FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2021 | CMAQ Chicago UZA | $0 | $0 | $997,934 | $0 | $997,934 |
2021 | Local Fund | $0 | $0 | $249,487 | $0 | $249,487 |
2020-2024 TOTAL | $0 | $0 | $1,247,421 | $0 | $1,247,421 | |
ALL YEARS TOTAL | $0 | $0 | $1,247,421 | $0 | $1,247,421 |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2021 | CMAQ Chicago UZA | $0 | $0 | $997,934 | $0 | $997,934 |
2021 | Local Fund | $0 | $0 | $249,487 | $0 | $249,487 |
2018-2022 TOTAL | $0 | $0 | $1,247,421 | $0 | $1,247,421 | |
ALL YEARS TOTAL | $0 | $0 | $1,247,421 | $0 | $1,247,421 |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2021 | CMAQ Chicago UZA | $0 | $0 | $997,934 | $0 | $997,934 |
2021 | Local Fund | $0 | $0 | $249,487 | $0 | $249,487 |
2018-2022 TOTAL | $0 | $0 | $1,247,421 | $0 | $1,247,421 | |
ALL YEARS TOTAL | $0 | $0 | $1,247,421 | $0 | $1,247,421 |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2021 | CMAQ Chicago UZA | $0 | $0 | $997,934 | $0 | $997,934 |
2021 | Local Fund | $0 | $0 | $249,487 | $0 | $249,487 |
2020-2024 TOTAL | $0 | $0 | $1,247,421 | $0 | $1,247,421 | |
ALL YEARS TOTAL | $0 | $0 | $1,247,421 | $0 | $1,247,421 |
1601147 (Ver 2) 20-00 STATUS Programmed | FEDERAL | ||
Title: Multi-use Trail Program / Bike/Pedestrian Facilities at Marquette Trail | Route: N/A | ||
Description: Marquette Greenway Trail portion within limits of Burns Harbor, SR149 to Babcock Rd | |||
Project Type: Bicycle Enhancement AQ Exempt: Non-Exempt | District: LaPorte | ||
County: Porter Limits: Marquette Trail from 0 to 0 of Distance (mile) 1.4 | |||
Region: Northwestern MPO | Lead Agency: | Burns Harbor | |
Previously Approved Version | |||
1601147 (Ver 1) 18-12 | |||
Title: Bike/Pedestrian Facilities at Marquette Trail | Route: N/A | ||
Description: Marquette Greenway Trail portion within limits of Burns Harbor, SR149 to Babcock Rd | |||
Project Type: Bicycle Enhancement AQ Exempt: Non-Exempt | District: LaPorte | ||
County: Porter Limits: Marquette Trail from 0 to 0 of Distance (mile) 1.4 | |||
Region: Northwestern MPO | Lead Agency: | Burns Harbor | |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2021 | HSIP Chicago UZA | $0 | $0 | $564,213 | $0 | $564,213 |
2021 | Local Fund | $0 | $0 | $62,690 | $0 | $62,690 |
2020-2024 TOTAL | $0 | $0 | $626,903 | $0 | $626,903 | |
ALL YEARS TOTAL | $0 | $0 | $626,903 | $0 | $626,903 |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2021 | HSIP Chicago UZA | $0 | $0 | $564,213 | $0 | $564,213 |
2021 | Local Fund | $0 | $0 | $62,690 | $0 | $62,690 |
2020-2024 TOTAL | $0 | $0 | $626,903 | $0 | $626,903 | |
ALL YEARS TOTAL | $0 | $0 | $626,903 | $0 | $626,903 |
NIRPC26004 (Ver 1) 20-00 STATUS New Project FEDERAL |
Title: Intersection Improvement 133rd Ave & King Dr Route: N/A Description: New Signals at 133rd and Kings Dr, in front of the High School. This will make it safe for children to cross the street. Project Type: New Signalization AQ Exempt: Exempt District: LaPorte County: Lake Limits: Nearest Crossstreet: King Dr |
Region: Northwestern MPO Lead Agency: Cedar Lake |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2021 | Local Fund | $0 | $21,094 | $0 | $0 | $21,094 |
2021 | TAP Chicago UZA | $0 | $84,375 | $0 | $0 | $84,375 |
2024 | Local Fund | $0 | $0 | $352,000 | $0 | $352,000 |
2024 | TAP Chicago UZA | $0 | $0 | $1,125,000 | $0 | $1,125,000 |
2020-2024 TOTAL | $0 | $105,469 | $1,477,000 | $0 | $1,582,469 | |
ALL YEARS TOTAL | $0 | $105,469 | $1,477,000 | $0 | $1,582,469 |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2021 | Local Fund | $0 | $21,094 | $0 | $0 | $21,094 |
2021 | TAP Chicago UZA | $0 | $84,375 | $0 | $0 | $84,375 |
2024 | Local Fund | $0 | $0 | $352,000 | $0 | $352,000 |
2024 | TAP Chicago UZA | $0 | $0 | $1,125,000 | $0 | $1,125,000 |
2020-2024 TOTAL | $0 | $105,469 | $1,477,000 | $0 | $1,582,469 | |
ALL YEARS TOTAL | $0 | $105,469 | $1,477,000 | $0 | $1,582,469 |
NIRPC16004 (Ver 1) 20-00 STATUS New Project FEDERAL |
