10,000 $ 8,000 $ 2,000 |
New project request from INDOT
1800687 | INDOT | SR 249, Bridge Painting, 0.71mi N of I-94, NB @ Little Calumet River | Add Project | STP | CN 2021 $ 457,001 $ 365,601 $ 91,400 PE 2019 $ 50,400 $ 40,320 $ 10,080
|
UT 2020 $ 10,000 $ 8,000 $ 2,000 |
New project request from INDOT
1702603 | INDOT | SR 249, Bridge Deck Overlay, 0.24mi N of US 20, SB @ I-94 EB/WB | Add Project | STP | CN 2021 $ 840,930 $ 672,744 $ 168,186 PE 2019 $ 93,600 $ 74,880 $ 18,720
|
UT 2020 $ 10,000 $ 8,000 $ 2,000 |
New project request from INDOT
1702603 | INDOT | SR 249, Bridge Deck Overlay, 0.24mi N of US 20, NB @ I-94 EB/WB | Add Project | STP | CN PE | 2021 2019 | $ 840,930 $ 93,600 | $ 672,744 $ 74,880 | $ 168,186 $ 1,872 |
UT | 2020 | $ 10,000 | $ 8,000 | $ 2,000 |
New project request from INDOT
1800633 | INDOT | SR 249, Bridge Painting, SB@.-I-94 EB/WB, 0.24mi N of US 20 | Add Project | STP | CN PE | 2021 2019 | $ 670,268 $ 73,920 | $ 536,214 $ 59,136 | $ 134,054 $ 14,784 |
UT | 2020 | $ 10,000 | $ 8,000 | $ 2,000 |
New project request from INDOT
1800632 | INDOT | SR 249, Bridge Painting, NB@.-I-94 EB/WB, 0.24mi N of US 20 | Add Project | STP | CN PE | 2021 2019 | $ 670,268 $ 73,920 | $ 536,214 $ 59,136 | $ 134,054 $ 14,784 |
UT | 2020 | $ 10,000 | $ 8,000 | $ 2,000 |
New project request from INDOT
1800631 | INDOT | SR 149, Bridge Painting, @.-SALT CREEK, 0.93mi N of US 6 | Add Project | STP | CN PE | 2021 2019 | $ 499,437 $ 55,080 | $ 399,550 $ 44,064 | $ 99,887 $ 11,016 |
UT | 2020 | $ 10,000 | $ 8,000 | $ 2,000 |
New project request from INDOT
1800627 | INDOT | US 6, Bridge Painting, @.-SALT CREEK, 0.15mi E of SR 149 | Add Project | NHPP | CN PE | 2021 2019 | $ 500,525 $ 55,200 | $ 400,420 $ 44,160 | $ 100,105 $ 11,040 |
UT | 2020 | $ 10,000 | $ 8,000 | $ 2,000 |
New project request from INDOT
CN | 2021 | $ 911,673 | $ 729,338 | $ 182,335 | |||||
1800567 | INDOT | SR 912, Bridge Painting, @.-N&S RR, 0.25mi W of I-80 | Add Project | STP | PE UT | 2019 2020 | $ 100,560 $ 10,000 | $ 80,448 $ 8,000 | $ 20,112 $ 2,000 |
RR | 2021 | $ 20,000 | $ 16,000 | $ 4,000 |
New project request from INDOT
1800856 | INDOT | SR 8, Bridge Deck Overlay @.-GRASSMERE DITCH, 2.03mi W of US 421 | Add Project | STP | CN PE | 2021 2019 | $ 493,391 $ 55,200 | $ 394,713 $ 44,160 | $ 98,678 $ 11,040 |
UT | 2020 | $ 10,000 | $ 8,000 | $ 2,000 |
New project request from INDOT
1800841 | INDOT | SR 2, Bridge Deck Overlay @.-CEDAR CREEK, 2.42mi E of US 41 | Add Project | STP | CN PE | 2021 2019 | $ 654,280 $ 73,200 | $ 523,424 $ 58,560 | $ 130,856 $ 14,640 |
UT | 2020 | $ 10,000 | $ 8,000 | $ 2,000 |
