P34#yIS1


image

Plan NWI

The Northwestern Indiana Regional Planning Commission

Unified Planning Work Program

2021 - 2022


Fiscal Year 2022 Update Adopted April 15, 2021

Contents

NIRPC Commission Resolution 21-05 2021-2022 UPWP Amendment #4 4

2021 UPWP Budget 5

State Fiscal Year 2021 Budget Tables 5

2022 UPWP Budget 8

State Fiscal Year 2022 Budget Tables 8

About NIRPC 11

Background + Purpose 12

State Authority 12

About the UPWP 13

Required Elements 13

FHWA + FTA Planning Emphasis Areas 13

2021 Planning Emphasis Areas 14

2022 Planning Emphasis Areas 14

NWI 2050 Strategies 15

Public Participation 17

Metropolitan Planning Activities and Tasks 18

  1. | Administration and Public Participation 18

    1. | Planning Management + Administration 19

    2. | Public Participation + Communication Tools 21

    3. | Title VI and Environmental Justice Program Management 23

    4. | Americans with Disabilities Act Program Management 25

    5. | UPWP Development + Management 27

  1. | Data Collection and Analysis 29

    1. | Planning Data Collection 30

    2. | Planning Data Analysis + GIS Support Services 32

    3. | Performance-based Planning Activities 35

    4. | Congestion Management 37

    5. | Travel Demand Modeling 40

    6. | Air Quality Conformity 42

  1. | Short Range Planning 45

    1. | Transportation Improvement Program Development 46

    2. | TIP Development + Management 48

    3. | Environmental Red Flag Investigations 50

  1. | Long Range Planning 51

    1. | Comprehensive Regional Plan Development 52

    1. | Regional Land Use Planning 59

    2. | Surface Transportation Planning 62

    3. | Environmental Linkages Planning 65

  1. | Multi-modal Planning 67

    1. | Active Transportation Planning 68

    2. | Transit Planning 71

  1. | Special Planning Activities 74

    1. | Old Plank Road Trail Study 75

    2. | Local E-Commerce Sub Area Redevelopment Plan 77

  1. | Federal Transit Administration 5307 Funds 78

    1. | Sub-grantee Oversight 80

  1. | Surface Transportation Block Grant and Congestion Mitigation and Air Quality 82

    1. | E-TIP and TIP Assistant 83

    2. | Air Quality Public Education 84

900.1 | General management of NIRPC, office + staff 86

Other Significant Regional Planning Activities 88

Gary Public Transportation Corporation 88

Northern Indiana Commuter Transportation District 88

Attachment I: Cost Allocation Plan Approval Letters 89

Attachment II: CMAQ Eligibility Finding 92

image

.. .

111

. I.

NDIANA

NORTHWESTERN .

REGIONAl PLANNING COMMISSION


RESOLUTION 21-05


A RESOLUTION OF THE NORTHWESTERN INDIANA REGIONAL PLANNING COMMISSION TO ADOPT AMENDMENT #4 2021-2022 UNIFIED PLANNING WORK PROGRAM 2022 Update

FOR LAKE, PORTER, AND LAPORTE COUNTIES, INDIANA


April 15, 2021


WHEREAS, the Northwestern Indiana Regional Planning Commission, hereafter referred to as "the Commission," being designated as the Metropolitan Planning Organization (MPO) for the Lake, Porter, and LaPorte County area, has established a comprehensive, cooperative, and continuing transportation planning process to develop the FY 2021 - 2022 Unified Planning Work Program (UPWP); and

WHEREAS, the preparation of a UPWP is a necessary and required part of the metropolitan area transportation planning process as specified in 23 CFR 450.308; and by its State statutory authority, the Commission is charged with regional planning responsibility for the environment, economic development, and transportation; and

WHEREAS, the work tasks and budgets described within the Commission's UPWP are in conjunction with the programs and planning emphasis areas of the Federal Highway and Transit Administrations, and significant planning projects in the region by other agencies; and