Title: Multi-use paths / Westchester-Liberty Phase 3 Route: N/A Description: The construction of Phase 3 of the Westchester-Liberty trail will complete the connection between the Prairie Duneland Trail and the Dunes-Kankakee Trail, both of which are High Priority Trails as identified by NIRPC. This project will extend the existing 8-foot the Westchester-Liberty south through an existing park to connect to an existing 8' multi-use trail which will allow the users to safely access the Coffee Creek Watershed Preserve from west of S.R. 49. shared-use Westchester Liberty Trail along County Road (CR) 1100 North from the existing path's termination point on S 5th Street and continue east approximately 2,355 feet to CR 100 E where it will connect to the Dunes Kankakee Trail. This project will also extend the Westchester-Liberty south through an existing park to connect to an existing 8' multi-use trail which will allow the users to safely access the Coffee Creek Watershed Preserve from west of S.R. 49. Project Type: Other AQ Exempt: Non-Exempt District: LaPorte County: Porter Limits: Westchester-Liberty from 5th Street to CR 100 E of Distance (mile) 0.98 |
Region: Northwestern MPO Lead Agency: Chesterton |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2020 | HSIP Chicago UZA | $0 | $112,500 | $0 | $0 | $112,500 |
2020 | Local Fund | $0 | $12,500 | $0 | $0 | $12,500 |
2021 | HSIP Chicago UZA | $0 | $0 | $1,138,500 | $0 | $1,138,500 |
2021 | Local Fund | $0 | $0 | $126,500 | $0 | $126,500 |
<2020 | Prior | $295,267 | $0 | $0 | $0 | $295,267 |
2020-2024 TOTAL | $0 | $125,000 | $1,265,000 | $0 | $1,390,000 | |
ALL YEARS TOTAL | $295,267 | $125,000 | $1,265,000 | $0 | $1,685,267 |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2020 | HSIP Chicago UZA | $0 | $112,500 | $0 | $0 | $112,500 |
2020 | Local Fund | $0 | $12,500 | $0 | $0 | $12,500 |
2021 | HSIP Chicago UZA | $0 | $0 | $1,138,500 | $0 | $1,138,500 |
2021 | Local Fund | $0 | $0 | $126,500 | $0 | $126,500 |
<2020 | Prior | $295,267 | $0 | $0 | $0 | $295,267 |
2020-2024 TOTAL | $0 | $125,000 | $1,265,000 | $0 | $1,390,000 | |
ALL YEARS TOTAL | $295,267 | $125,000 | $1,265,000 | $0 | $1,685,267 |
1601158 (Ver 2) 20-00 STATUS Programmed | FEDERAL | |
Title: Roadway Improvement Program / Intersection Improvements (Roundabout) at 109th Ave at Iowa St. | Route: N/A | |
Description: 109th is a very busy road with a high crash count. This will improve traffic flow and make this intersection safer. | ||
Project Type: Intersection or Intersection Groups AQ Exempt: Non-Exempt | District: LaPorte | |
County: Lake Limits: Primary Crossstreet: 109th, Secondary Crossstreet: Iowa | ||
Region: Northwestern MPO Lead Agency: | Crown Point |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2018 | HSIP Chicago UZA | $265,740 | $0 | $0 | $0 | $265,740 |
2018 | Local Fund | $29,527 | $0 | $0 | $0 | $29,527 |
2020 | HSIP Chicago UZA | $0 | $112,500 | $0 | $0 | $112,500 |
2020 | Local Fund | $0 | $12,500 | $0 | $0 | $12,500 |
2021 | HSIP Chicago UZA | $0 | $0 | $1,138,500 | $0 | $1,138,500 |
2021 | Local Fund | $0 | $0 | $126,500 | $0 | $126,500 |
2018-2022 TOTAL | $295,267 | $125,000 | $1,265,000 | $0 | $1,685,267 | |
ALL YEARS TOTAL | $295,267 | $125,000 | $1,265,000 | $0 | $1,685,267 |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2018 | HSIP Chicago UZA | $265,740 | $0 | $0 | $0 | $265,740 |
2018 | Local Fund | $29,527 | $0 | $0 | $0 | $29,527 |
2020 | HSIP Chicago UZA | $0 | $112,500 | $0 | $0 | $112,500 |
2020 | Local Fund | $0 | $12,500 | $0 | $0 | $12,500 |
2021 | HSIP Chicago UZA | $0 | $0 | $1,138,500 | $0 | $1,138,500 |
2021 | Local Fund | $0 | $0 | $126,500 | $0 | $126,500 |
2018-2022 TOTAL | $295,267 | $125,000 | $1,265,000 | $0 | $1,685,267 | |
ALL YEARS TOTAL | $295,267 | $125,000 | $1,265,000 | $0 | $1,685,267 |
Previously Approved Version |
1601158 (Ver 1) 18-13.2 |
Title: Intersect. Improvements (Roundabout) at 109th Ave Route: N/A Description: at Iowa St. 109th is a very busy road with a high crash count. This will improve traffic flow and make this intersection safer. Project Type: Intersection or Intersection Groups AQ Exempt: Non-Exempt District: LaPorte County: Lake Limits: Primary Crossstreet: 109th, Secondary Crossstreet: Iowa |