New project request from INDOT
1800806 | INDOT | US 12, Bridge Thin Deck Overlay @.-INDIANA HARBOR CANAL, 0.52mi E of US 20 | Add Project | NHPP | CN PE | 2021 2019 | $ 331,912 $ 37,191 | $ 265,530 $ 29,753 | $ 66,382 $ 7,438 |
UT | 2020 | $ 10,000 | $ 8,000 | $ 2,000 |
New project request from INDOT
US 12, Bridge Thin Deck Overlay, US 12/SR | CN | 2021 | $ 482,147 | $ 385,718 | $ 96,430 | ||||
1800696 | INDOT | 912@.-I-90 EB/WB, NICTD RR, 1.27mi E of SR | Add Project | NHPP | PE | 2019 | $ 54,000 | $ 43,200 | $ 10,800 |
312 | UT | 2020 | $ 10,000 | $ 8,000 | $ 2,000 |
New project request from INDOT
CN | 2021 | $ 641,978 | $ 513,582 | $ 128,396 | |||||
1800622 | INDOT | US 41, Bridge Painting @.-CONRAIL RR, IHB RR, & 4 STS, 2.94mi N of I-80 | Add Project | NHPP | PE UT | 2019 2020 | $ 70,800 $ 10,000 | $ 56,640 $ 8,000 | $ 14,160 $ 2,000 |
RR | 2021 | $ 20,000 | $ 16,000 | $ 4,000 |
New project request from INDOT
CN | 2021 | $ 865,981 | $ 692,785 | $ 173,196 | |||||
1800533 | INDOT | SR 912, Bridge Painting @.-CONRAIL RR, 0.19mi E of US 20 | Add Project | STP | PE UT | 2019 2020 | $ 95,520 $ 10,000 | $ 76,416 $ 8,000 | $ 19,104 $ 2,000 |
RR | 2021 | $ 20,000 | $ 16,000 | $ 4,000 |
New project request from INDOT
1800532 | INDOT | US 12, Bridge Painting US 12/SR 912@.-SR 312, 2 RAMPS, 01.27mi W of I-90 | Add Project | NHPP | CN PE | 2021 2019 | $ 845,963 $ 93,312 | $ 676,770 $ 74,650 | $ 169,193 $ 18,662 |
UT | 2020 | $ 10,000 | $ 8,000 | $ 2,000 |
New project request from INDOT
1800850 | INDOT | US 20, Bridge Deck Overlay @.-WILLOW CREEK, 1.60mi E of SR 51 | Add Project | NHPP | CN PE | 2021 2019 | $ 564,956 $ 62,724 | $ 451,965 $ 50,179 | $ 112,991 $ 12,545 |
UT | 2020 | $ 10,000 | $ 8,000 | $ 2,000 |
New project request from INDOT
1800843 | INDOT | US 12, Bridge Deck Overlay WB@.-BURNS DITCH (DEEP RIVER), 0.94mi W of SR 249 | Add Project | NHPP | CN PE | 2021 2019 | $ 799,823 $ 88,800 | $ 639,859 $ 71,040 | $ 159,964 $ 17,760 |
UT | 2020 | $ 10,000 | $ 8,000 | $ 2,000 |
New project request from INDOT
1800842 | INDOT | US 12,Bridge Deck Overlay EB@.-BURNS DITCH (DEEP RIVER), 0.94mi W of SR 249 | Add Project | NHPP | CN PE | 2021 2019 | $ 802,633 $ 89,112 | $ 642,106 $ 71,290 | $ 160,527 $ 17,822 |
UT | 2020 | $ 10,000 | $ 8,000 | $ 2,000 |
New project request from INDOT
CN | 2021 | $ 285,417 | $ 228,334 | $ 57,083 | |||||
1800803 | INDOT | US 12, Bridge Thin Deck Overlay @.-CSX RR, 1.18mi E of US 20 | Add Project | NHPP | PE UT | 2019 2020 | $ 31,981 $ 10,000 | $ 25,585 $ 8,000 | $ 6,396 $ 2,000 |
RR | 2021 | $ 15,000 | $ 12,000 | $ 3,000 |
New project request from INDOT