WHEREAS, federal transportation fund expenses contracted to NIRPC must be adopted into the current UPWP in order to be reimbursed; and

WHEREAS, the PL/5307 federal funding allocation for the Commission for State Fiscal Year (SFY) 2022 was revised to total one million, four hundred and twenty eight thousand, eight hundred and ten dollars ($1,428,810); and

WHEREAS, the Technical Planning Committee has recommended that the Commission approve the content of UPWP 2021-2022 Amendment #4, 2022 Update;

NOW, THEREFORE, BE IT RESOLVED that the Northwestern Indiana Regional Planning Commission hereby adopts the FY 2021 - 2022 UPWP Amendment #4, 2022 Update and the Commission is authorized to enter into such agreements and contracts as may be required with the funding and administrative agencies for the execution of this UPWP.


Duly adopted by the Northwestern Indiana Regional Planning Commission on this fifteenth day of April, 2021. 4      

George H.Topoll Chairperson


ATT ,-,-_. . _ .- ·---·- ·-·- -·-

image

,..-:         

-

c:::--- . ..---: -- " -.-- - - - _,)  

image

·                                                       

image

Secreta.ry

2021 UPWP Budgets

State Fiscal Year 2021 Budget Tables


2021 NIRPC UPWP Budget Summary-Amended with 2020 Balances 11/19/2020


UPWP Section


Task Group


Name

Funding Source

FY 2021

Total Cost

Total Cost (2021+2020)

2021

Federal Share

2020

Federal Balance

Total Federal Funds


Non-Federal share

21-100 Administration and public participation 21-200 Data collection + analysis

21-300 Short-range planning

21-400 Long-range planning

21-500 Multi-modal planning

21-600 Special Planning Activities


PL/5303 (INDOT)

$ 498,244

$ 511,378

$ 398,595

$ 10,508

$ 409,103

$ 102,276

*

$ 332,802

$ 737,050

$ 266,241

$ 323,398

$ 589,640

$ 147,410

**

$ 203,619

$ 281,369

$ 162,895

$ 62,200

$ 225,095

$ 56,274


$ 557,016

$ 634,016

$ 445,613

$ 61,600

$ 507,213

$ 126,803


$ 306,518

$ 306,518

$ 245,214

$ -

$ 245,214

$ 61,304


$ -

$ 127,000

$ -

$ 101,600

$ 101,600

$ 25,400

**

PL / 5303 Total




1,898,199

2,597,331

1,518,559

559,306

2,077,865

519,466



Federal Transit Administration 5307 Funds

21-700.1 FTA Subrecipient Oversight

5307 (FTA)

$ -


$ -



$ -


21-700.2 CARES Act Subrecipient Oversight

5307 (FTA)

$ 429,020


$ 429,020



$ -


STBG and CMAQ

22-800.1 TIP Programming Asst/E-TIP

STBG (INDOT)

$ 64,375

$ 68,125

$ 51,500

$ 3,000

$ 54,500

$ 13,625


22-800.2 Air Quality Public Education

CMAQ

(INDOT)

$ 450,000

$ 557,804

$ 360,000

$ 86,243

$ 446,243

$ 111,561

***

* PL/5303 Non-salary direct expenses such as travel, copies and printing, for all task groups are budgeted under 21-100 - Administration and Public Participation.


** Non-Federal Cash Match to be funded by NIRPC and participating LPAs.


*** Non-Federal Cash match contributed by South Shore Clean Cities, Partners for Clean Air, Porter and LaPorte County Solid Waste Management Districts, and Private Bike-Map Sponsors. Match also includes in-kind match from Adams Radio Group pre-approved in 2019 for FY2020 CMAQ.