Region: Northwestern MPO Lead Agency: Crown Point |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2022 | HSIP Chicago UZA | $0 | $0 | $972,500 | $0 | $972,500 |
2022 | Local Fund | $0 | $0 | $192,500 | $0 | $192,500 |
2020-2024 TOTAL | $0 | $0 | $1,165,000 | $0 | $1,165,000 | |
ALL YEARS TOTAL | $0 | $0 | $1,165,000 | $0 | $1,165,000 |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2022 | HSIP Chicago UZA | $0 | $0 | $972,500 | $0 | $972,500 |
2022 | Local Fund | $0 | $0 | $192,500 | $0 | $192,500 |
2020-2024 TOTAL | $0 | $0 | $1,165,000 | $0 | $1,165,000 | |
ALL YEARS TOTAL | $0 | $0 | $1,165,000 | $0 | $1,165,000 |
NIRPC26004 (Ver 1) 20-00 STATUS New Project | FEDERAL | ||
Title: Intersection Improvement-Roundabout US 231 & 113th | Route: N/A | ||
Description: Roundabout at US 231 and 113th. This will improve safety and congestion. | |||
Project Type: Intersection or Intersection Groups AQ Exempt: Exempt | District: LaPorte | ||
County: Lake Limits: | |||
Region: Northwestern MPO | Lead Agency: | Crown Point |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2020 | HSIP Chicago UZA | $0 | $0 | $1,098,000 | $0 | $1,098,000 |
2020 | Local Fund | $0 | $0 | $122,000 | $0 | $122,000 |
<2020 | Prior | $335,773 | $296,800 | $0 | $0 | $632,573 |
2020-2024 TOTAL | $0 | $0 | $1,220,000 | $0 | $1,220,000 | |
ALL YEARS TOTAL | $335,773 | $296,800 | $1,220,000 | $0 | $1,852,573 |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2020 | HSIP Chicago UZA | $0 | $0 | $1,098,000 | $0 | $1,098,000 |
2020 | Local Fund | $0 | $0 | $122,000 | $0 | $122,000 |
<2020 | Prior | $335,773 | $296,800 | $0 | $0 | $632,573 |
2020-2024 TOTAL | $0 | $0 | $1,220,000 | $0 | $1,220,000 | |
ALL YEARS TOTAL | $335,773 | $296,800 | $1,220,000 | $0 | $1,852,573 |
1601157 (Ver 4) 20-00 STATUS In Progress - Programmed FEDERAL |
Title: Roadway Improvement Program / 109th Ave, Delaware Pkwy to SR 53, includes median construction Route: N/A Description: 109th Ave Access Control, Delaware Pkwy to SR 53, includes median construction in Crown Point. This will improve the congestion and flow of traffic in this area. This project is exempt from the requirement to determine conformity. This project is expected to be substantially complete by November 15, 2020. Project Type: Roadway Reconstruction/Rehabilitation AQ Exempt: Non-Exempt District: LaPorte County: Lake Limits: From Derlaware Pkwy to Broadway of Distance (mile) 0.29 |
Region: Northwestern MPO Lead Agency: Crown Point |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2018 | HSIP Chicago UZA | $36,455 | $0 | $0 | $0 | $36,455 |
2018 | Local Fund | $4,051 | $0 | $0 | $0 | $4,051 |
2019 | HSIP Chicago UZA | $0 | $267,120 | $0 | $0 | $267,120 |
2019 | Local Fund | $0 | $29,680 | $0 | $0 | $29,680 |
2020 | HSIP Chicago UZA | $0 | $0 | $1,098,000 | $0 | $1,098,000 |
2020 | Local Fund | $0 | $0 | $122,000 | $0 | $122,000 |
<2018 | Prior | $295,267 | $0 | $0 | $0 | $295,267 |
2018-2022 TOTAL | $40,506 | $296,800 | $1,220,000 | $0 | $1,557,306 | |
ALL YEARS TOTAL | $335,773 | $296,800 | $1,220,000 | $0 | $1,852,573 |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2018 | HSIP Chicago UZA | $36,455 | $0 | $0 | $0 | $36,455 |
2018 | Local Fund | $4,051 | $0 | $0 | $0 | $4,051 |
2019 | HSIP Chicago UZA | $0 | $267,120 | $0 | $0 | $267,120 |
2019 | Local Fund | $0 | $29,680 | $0 | $0 | $29,680 |
2020 | HSIP Chicago UZA | $0 | $0 | $1,098,000 | $0 | $1,098,000 |
2020 | Local Fund | $0 | $0 | $122,000 | $0 | $122,000 |
<2018 | Prior | $295,267 | $0 | $0 | $0 | $295,267 |
2018-2022 TOTAL | $40,506 | $296,800 | $1,220,000 | $0 | $1,557,306 | |
ALL YEARS TOTAL | $335,773 | $296,800 | $1,220,000 | $0 | $1,852,573 |
Previously Approved Version |
1601157 (Ver 3) 18-14 |