1800781 | INDOT | US 6, Bridge Thin Deck Overlay @.-BRANCH OF DEEP RIVER, 0.52mi E of the E JCT of SR 51 | Add Project | NHPP | CN 2021 $ 309,060 $ 247,248 $ 61,812 PE 2019 $ 34,630 $ 27,704 $ 6,926
|
UT 2020 $ 10,000 $ 8,000 $ 2,000 |
New project request from INDOT
CN | 2021 | $ 609,335 | $ 487,468 | $ 121,867 | |||||
1800628 | INDOT | US 20, Bridge Painting @.-CSX RR, 1.30mi W of SR 249 | Add Project | NHPP | PE UT | 2019 2020 | $ 67,200 $ 10,000 | $ 53,760 $ 8,000 | $ 13,440 $ 2,000 |
RR | 2021 | $ 20,000 | $ 16,000 | $ 4,000 |
New project request from INDOT
1800847 | INDOT | US 20, Bridge Deck Overlay @.-SALT CREEK, 1.13mi W of SR 149 | Add Project | NHPP | CN 2021 $ 684,725 $ 547,780 $ 136,945 PE 2019 $ 76,010 $ 60,808 $ 15,202
|
UT 2020 $ 10,000 $ 8,000 $ 2,000 |
New project request from INDOT
CN 2021 $ 471,914 $ 424,723 $ 47,191 | ||||
1800695 | INDOT | I 94, Bridge Thin Deck Overlay WB@.-SALT CREEK, 1.25mi W of SR 149 | Add Project | NHPP PE 2019 $ 52,974 $ 47,677 $ 5,297 Interstate |
UT 2020 $ 10,000 $ 9,000 $ 1,000 |
New project request from INDOT
CN 2021 $ 471,914 $ 424,723 $ 47,191 | ||||
1800694 | INDOT | I 94, Bridge Thin Deck Overlay EB@.-SALT CREEK, 1.25mi W of SR 149 | Add Project | NHPP PE 2019 $ 52,974 $ 47,677 $ 5,297 Interstate |
UT 2020 $ 10,000 $ 9,000 $ 1,000 |
New project request from INDOT
CN 2021 $ 484,889 $ 436,400 $ 48,489 | ||||
1800693 | INDOT | I 94, Bridge Thin Deck Overlay WB@.- AMERIPLEX - S ENTRANCE, 0.53mi E of SR 249 | Add Project | NHPP PE 2019 $ 54,431 $ 48,988 $ 5,443 Interstate |
UT 2020 $ 10,000 $ 9,000 $ 1,000 |
New project request from INDOT
CN 2021 $ 484,889 $ 436,400 $ 48,489 | ||||
1800692 | INDOT | I 94, Bridge Thin Deck Overlay EB@.- AMERIPLEX - S ENTRANCE, 0.53mi E of SR 249 | Add Project | NHPP PE 2019 $ 54,431 $ 48,988 $ 5,443 Interstate |
UT 2020 $ 10,000 $ 9,000 $ 1,000 |
New project request from INDOT
CN 2021 $ 701,318 $ 631,186 $ 70,132 | ||||
1800668 | INDOT | I 94, Bridge Thin Deck Overlay WB@.-US 20 EB/WB, 0.88mi E of SR 149 | Add Project | NHPP PE 2019 $ 78,726 $ 70,853 $ 7,873 Interstate |
UT 2020 $ 10,000 $ 9,000 $ 1,000 |
New project request from INDOT
CN 2021 $ 604,038 $ 543,634 $ 60,404 | ||||
1800666 | INDOT | I 94, Bridge Thin Deck Overlay EB@.-US 20 EB/WB, 0.88mi E of SR 149 | Add Project | NHPP PE 2019 $ 67,805 $ 61,025 $ 6,780 Interstate |
UT 2020 $ 10,000 $ 9,000 $ 1,000 |
New project request from INDOT
CN 2021 $ 622,074 $ 559,867 $ 62,207 | ||||
1800855 | INDOT | I 94, Bridge Deck Overlay CR 800N@.-I-94 EB/WB, 2.05mi E of US 20 | Add Project | NHPP PE 2019 $ 78,024 $ 70,222 $ 7,802 Interstate |
UT 2020 $ 10,000 $ 9,000 $ 1,000 |