Page 5 of 94


NIRPC 2021-2022 Unified Planning Work Program

Amendment #4, 2022 Update

image

Transportation Environment Communication Finance Administration ED


Transportation Director

Mitch Barloga

Gabrielle Biciunas

Charles Bradsky

Eman Ibrahim

Kevin Polette

Scott Weber

Vacant

New TIP/Grant Asst

Peter Kimball

New Planner

Graduate intern

Undergrad intern

Kathy Luther

Joe Exl

John Smith

Vacant

Talaya Jones

Accounts Payable

Allen Hammond

Stephanie Kuziela

Lisa Todd

Meredith Stilwell

Candice Eklund

Flor Baum

Ty Warner

2021


UPWP

section


Staff cost

Contract/ Sub- Grant

Total task cost


Federal share


Non-Federal Share


Administration and public participation


Planning management + administration


100.1


271,099


- 271,099


216,879


54,220


1,476 - -


- - -


- - -


- - -


- 410 - -


- 82 -


- - -


- - 820 -


Public participation + communication tools


100.2


92,146


94,146


75,317


18,829


- - -


- - -


- - -


- - - - -


- 82


1,230 - -


- - -


164 - - -


Title VI program management & Environmental Justice


100.3


22,529


- 22,529


18,023


4,506


- - -


- - -


- - -


- - - - - - -


328 - -


- - - - - - -


ADA program management


100.4


21,272


- 21,272


17,018


4,254


- 164 -


- - -


- - -


- - - - - - -


- - -


33 - - - - - -


UPWP development and management


100.5


38,397


- 38,397


30,718


7,679


164 - -


- - -


- 164 -


- - - - - - -


- 82 -


- - - - - - -


Total costs for task group 445,444 -


509,967


357,955 89,489


Data collection + analysis


Transportation data collection


200.1


109,366


- 442,166


353,733


88,433 *


- - -


- - 1,558 -


- - 164 -


- - - - -


- - -


- - - - - - -


Data Analysis and GIS Support Services


200.2


118,723


119,223


95,378


23,845


- - - - -


82 -


- - 1,082


- 1,640 - - - -


- - -


- - - - - - -


Performance-based planning activities


200.3


32,219


- 33,167


26,534


6,633


- - -


- - -


328 - -


- - - - - - -


- - -


- - - - - - -


Congestion management


200.4


24,164


- 24,164


19,332


4,833


- - -


- - -


246 - -


- - - - - - -


- - -


- - - - - - -


Travel demand modeling


200.5


32,219


70,000


102,219


81,775


20,444


- - -


- - -


328 - -


- - - - - - -


- - -


- - - - - - -


Air quality conformity


200.6


16,110


- 16,110


12,888


3,222


- - -


- - -


164 - -


- - - - - - -


- - -


- - - - - - -


Total costs for task group 332,802 70,000


737,050


589,640 147,410 *


Short-range planning


PL + 5303 activities

TIP development


300.1


53,015


- 53,015


42,412


10,603


- - -


492 -


- - - -


- - - - - - -


- - -


- - - - - - -


TIP management


300.2


132,051


77,750


209,801


167,841


41,960


- - -


1,148 -


- - - -


- - - - - - -


- - -


- - -


- - 164 -


Environmental red flag investigations


300.3


18,553


18,553


14,842


3,711


- - -


- - -


- - -


- - - - -


164 -


- - -


- - - - -


82 -


Total costs for task group 203,619 77,750


281,369


225,095 56,274


Long-range planning


CRP Implementation Development


400.1


108,821


44,789


153,610


122,888


30,722


- - 164 -


- - -


82 -


- 1,312 - - - - -


- - -


- - - - - - -


NWI 2050 Implementation


400.2


133,506


133,506


106,805


26,701


- - -


- 984 -


- - -


- 328 - - - - -


- - -


- - - - - - -


Regional land use planning


400.3


74,271


- 74,271


59,417


14,854


- - -


- 656 -


- - -


- - - - - - -


- - -


- - - - - - -


Surface transportation planning


400.4


81,890


- 81,890


65,512


16,378


- - -


- - -


574 -


- 328 -


- - - - -


- - -


- - - - - - -


Environmental linkages planning


400.5


113,740


77,000


190,740


152,592


38,148


- - -


- - -


- - -


- - -


- 246


820 -


- - -


- - -


- - 246 -


Total costs for task group 512,227 121,789


634,016


507,213 126,803


Multi-modal planning


Active transportation planning


500.1


172,638


- 172,638


138,110


34,528


- 1,476 -


- - -


- - -


- - -


820 - - -


- - -


- - - - - - -


Transit planning (programmed in 5307)