Title: Access Control at 109th Ave Route: N/A Description: 109th Ave Access Control, Delaware Pkwy to SR 53, includes median construction in Crown Point. THis will improve the congestion and flow of traffic in this area. This project is exempt from the requirement to determine conformity. this project is expected to be substantially complete by November 15, 2020. Project Type: Roadway Reconstruction/Rehabilitation AQ Exempt: Non-Exempt District: LaPorte County: Lake Limits: From Derlaware Pkwy to Broadway of Distance (mile) 0.29 |
Region: Northwestern MPO Lead Agency: Crown Point |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2020 | TAP State | $10,000 | $0 | $100,000 | $0 | $110,000 |
2021 | TAP State | $0 | $0 | $60,000 | $0 | $60,000 |
<2020 | Prior | $15,000 | $25,000 | $0 | $0 | $40,000 |
2020-2024 TOTAL | $10,000 | $0 | $160,000 | $0 | $170,000 | |
ALL YEARS TOTAL | $25,000 | $25,000 | $160,000 | $0 | $210,000 |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2019 | TAP State | $15,000 | $25,000 | $0 | $0 | $40,000 |
2020 | TAP State | $10,000 | $0 | $100,000 | $0 | $110,000 |
2021 | TAP State | $0 | $0 | $60,000 | $0 | $60,000 |
2018-2022 TOTAL | $25,000 | $25,000 | $160,000 | $0 | $210,000 | |
ALL YEARS TOTAL | $25,000 | $25,000 | $160,000 | $0 | $210,000 |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2019 | TAP State | $15,000 | $25,000 | $0 | $0 | $40,000 |
2020 | TAP State | $10,000 | $0 | $100,000 | $0 | $110,000 |
2021 | TAP State | $0 | $0 | $60,000 | $0 | $60,000 |
2018-2022 TOTAL | $25,000 | $25,000 | $160,000 | $0 | $210,000 | |
ALL YEARS TOTAL | $25,000 | $25,000 | $160,000 | $0 | $210,000 |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2020 | TAP State | $10,000 | $0 | $100,000 | $0 | $110,000 |
2021 | TAP State | $0 | $0 | $60,000 | $0 | $60,000 |
<2020 | Prior | $15,000 | $25,000 | $0 | $0 | $40,000 |
2020-2024 TOTAL | $10,000 | $0 | $160,000 | $0 | $170,000 | |
ALL YEARS TOTAL | $25,000 | $25,000 | $160,000 | $0 | $210,000 |
1801757 (Ver 2) 20-00 STATUS | Programmed | FEDERAL | |||
Title: Marquette Greenway Trail connector | Route: N/A | ||||
Description: Connector link to connect Burns Harbor to Trail | |||||
Project Type: Bicycle Enhancement AQ Exempt: | Exempt | District: LaPorte | |||
County: Porter Limits: Not Location Specific | |||||
Region: Northwestern MPO | Lead Agency: | DNR | |||
Previously Approved Version | |||||
1801757 (Ver 1) 18-10 | |||||
Title: Marquette Greenway Trail connector | Route: N/A | ||||
Description: Connector link to connect Burns Harbor to Trail | |||||
Project Type: Bicycle Enhancement AQ Exempt: | Exempt | District: LaPorte | |||
County: Porter Limits: Not Location Specific | |||||
Region: Northwestern MPO | Lead Agency: | DNR |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2021 | CMAQ Chicago UZA | $0 | $0 | $828,000 | $0 | $828,000 |
2021 | Local Fund | $0 | $0 | $207,000 | $0 | $207,000 |
<2020 | Prior | $309,800 | $0 | $0 | $0 | $309,800 |
2020-2024 TOTAL | $0 | $0 | $1,035,000 | $0 | $1,035,000 | |
ALL YEARS TOTAL | $309,800 | $0 | $1,035,000 | $0 | $1,344,800 |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2021 | CMAQ Chicago UZA | $0 | $0 | $828,000 | $0 | $828,000 |
2021 | Local Fund | $0 | $0 | $207,000 | $0 | $207,000 |
<2020 | Prior | $309,800 | $0 | $0 | $0 | $309,800 |
2020-2024 TOTAL | $0 | $0 | $1,035,000 | $0 | $1,035,000 | |
ALL YEARS TOTAL | $309,800 | $0 | $1,035,000 | $0 | $1,344,800 |
1601146 (Ver 3) 20-00 STATUS Programmed | FEDERAL | |
Title: Multi-use Trails Program / Bike/Pedestrian Facilities at Marquette Trail | Route: N/A | |
Description: From Indianapolis Blvd. (US 20) to Kennedy Ave | ||
Project Type: Bicycle Enhancement AQ Exempt: Non-Exempt | District: LaPorte | |
County: Lake Limits: Marquette Trail from Indianapolis Blvd to Kennedy Ave of Distance (mile) 0.7 | ||
Region: Northwestern MPO Lead Agency: | East Chicago |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2019 | CMAQ Chicago UZA | $247,840 | $0 | $0 | $0 | $247,840 |
2019 | Local Fund | $61,960 | $0 | $0 | $0 | $61,960 |
2020 | CMAQ Chicago UZA | $0 | $0 | $828,000 | $0 | $828,000 |
2020 | Local Fund | $0 | $0 | $207,000 | $0 | $207,000 |
2018-2022 TOTAL | $309,800 | $0 | $1,035,000 | $0 | $1,344,800 | |