New project request from INDOT
1800838 | INDOT | US 20, Bridge Deck Overlay @.-TRAIL CREEK, 1.24mi W of US 35 | Add Project | NHPP | CN 2021 $ 689,160 $ 551,328 $ 137,832 PE 2019 $ 86,439 $ 69,151 $ 17,288
|
UT 2020 $ 10,000 $ 8,000 $ 2,000 |
New project request from INDOT
CN | 2021 | $ 1,515,651 | $ 1,364,086 | $ 151,565 | |||||
1800837 | INDOT | I 94, Bridge Deck Overlay WB@.-N&S RR, 0.45mi W of US 20/35 | Add Project | NHPP Interstate | PE UT | 2019 2020 | $ 190,102 $ 10,000 | $ 171,092 $ 9,000 | $ 19,010 $ 1,000 |
RR | 2021 | $ 12,500 | $ 11,250 | $ 1,250 |
New project request from INDOT
CN | 2021 | $ 1,515,651 | $ 1,364,086 | $ 151,565 | |||||
1800836 | INDOT | I 94, Bridge Deck Overlay EB@.-N&S RR, 0.45mi W of US 20/35 | Add Project | NHPP Interstate | PE UT | 2019 2020 | $ 190,102 $ 10,000 | $ 171,092 $ 9,000 | $ 19,010 $ 1,000 |
RR | 2021 | $ 12,500 | $ 11,250 | $ 1,250 |
New project request from INDOT
CN 2021 $ 1,495,331 $ 1,345,798 $ 149,533 | ||||
1800835 | INDOT | I 94, Bridge Deck Overlay CR 400N@.-I-94 EB/WB, NORRIS DITCH, 1.76mi E of US 421 | Add Project | NHPP PE 2019 $ 187,553 $ 168,798 $ 18,755 Interstate |
UT 2020 $ 10,000 $ 9,000 $ 1,000 |
New project request from INDOT
CN 2021 $ 919,459 $ 827,513 $ 91,946 | ||||
1800636 | INDOT | I 94, Bridge Painting WB@.-US 20/35 EB/WB, 5.37mi E of US 421 | Add Project | NHPP PE 2019 $ 101,760 $ 91,584 $ 10,176 Interstate |
UT 2020 $ 10,000 $ 9,000 $ 1,000 |
New project request from INDOT
CN 2021 $ 919,459 $ 827,513 $ 91,946 | ||||
1800635 | INDOT | I 94, Bridge Painting EB@.-US 20/35 EB/WB, 5.37mi E of US 421 | Add Project | NHPP PE 2019 $ 101,760 $ 91,584 $ 10,176 Interstate |
UT 2020 $ 10,000 $ 9,000 $ 1,000 |
New project request from INDOT
1800858 | INDOT | US 30, Bridge Deck Overlay @.-SLOCUM DITCH, 0.50mi W of US 421 | Add Project | NHPP | CN 2021 $ 493,391 $ 394,713 $ 98,678 PE 2019 $ 62,128 $ 49,702 $ 12,427
|
UT 2020 $ 10,000 $ 8,000 $ 2,000 |
New project request from INDOT
1800848 | INDOT | SR 2, Bridge Deck Overlay @.-SALT CREEK, 0.78mi W of US 30 | Add Project | STP | CN 2021 $ 525,569 $ 420,455 $ 105,114 PE 2019 $ 66,180 $ 52,944 $ 13,236
|
UT 2020 $ 10,000 $ 8,000 $ 2,000 |
New project request from INDOT
CN | 2021 | $ 330,514 | $ 264,411 | $ 66,103 | |||||
1800816 | INDOT | SR 49, Bridge Thin Deck Overlay @.-NICTD RR, TRAIL, 0.05mi N of US 12 | Add Project | STP | PE UT | 2019 2020 | $ 41,729 $ 10,000 | $ 33,383 $ 8,000 | $ 8,346 $ 2,000 |
RR | 2021 | $ 15,000 | $ 12,000 | $ 3,000 |
New project request from INDOT
SR 49, Bridge Thin Deck Overlay CR | CN | 2021 | $ 337,968 | $ 270,374 | $ 67,594 | ||||