500.2


133,880


- 133,880


107,104


26,776


- - -


- - -


- 1,394 -


- - -


820 - - -


- - -


- - - - - - -


Total costs for task group 306,518 -


306,518


245,214 61,304


Special Planning Activities


Old Plank Road Trail Study


600.1


50,000


- 50,000


40,000


* - - -


- - -


- - -


- - - - - - -


- - -


- - - - - - -


E Commerce Redevelopment Sub Area Plan


600.2


75,000


75,000


60,000


* - - -


- - -


- - -


- - - - - - -


- - -


- - - - - - -


Total Costs for task group 125,000


Total budget for PL / 5303 + match 1,800,610 269,539


125,000


2,468,920


100,000


1,975,136 493,784


1,640 1,640 164 1,640 1,640 1,640 1,640 1,640 - 1,574 1,640 1,640 1,640


656 984 82 1,558


164 - 33 - -


164 - 1,312 -


2021 P1421C1T3#yIS1


Transportation Environment Communication Finance Administration ED


Transportation Director


Mitch Barloga


Gabrielle Biciunas


Charles Bradsky


Eman Ibrahim


Kevin Polette


Scott Weber


Vacant Transit Planner


New TIP/Grant Asst


Peter Kimball


New Planner


Graduate intern


Undergrad intern


Kathy Luther


Joe Exl


John Smith


Vacant Public Participation


Talaya Jones


Accounts Payable


Allen Hammond


Stephanie Kuziela


Lisa Todd

Meredith Stilwell


Candice Eklund


Flor Baum


Ty Warner

UPWP

section


Staff cost

Contract/ Sub- Grant

Total task cost


Federal share


Non-Federal Share



5307 FTA

Sub-Recipient Oversight








Sub-Recipient oversight

700.1

-


-

-

-



-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

CARES Act Sub-Recipient Oversight

700.2

400,020

12,000

429,020

429,020

-



-

-

-

-

-

-

-

-

656

-

-

-

-

98

-

-

-

164

-

1,591

656

1,394

-

98

-

-

Total budget for 5307 + match


400,020

SFY 2020 Bal - A

429,020

429,020

-






























CMAQ and STBG


STBG and CMAQ





E-TIP Contract (FY 2021 STBG) DES#:NIRPC1600397


800.1


image


61,142


$3,000


67,375


53,900


13,475




image


984


image


image




Air quality public education ( FY2021 CMAQ) DES# NIRPC1600453


800.2


-


557,804


557,804


446,243


111,561


*



-


-


-


-


-


-


-


-


-


-


-


-


-


-


-


-


-


-


-


-


-


-


-


-


-


-

image

2022 UPWP Budget

State Fiscal Year 2022 Budget Tables


2022 NIRPC UPWP Simple Budget Summary


UPWP Section


Task Group Name


Funding Source


Total Task Cost


Federal Share

Non-Federal share

22-100

Administration and public participation


PL/5303 (INDOT)

$ 600,121

$ 480,097

$ 120,024


22-200

Data collection + analysis

$ 291,736

$ 233,389

$ 58,347


22-300

Short-range planning

$ 187,582

$ 150,065

$ 37,516


22-400

Long-range planning

$ 428,598

$ 342,879

$ 85,720


22-500

Multi-modal planning

$ 259,616

$ 207,692

$ 51,923


22-600

Special Planning Activities

$ 18,360

$ 14,688

$ -


PL / 5303 Total



1,786,012

1,428,810

353,531



Federal Transit Administration 5307 Funds

22-700.1 FTA Subrecipient Oversight

5307 (FTA)