ALL YEARS TOTAL | $309,800 | $0 | $1,035,000 | $0 | $1,344,800 |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2019 | CMAQ Chicago UZA | $247,840 | $0 | $0 | $0 | $247,840 |
2019 | Local Fund | $61,960 | $0 | $0 | $0 | $61,960 |
2020 | CMAQ Chicago UZA | $0 | $0 | $828,000 | $0 | $828,000 |
2020 | Local Fund | $0 | $0 | $207,000 | $0 | $207,000 |
2018-2022 TOTAL | $309,800 | $0 | $1,035,000 | $0 | $1,344,800 | |
ALL YEARS TOTAL | $309,800 | $0 | $1,035,000 | $0 | $1,344,800 |
Previously Approved Version | ||
1601146 (Ver 2) 18-07 | ||
Title: Bike/Pedestrian Facilities at Marquette Trail | Route: N/A | |
Description: from Indinapolis Blvd. (US 20) to Kennedy Ave | ||
Project Type: Bicycle Enhancement AQ Exempt: Non-Exempt | District: LaPorte | |
County: Lake Limits: Marquette Trail from Indianapolis Blvd to Kennedy Ave of Distance (mile) 0.7 | ||
Region: Northwestern MPO Lead Agency: | East Chicago |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2020 | Local Fund | $0 | $0 | $1,250,000 | $0 | $1,250,000 |
2020 | State Match | $0 | $0 | $1,000,000 | $0 | $1,000,000 |
2020-2024 TOTAL | $0 | $0 | $2,250,000 | $0 | $2,250,000 | |
ALL YEARS TOTAL | $0 | $0 | $2,250,000 | $0 | $2,250,000 |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2020 | Local Fund | $0 | $0 | $1,250,000 | $0 | $1,250,000 |
2020 | State Match | $0 | $0 | $1,000,000 | $0 | $1,000,000 |
2018-2022 TOTAL | $0 | $0 | $2,250,000 | $0 | $2,250,000 | |
ALL YEARS TOTAL | $0 | $0 | $2,250,000 | $0 | $2,250,000 |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2020 | Local Fund | $0 | $0 | $1,250,000 | $0 | $1,250,000 |
2020 | State Match | $0 | $0 | $1,000,000 | $0 | $1,000,000 |
2018-2022 TOTAL | $0 | $0 | $2,250,000 | $0 | $2,250,000 | |
ALL YEARS TOTAL | $0 | $0 | $2,250,000 | $0 | $2,250,000 |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2020 | Local Fund | $0 | $0 | $1,250,000 | $0 | $1,250,000 |
2020 | State Match | $0 | $0 | $1,000,000 | $0 | $1,000,000 |
2020-2024 TOTAL | $0 | $0 | $2,250,000 | $0 | $2,250,000 | |
ALL YEARS TOTAL | $0 | $0 | $2,250,000 | $0 | $2,250,000 |
0901321 (Ver 2) 20-00 STATUS Programmed | STATE | ||
Title: Intersection Improvement at ST1001 | Route: N/A | ||
Description: 129th & Dickey Rd., 129th & Broad St. | |||
Project Type: Intersection or Intersection Groups AQ Exempt: Non-Exempt | District: LaPorte | ||
County: Lake Limits: Primary Crossstreet: 129th, Secondary Crossstreet: Dickey Rd | |||
Region: Northwestern MPO | Lead Agency: | East Chicago | |
Previously Approved Version | |||
0901321 (Ver 1) 18-00 | |||
Title: Intersection Improvement at ST1001 | Route: N/A | ||
Description: 129th & Dickey Rd., 129th & Broad St. | |||
Project Type: Intersection or Intersection Groups AQ Exempt: Non-Exempt | District: LaPorte | ||
County: Lake Limits: Primary Crossstreet: 129th, Secondary Crossstreet: Dickey Rd | |||
Region: Northwestern MPO | Lead Agency: | East Chicago | |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2020 | SMFR | $0 | $0 | $4,948,786 | $0 | $4,948,786 |
<2020 | Prior | $843,920 | $0 | $0 | $0 | $843,920 |
2020-2024 TOTAL | $0 | $0 | $4,948,786 | $0 | $4,948,786 | |
ALL YEARS TOTAL | $843,920 | $0 | $4,948,786 | $0 | $5,792,706 |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2020 | SMFR | $0 | $0 | $4,948,786 | $0 | $4,948,786 |
<2020 | Prior | $843,920 | $0 | $0 | $0 | $843,920 |
2020-2024 TOTAL | $0 | $0 | $4,948,786 | $0 | $4,948,786 | |
ALL YEARS TOTAL | $843,920 | $0 | $4,948,786 | $0 | $5,792,706 |
0900064 (Ver 2) 20-00 STATUS Programmed FEDERAL |
Title: Road Rehab Route: N/A Description: Indy Blvd from McShane Dr to Michigan St. This project will repair the pavement on Indianapolis Blvd adding complete streets and help with underground infrastructure Project Type: Roadway Reconstruction/Rehabilitation AQ Exempt: Exempt District: LaPorte County: Lake Limits: From McShane Drive to Michigan Street of Distance (mile) 2.3 |
Region: Northwestern MPO Lead Agency: East Chicago |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2018 | DEMO | $457,522 | $0 | $0 | $0 | $457,522 |
2018 | Local Fund | $127,184 | $0 | $0 | $0 | $127,184 |
2018 | SMFR | $10,243 | $0 | $0 | $0 | $10,243 |