1800804 | INDOT | 400N/VALE RD@.-SR 49 NB/SB, 1.57mi N of | Add Project | STP | PE | 2019 | $ 42,670 | $ 34,136 | $ 8,534 |
SR 2 | UT | 2020 | $ 10,000 | $ 8,000 | $ 2,000 |
New project request from INDOT
1800792 | INDOT | US 6, Bridge Thin Deck Overlay WB@.-SR 49 SB/NB, 4.06mi E of SR 149 | Add Project | NHPP | CN PE | 2021 2019 | $ 297,499 $ 37,560 | $ 237,999 $ 30,048 | $ 59,500 $ 7,512 |
UT | 2020 | $ 10,000 | $ 8,000 | $ 2,000 |
New project request from INDOT
1800791 | INDOT | US 6, Bridge Thin Deck Overlay EB@.-SR 49 SB/NB, 4.06mi E of SR 149 | Add Project | NHPP | CN PE | 2021 2019 | $ 297,499 $ 37,560 | $ 237,999 $ 30,048 | $ 59,500 $ 7,512 |
UT | 2020 | $ 10,000 | $ 8,000 | $ 2,000 |
New project request from INDOT
CN | 2021 | $ 421,296 | $ 337,037 | $ 84,259 | |||||
1800775 | INDOT | SR 2, Bridge Painting @.-CSX RR, 2.80mi W of US 6 | Add Project | STP | PE UT | 2019 2020 | $ 63,747 $ 10,000 | $ 50,998 $ 8,000 | $ 12,749 $ 2,000 |
RR | 2021 | $ 20,000 | $ 16,000 | $ 4,000 |
New project request from INDOT
CN | 2021 | $ 463,962 | $ 371,170 | $ 92,792 | |||||
1800688 | INDOT | US 421, Bridge Painting @.-CF&E RR, BAILEY RD, ROAD, 0.37mi S of US 30 | Add Project | NHPP | PE UT | 2019 2020 | $ 69,646 $ 10,000 | $ 55,717 $ 8,000 | $ 13,929 $ 2,000 |
RR | 2021 | $ 20,000 | $ 16,000 | $ 4,000 |
New project request from INDOT
CN | 2021 | $ 513,595 | $ 410,876 | $ 102,719 | |||||
1800686 | INDOT | SR 49, Bridge Painting SB@.-COMFORD ROAD, CFE RR, 0.21mi S of US 30 | Add Project | STP | PE UT | 2019 2020 | $ 64,622 $ 10,000 | $ 51,698 $ 8,000 | $ 12,924 $ 2,000 |
RR | 2021 | $ 20,000 | $ 16,000 | $ 4,000 |
New project request from INDOT
CN | 2021 | $ 561,071 | $ 448,857 | $ 112,214 | |||||
1800684 | INDOT | SR 49, Bridge Painting NB@.-COMFORD ROAD, CFE RR, 0.21mi S of US 30 | Add Project | STP | PE UT | 2019 2020 | $ 70,596 $ 10,000 | $ 56,477 $ 8,000 | $ 14,119 $ 2,000 |
RR | 2021 | $ 20,000 | $ 16,000 | $ 4,000 |
New project request from INDOT
CN | 2021 | $ 542,728 | $ 434,182 | $ 108,546 | |||||
1800683 | INDOT | SR 49, Bridge Painting SB@.-N&S RR, 0.50mi S of US 30 | Add Project | STP | PE UT | 2019 2020 | $ 68,288 $ 10,000 | $ 54,630 $ 8,000 | $ 13,658 $ 2,000 |
RR | 2021 | $ 20,000 | $ 16,000 | $ 4,000 |
New project request from INDOT
CN | 2021 | $ 542,728 | $ 434,182 | $ 108,546 | |||||
1800682 | INDOT | SR 49, Bridge Painting NB@.-N&S RR, 0.50mi S of US 30 | Add Project | STP | PE UT | 2019 2020 | $ 68,288 $ 10,000 | $ 54,630 $ 8,000 | $ 13,658 $ 2,000 |
RR | 2021 | $ 20,000 | $ 16,000 | $ 4,000 |
New project request from INDOT