$ 192,812

$ 154,250

$ 38,562


21-700.2

CARES Act Subrecipient Oversight

5307 (FTA)

$ 314,914

$ 314,914

$ -


STBG and CMAQ

22-800.1 TIP Programming Asst

STBG (INDOT)

$ 66,306

$ 53,045

$ 13,261


22-800.2

Air Quality Public Education

CMAQ (INDOT)

$ 450,000

$ 360,000

$ 90,000

**

* Non-salary direct expenses such as travel and supplies for all task groups are budgeted under 22-100 - Administration and Public Participation.


** Non-Federal Cash Match to be the responsibility of partners South Shore Clean Cities, Partners for Clean Air, and Private Bike-Map Sponsors.

image

Transportation Environment Econ Dev Finance Administration ED


Transportation Director

Mitch Barloga

Charles Bradsky

Eman Ibrahim

Peter Kimball

Kevin Polette

Scott Weber

Open Entry Level Planner

Open Entry Level Planner

Intern

Intern

Kathy Luther

Joe Exl

John Smith

EDD Coordinator

Denarie Kane

Lucas-Ecklund Baker

Talaya Jones

Marisol Manley

New TIP/Grant Asst

Allen Hammond

Stephanie Kuziela

Lisa Todd

Meredith Stilwell

Flor Baum

Candice Eklund

Ty Warner

2022



Administration and public participation


UPWP section


Staff cost


Contract/ Sub- Grant


Supplies, printing, software licenses, travel, & training


Total task cost


Federal share


Non-Federal Share


Non-NIRPC

share


Total number of hours


Planning management + administration


100.1


331,479


- 61,491


392,970


314,376


78,594


- 1,476 - - -


- - - -


- - -


385 -


- - -


- - -


- - -


- - 1,492


250 -


3,604


Public participation + communication tools


100.2


135,016 -


135,016


108,013


27,003


- - -


- - -


- - 656


820 - - -


- - -


- 596 - -


- - -


- 164 - - -


2,236


Title VI program management & Environmental Justice


100.3


11,265 -


11,265


9,012


2,253


- - -


- - - -


- 164


- - -


- - - -


- - -


- - - - -


- - -


164


ADA program management


100.4


8,990 -


8,990


7,192


1,798


- - 82 - -


- - - - - - - -


- - - -


- - -


- - - - -


- - - 82


UPWP development and management


100.5


51,880 -


51,880


41,504


10,376


- 164 -


- - - -


- - - -


- 167 -


- - -


- 82 -


- - - - -


- - -


413


Total costs for task group 538,630 -


600,121


480,097 120,024 -


Data collection + analysis


Transportation data collection


200.1


103,863 -


103,863


83,090


20,773


- - -


- - 164


1,558 - - - - - -


- - - -


- - -


- - - - -


- - -


1,722


Planning data analysis + GIS services


200.2


83,724 -


83,724


66,979


16,745


- - -


- - 1,050


82 - - - - - -


- - - -


- - -


- - - - -


- - -


1,132


Performance-based planning activities


200.3


32,046 -


32,046


25,637


6,409


- - -


- - -


- 328 - - - - -


- - - -


- - -


- - - - -


- - -


328


Congestion management


200.4


24,035 -


24,035


19,228


4,807


- - -


- - -


- 246 - - - - -


- - - -


- - -


- - - - -


- - -


246


Travel demand modeling


200.5


32,046 -


32,046


25,637


6,409


- - -


- - -


- 328 - - - - -


- - - -


- - -


- - - - -


- - -


328


Air quality conformity


200.6


16,023 -


16,023


12,818


3,205


- - -


- - -


- 164 -


- - - -


- - - -


- - -


- - - - -


- - -


164


Total costs for task group 291,736 -


291,736


233,389 58,347 -


PL + 5303 activities

Short-range planning


TIP development


300.1


51,236 -


51,236


40,988


10,247


- - -


492 -


- - - -


- - - -


- - - -


- - -


- - - - -


- - -


492


TIP management


300.2


119,550 -


119,550


95,640


23,910


- - -


1,148 -


- - - -


- - - -


- - - -


- - -


- - - - -


- - -


1,148


Environmental red flag investigations


300.3


16,797 -


16,797


13,437


3,359


- - -


- - - - - - - - - -


164 - - -


- - -


- - - - -


- 49 -


213


Total costs for task group 187,582 -


187,582


150,065 37,516 -


Long-range planning


LRP Implementation Development


400.1


56,326 -


56,326


45,060


11,265


- - -


- - - -


- 820 - - - -


- - - -


- - -


- - - - -


- - -


820


NWI 2050 Implementation


400.2


114,321


114,321


91,457


22,864


- - -


902 - -


- - - - -


82 -


- - -


- - -


- - - - -


- - -


984


Regional land use planning


400.3


74,953 -


74,953


59,963


14,991


- - -


- 656 - - - - - - - -


- - - -


- - -


- - - - -


- - -


656


Surface transportation planning


400.4


80,739 -


80,739


64,591


16,148


- - -


- - 328 -


574 - - - - -


- - - -


- - -


- - - - -


- - -


902


Environmental linkages planning


400.5


102,259 -


102,259


81,807


20,452


- - -


- - - - - -


- - -


82 1,033 - - -


- - -


- - - - -


- - -


1,115


Total costs for task group 428,598 -


428,598


342,879 85,720 -


Multi-modal planning


Active transportation planning


500.1


161,827 -


161,827


129,461


32,365


- - 1,476 - -


- - - -


- - - -


- - - -


- - -


- - - - -


- - -


1,476


Transit planning (programmed in 5307)