2018 | State Special Projects | $40,971 | $0 | $0 | $0 | $40,971 |
2020 | SMFR | $0 | $0 | $4,948,786 | $0 | $4,948,786 |
<2018 | Prior | $208,000 | $0 | $0 | $0 | $208,000 |
2018-2022 TOTAL | $635,920 | $0 | $4,948,786 | $0 | $5,584,706 | |
ALL YEARS TOTAL | $843,920 | $0 | $4,948,786 | $0 | $5,792,706 |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2018 | DEMO | $457,522 | $0 | $0 | $0 | $457,522 |
2018 | Local Fund | $127,184 | $0 | $0 | $0 | $127,184 |
2018 | SMFR | $10,243 | $0 | $0 | $0 | $10,243 |
2018 | State Special Projects | $40,971 | $0 | $0 | $0 | $40,971 |
2020 | SMFR | $0 | $0 | $4,948,786 | $0 | $4,948,786 |
<2018 | Prior | $208,000 | $0 | $0 | $0 | $208,000 |
2018-2022 TOTAL | $635,920 | $0 | $4,948,786 | $0 | $5,584,706 | |
ALL YEARS TOTAL | $843,920 | $0 | $4,948,786 | $0 | $5,792,706 |
Previously Approved Version |
0900064 (Ver 1) 18-13.2 |
Title: Road Rehab Route: N/A Description: Indy Blvd from McShane Dr to Michigan St. This project will repair the pavement on Indianapolis Blvd adding complete streets and help with underground infrastructure Project Type: Roadway Reconstruction/Rehabilitation AQ Exempt: Exempt District: LaPorte County: Lake Limits: From McShane Drive to Michigan Street of Distance (mile) 2.3 |
Region: Northwestern MPO Lead Agency: East Chicago |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2020 | FTA 5339 Chicago UZA | $0 | $0 | $1,400,000 | $0 | $1,400,000 |
2020 | Local Fund | $0 | $0 | $350,000 | $0 | $350,000 |
2020-2024 TOTAL | $0 | $0 | $1,750,000 | $0 | $1,750,000 | |
ALL YEARS TOTAL | $0 | $0 | $1,750,000 | $0 | $1,750,000 |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2020 | FTA 5307 Chicago UZA | $0 | $0 | $40,000 | $0 | $40,000 |
2020 | Local Fund | $0 | $0 | $10,000 | $0 | $10,000 |
2020-2024 TOTAL | $0 | $0 | $50,000 | $0 | $50,000 | |
ALL YEARS TOTAL | $0 | $0 | $50,000 | $0 | $50,000 |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2020 | FTA 5307 Chicago UZA | $0 | $0 | $40,000 | $0 | $40,000 |
2020 | Local Fund | $0 | $0 | $10,000 | $0 | $10,000 |
2020-2024 TOTAL | $0 | $0 | $50,000 | $0 | $50,000 | |
ALL YEARS TOTAL | $0 | $0 | $50,000 | $0 | $50,000 |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2020 | FTA 5339 Chicago UZA | $0 | $0 | $1,400,000 | $0 | $1,400,000 |
2020 | Local Fund | $0 | $0 | $350,000 | $0 | $350,000 |
2020-2024 TOTAL | $0 | $0 | $1,750,000 | $0 | $1,750,000 | |
ALL YEARS TOTAL | $0 | $0 | $1,750,000 | $0 | $1,750,000 |
NIRPC16003 (Ver 1) 20-00 STATUS New Project FEDERAL |
Title: Transit/Asset management / 2020 Transit Maint. Facility Route: N/A Description: This project is for Maintenance Center improvements consisting of construction and installation of an array to provide for solar power. The project will also provide power and charging infrastructure for GPTC's planned electric vehicle fleet. Project Type: Transit - Capital AQ Exempt: Non-Exempt District: LaPorte County: Lake Limits: Not Location Specific |
Region: Northwestern MPO Lead Agency: GPTC |
NIRPC16003 (Ver 1) 20-00 STATUS New Project FEDERAL |
Title: Transit/Customer Exp. / 2020 Trans. Facilities Route: N/A Description: This project is for the installation of landscaping and amenities, including shelters, at various locations on the GPTC system. Project Type: Transit - Capital AQ Exempt: Non-Exempt District: LaPorte County: Lake Limits: Not Location Specific |
Region: Northwestern MPO Lead Agency: GPTC |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2021 | FTA 5307 Chicago UZA | $0 | $0 | $80,000 | $0 | $80,000 |
2021 | Local Fund | $0 | $0 | $20,000 | $0 | $20,000 |
2020-2024 TOTAL | $0 | $0 | $100,000 | $0 | $100,000 | |
ALL YEARS TOTAL | $0 | $0 | $100,000 | $0 | $100,000 |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2022 | FTA 5307 Chicago UZA | $0 | $0 | $40,000 | $0 | $40,000 |
2022 | Local Fund | $0 | $0 | $10,000 | $0 | $10,000 |
2020-2024 TOTAL | $0 | $0 | $50,000 | $0 | $50,000 | |
ALL YEARS TOTAL | $0 | $0 | $50,000 | $0 | $50,000 |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2022 | FTA 5307 Chicago UZA | $0 | $0 | $40,000 | $0 | $40,000 |