1800809 | INDOT | I 80, Bridge Thin Deck Overlay SR 152 SB TO I- 80 EB@.-US 41 S/SR 152 N, RAMP, 00.15mi S of I-80/94 | Add Project | CN 2021 $ 320,816 $ 288,734 $ 32,082 NHPP PE 2019 $ 24,000 $ 21,600 $ 2,400 Interstate UT 2020 $ 10,000 $ 9,000 $ 1,000 |
New project request from INDOT
1800802 | INDOT | US 41, Bridge Deck Overlay @.-LITTLE CALUMET RIVER, 0.51mi S of I-80 | Add Project | NHPP | CN 2021 $ 852,913 $ 682,333 $ 170,583 PE 2019 $ 68,233 $ 54,586 $ 13,647
|
UT 2020 $ 10,000 $ 8,000 $ 2,000 |
New project request from INDOT
CN 2021 $ 375,554 $ 337,999 $ 37,555 | ||||
1800801 | INDOT | I 80, Bridge Thin Deck Overlay CHASE STREET@.-I-80/94 EB/WB, 2.03mi W of SR 53 | Add Project | NHPP PE 2019 $ 30,044 $ 27,040 $ 3,004 Interstate |
UT 2020 $ 10,000 $ 9,000 $ 1,000 |
New project request from INDOT
1800786 | INDOT | I 80, Bridge Thin Deck Overlay MARTIN LUTHER KING DR @.-I-80 EB/WB, I-80 W RAMP, 0.93mi E of SR 53 | Add Project | CN 2021 $ 627,062 $ 564,356 $ 62,706 NHPP PE 2019 $ 46,751 $ 42,076 $ 4,675 Interstate UT 2020 $ 10,000 $ 9,000 $ 1,000 |
New project request from INDOT
CN 2021 $ 497,743 $ 447,969 $ 49,774 | ||||
1800784 | INDOT | I 80, Bridge Thin Deck Overlay I-80/94 WB@.- HARRISON AVENUE, 0.38mi W of US 41 | Add Project | NHPP PE 2019 $ 37,110 $ 33,399 $ 3,711 Interstate |
UT 2020 $ 10,000 $ 9,000 $ 1,000 |
New project request from INDOT
CN 2021 $ 497,098 $ 447,388 $ 49,710 | ||||
1800783 | INDOT | I 80, Bridge Thin Deck Overlay I-80/94 EB@.- HARRISON AVENUE, 0.38mi W of US 41 | Add Project | NHPP PE 2019 $ 37,061 $ 33,355 $ 3,706 Interstate |
UT 2020 $ 10,000 $ 9,000 $ 1,000 |
New project request from INDOT
CN 2021 $ 465,265 $ 418,739 $ 46,526 | ||||
1800691 | INDOT | I 80, Bridge Painting WB RAMP I@.-I-80/94 EB/WB, CD RAMPS, 0.95mi E of US 41 | Add Project | NHPP PE 2019 $ 34,240 $ 30,816 $ 3,424 Interstate |
UT 2020 $ 10,000 $ 9,000 $ 1,000 |
New project request from INDOT
CN 2021 $ 800,914 $ 720,823 $ 80,091 | ||||
1800639 | INDOT | I 80, Bridge Thin Deck Overlay EB/WB@.-SR 912 EB/WB, RAMPS, 2.53mi E of US 41 | Add Project | NHPP PE 2019 $ 59,685 $ 53,717 $ 5,968 Interstate |
UT 2020 $ 10,000 $ 9,000 $ 1,000 |
New project request from INDOT
1700523 | INDOT | Clark Rd DOT #522646H and #155645N CSX in Gary | Add Project | NHPP Interstate | CN PE | 2019 2019 | $ 400,000 $ 40,000 | $ 360,000 $ 36,000 | $ 40,000 $ 4,000 |
New project request from INDOT
1801500 | INDOT | I 65, Bridge Substructure Repair and Rehabilitation; Over 109th Ave; 3.53 miles S of US 30 | Add Project | CN 2019 $ 691,654 $ - $ 691,654 NHPP PE 2019 $ 297,000 $ - $ 297,000 Interstate UT 2019 $ - $ - $ - |
New project request from INDOT