500.2


97,789 -


97,789


78,231


19,558


- - -


- - -


- - -


820 - -


83 -


- - -


- - -


- - - - -


- - -


903


Total costs for task group 259,616 -


259,616


207,692 51,923 -


Special Planning Activities


Project management of Contractor lead projects

600.1

18,360

-


18,360

14,688

3,672


- -

82

-

82

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

- 164

Total costs for task group

18,360

-


18,360

14,688

3,672

-













Total budget for PL / 5303 + match

1,786,012

-

61,491

1,786,012

1,428,810

357,202

-

1,640 1,640

1,640 1,640 1,542 1,640 1,640 1,640 1,640

- -

800 1,197

-

596

82

- - - - -

164 1,492

299

-

19,292


2022

Transpo

tation










Environment

Commu

Econ

Dev


Finance







Administration


ED


Transportation Director


Mitch Barloga


Charles Bradsky


Eman Ibrahim


Peter Kimball


Kevin Polette


Scott Weber


New Entry Level Planner


New Entry Level Planner


Intern


Intern


Kathy Luther


Joe Exl


John Smith


EDD Coordinator


Denarie Kane


Lucas-Ecklund Baker


Talaya Jones


Marisol Manley


New TIP/Grant Asst


Allen Hammond


Stephanie Kuziela


Lisa Todd


Meredith Stilwell


Flor Baum


Candice Eklund


Ty Warner



UPWP section


Staff cost


Contract/ Sub- Grant

Supplies,

printing, software licenses, travel, &

training


Total task cost


Federal share


Non-Federal Share

Non-NIRPC

share



Total number of hours

5307 FTA

Sub-Recipient Oversight










Sub-Recipient oversight

700.1

180,652

5,700

6,460

192,812

154,250

38,562


-

-

-

-

-

-

-

-

-

-

-

-

62

-

-

-

-

-

125

-

280

623

156

592

-

93

-

-

1,932

CARES Act Sub-Recipient Oversight

700.2

294,748

9,300

10,865

314,914

314,914

-



-

-

-

-

-

-

-

-

-

-

-

102

-

-

-

-

-

203

-

458

1,017

254

966

-

153

-


3,152

Total budget for 5307 + match


475,401

15,000

17,000

507,726

469,164

38,562


-












164


1





328


738

1,640

410

1,558


246



28,244



CMAQ and STBG


STBG and CMAQ





NIRPC TIP Program Asst (FY 2022 STBG) DES#:NIRPC1600398


800.1


64,065


$ -


66,306


53,045


13,261




-


-


-


-


-


-


-


-


-


-


-


-


-


-


-


-


-


-


-


902


-


-


-


-


-


-



902

Air quality public education ( FY2022 CMAQ) DES# NIRPC1600453


800.2


-


445,000


3,000


450,000


360,000


90,000


*


3rd party match


-


-


-


-


-


-


-


-


-


-


-


-


-


-


-


-


-


-


-


-


-


-


-


-


-


-


-


-

image

image

About NIRPC

NIRPC is a regional council of local governments serving the citizens of Lake, Porter, and LaPorte counties in Northwest Indiana. The Northwest Indiana region is part of the U.S. Census Bureau's Chicago Metropolitan Statistical Area (MSA). NIRPC provides a forum that enables the citizens of Northwest Indiana to address regional issues relating to transportation, the environment and community, and economic development. NIRPC, as a recipient of federal funds, is subject to the requirements of Title VI of the Civil Rights Act of 1964, as amended, and the Americans With Disabilities Act (ADA). Title VI prohibits discrimination on the basis of race, creed, and national origin. The ADA prohibits discrimination on the basis of disability.