2022 | Local Fund | $0 | $0 | $10,000 | $0 | $10,000 |
2020-2024 TOTAL | $0 | $0 | $50,000 | $0 | $50,000 | |
ALL YEARS TOTAL | $0 | $0 | $50,000 | $0 | $50,000 |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2021 | FTA 5307 Chicago UZA | $0 | $0 | $80,000 | $0 | $80,000 |
2021 | Local Fund | $0 | $0 | $20,000 | $0 | $20,000 |
2020-2024 TOTAL | $0 | $0 | $100,000 | $0 | $100,000 | |
ALL YEARS TOTAL | $0 | $0 | $100,000 | $0 | $100,000 |
NIRPC16003 (Ver 1) 20-00 STATUS New Project FEDERAL |
Title: Transit/Customer Exp. / 2021 Metro Trans. Facilities Route: N/A Description: This project is for the installation of landscaping and amenities at the Metro Center and GPTC's Maintenance Facility. Project Type: Transit - Capital AQ Exempt: Non-Exempt District: LaPorte County: Lake Limits: Not Location Specific |
Region: Northwestern MPO Lead Agency: GPTC |
NIRPC16003 (Ver 1) 20-00 STATUS New Project FEDERAL |
Title: Transit/Customer Exp. / 2022 Trans. Facilities Route: N/A Description: This project is for the installation of landscaping and amenities, including shelters, at various locations on the GPTC system. Project Type: Transit - Capital AQ Exempt: Non-Exempt District: LaPorte County: Lake Limits: Not Location Specific |
Region: Northwestern MPO Lead Agency: GPTC |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2024 | FTA 5307 Chicago UZA | $0 | $0 | $40,000 | $0 | $40,000 |
2024 | Local Fund | $0 | $0 | $10,000 | $0 | $10,000 |
2020-2024 TOTAL | $0 | $0 | $50,000 | $0 | $50,000 | |
ALL YEARS TOTAL | $0 | $0 | $50,000 | $0 | $50,000 |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2021 | FTA 5307 Chicago UZA | $0 | $0 | $720,000 | $0 | $720,000 |
2021 | Local Fund | $0 | $0 | $180,000 | $0 | $180,000 |
2020-2024 TOTAL | $0 | $0 | $900,000 | $0 | $900,000 | |
ALL YEARS TOTAL | $0 | $0 | $900,000 | $0 | $900,000 |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2021 | FTA 5307 Chicago UZA | $0 | $0 | $720,000 | $0 | $720,000 |
2021 | Local Fund | $0 | $0 | $180,000 | $0 | $180,000 |
2020-2024 TOTAL | $0 | $0 | $900,000 | $0 | $900,000 | |
ALL YEARS TOTAL | $0 | $0 | $900,000 | $0 | $900,000 |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2024 | FTA 5307 Chicago UZA | $0 | $0 | $40,000 | $0 | $40,000 |
2024 | Local Fund | $0 | $0 | $10,000 | $0 | $10,000 |
2020-2024 TOTAL | $0 | $0 | $50,000 | $0 | $50,000 | |
ALL YEARS TOTAL | $0 | $0 | $50,000 | $0 | $50,000 |
NIRPC16003 (Ver 1) 20-00 STATUS New Project FEDERAL |
Title: Transit/Customer Exp. / 2024 Trans. Facilities-FUTURE PROJECT Route: N/A Description: This project is for the installation of landscaping and amenities, including shelters, at various locations on the GPTC system. Project Type: Transit - Capital AQ Exempt: Non-Exempt District: LaPorte County: Lake Limits: Not Location Specific |
Region: Northwestern MPO Lead Agency: GPTC |
NIRPC16003 (Ver 1) 20-00 STATUS New Project FEDERAL |
Title: Transit/Customer Exp. / 2021 Metro Ped Facilities Route: N/A Description: This project is for the construction of pedestrian/bike infrastructure connecting businesses and other generators to stops on the Broadway Metro Express. These "first mile/last mile" improvements will include sidewalks, transit amenities and other eligible infrastructure, and improvements will be finalized in Project ID GPTC TOD I. Project Type: Transit - Capital AQ Exempt: Non-Exempt District: LaPorte County: Lake Limits: Nearest Crossstreet: Broadway |
Region: Northwestern MPO Lead Agency: GPTC |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2020 | FTA 5307 Chicago UZA | $0 | $0 | $641,000 | $0 | $641,000 |
2020 | Local Fund | $0 | $0 | $160,250 | $0 | $160,250 |
2020-2024 TOTAL | $0 | $0 | $801,250 | $0 | $801,250 | |
ALL YEARS TOTAL | $0 | $0 | $801,250 | $0 | $801,250 |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2021 | FTA 5307 Chicago UZA | $0 | $0 | $673,050 | $0 | $673,050 |
2021 | Local Fund | $0 | $0 | $168,263 | $0 | $168,263 |
2020-2024 TOTAL | $0 | $0 | $841,313 | $0 | $841,313 | |
ALL YEARS TOTAL | $0 | $0 | $841,313 | $0 | $841,313 |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2021 | FTA 5307 Chicago UZA | $0 | $0 | $673,050 | $0 | $673,050 |
2021 | Local Fund | $0 | $0 | $168,263 | $0 | $168,263 |
2020-2024 TOTAL | $0 | $0 | $841,313 | $0 | $841,313 | |
ALL YEARS TOTAL | $0 | $0 | $841,313 | $0 | $841,313 |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2020 | FTA 5307 Chicago UZA | $0 | $0 | $641,000 | $0 | $641,000 |
2020 | Local Fund | $0 | $0 | $160,250 | $0 | $160,250 |
2020-2024 TOTAL | $0 | $0 | $801,250 | $0 | $801,250 | |
ALL YEARS TOTAL | $0 | $0 | $801,250 | $0 | $801,250 |
NIRPC16002 (Ver 1) 20-00 STATUS New Project FEDERAL |
Title: Transit/Operating / 2020 Comp Paratransit Route: N/A Description: This project is for non-fixed route paratransit services provided in compliance with the Americans with Disabilities Act of 1990. Project Type: Transit - Complementary Paratransit AQ Exempt: Non-Exempt District: LaPorte County: Lake Limits: Not Location Specific |
Region: Northwestern MPO Lead Agency: GPTC |
NIRPC16002 (Ver 1) 20-00 STATUS New Project FEDERAL |
Title: Transit/Operating / 2021 Comp Paratransit Route: N/A Description: This project is for non-fixed route paratransit services provided in compliance with the Americans with Disabilities Act of 1990. Project Type: Transit - Complementary Paratransit AQ Exempt: Non-Exempt District: LaPorte County: Lake Limits: Not Location Specific |
Region: Northwestern MPO Lead Agency: GPTC |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2022 | FTA 5307 Chicago UZA | $0 | $0 | $706,702 | $0 | $706,702 |
2022 | Local Fund | $0 | $0 | $176,676 | $0 | $176,676 |
2020-2024 TOTAL | $0 | $0 | $883,378 | $0 | $883,378 | |
ALL YEARS TOTAL | $0 | $0 | $883,378 | $0 | $883,378 |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2023 | FTA 5307 Chicago UZA | $0 | $0 | $742,038 | $0 | $742,038 |
2023 | Local Fund | $0 | $0 | $185,510 | $0 | $185,510 |
2020-2024 TOTAL | $0 | $0 | $927,548 | $0 | $927,548 | |
ALL YEARS TOTAL | $0 | $0 | $927,548 | $0 | $927,548 |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2023 | FTA 5307 Chicago UZA | $0 | $0 | $742,038 | $0 | $742,038 |
2023 | Local Fund | $0 | $0 | $185,510 | $0 | $185,510 |
2020-2024 TOTAL | $0 | $0 | $927,548 | $0 | $927,548 | |
ALL YEARS TOTAL | $0 | $0 | $927,548 | $0 | $927,548 |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2022 | FTA 5307 Chicago UZA | $0 | $0 | $706,702 | $0 | $706,702 |
2022 | Local Fund | $0 | $0 | $176,676 | $0 | $176,676 |
2020-2024 TOTAL | $0 | $0 | $883,378 | $0 | $883,378 | |
ALL YEARS TOTAL | $0 | $0 | $883,378 | $0 | $883,378 |
NIRPC16002 (Ver 1) 20-00 STATUS New Project FEDERAL |
Title: Transit/Operating / 2022 Comp Paratransit Route: N/A Description: This project is for non-fixed route paratransit services provided in compliance with the Americans with Disabilities Act of 1990. Project Type: Transit - Complementary Paratransit AQ Exempt: Non-Exempt District: LaPorte County: Lake Limits: Not Location Specific |
Region: Northwestern MPO Lead Agency: GPTC |
NIRPC16002 (Ver 1) 20-00 STATUS New Project FEDERAL |
Title: Transit/Operating / 2023 Comp Paratransit Route: N/A Description: This project is for non-fixed route paratransit services provided in compliance with the Americans with Disabilities Act of 1990. Project Type: Transit - Complementary Paratransit AQ Exempt: Non-Exempt District: LaPorte County: Lake Limits: Not Location Specific |
Region: Northwestern MPO Lead Agency: GPTC |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2024 | FTA 5307 Chicago UZA | $0 | $0 | $779,140 | $0 | $779,140 |
2024 | Local Fund | $0 | $0 | $194,785 | $0 | $194,785 |
2020-2024 TOTAL | $0 | $0 | $973,925 | $0 | $973,925 | |
ALL YEARS TOTAL | $0 | $0 | $973,925 | $0 | $973,925 |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2020 | FTA 5307 Chicago UZA | $0 | $0 | $725,623 | $0 | $725,623 |
2020 | Local Fund | $0 | $0 | $725,623 | $0 | $725,623 |
2020-2024 TOTAL | $0 | $0 | $1,451,246 | $0 | $1,451,246 | |
ALL YEARS TOTAL | $0 | $0 | $1,451,246 | $0 | $1,451,246 |