The Northwestern Indiana Regional Planning Commission (NIRPC) is a multi-purpose, sub-state, area- wide planning agency. NIRPC was originally established as the Lake-Porter County Regional Transportation and Planning Commission in 1965, pursuant to State-enabling legislation. An amendment to this legislation in 1973 provided the Commission with its current name and allowed for the addition of new member counties. Under this provision, La Porte County joined NIRPC in 1979.


In 1996 the legislation was again amended to provide a seat on the Commission for all of the mayors in the three-county region. The legislation was again amended in 2003 to provide for representation of all 41 cities and towns in the Tri-County area, and to specify that representatives must be elected officials. The legislation under which the Commission operates is contained within Indiana Code Title 36, Article 7, Chapter 7.6.


NIRPC operates as a cooperative of local governments within the Tri-County area. It is currently comprised of fifty-three members. In addition to the municipal appointments, the County Councils, Boards of Commissioners, and County Surveyors appoint one member each, as does the Governor. The Commission or the Executive Board meets monthly. NIRPC's meetings are open to the public and there is a place on every agenda for public comment.


The Commission's planning area is strategically located at the southern tip of Lake Michigan and represents an integral part of the greater Chicago metropolitan area. The Commission's planning area is comprised of the three participating counties of Lake, Porter and La Porte, located in the northwestern corner of the State of Indiana. It consists of 741,468 people (2000 Census) and covers 1,520 square miles. There are forty-one cities and towns and forty-four townships within the NIRPC planning area.


One of the most important designations NIRPC has received is that of Metropolitan Planning Organization (MPO) for Northwestern Indiana. MPOs are responsible, together with state departments of transportation and public transit operators, for carrying out the transportation planning process for urbanized areas.


Northwest Indiana is a diverse and dynamic region whose complexities are reflected in the regional transportation system. The NIRPC planning area includes arguably some of the most strategic and critical links in the national transportation system. These factors combine to make the role of MPO for Northwestern Indiana extraordinarily challenging.

In addition to planning responsibilities in the environmental and economic development areas, NIRPC provides certain staff services for the Kankakee River Basin – Yellow River Basin Development Commission as well as the Shared Ethics Advisory Commission.


Background + Purpose

NIRPC, as the Metropolitan Planning Organization (MPO) for Northwestern Indiana, has the responsibility to conduct the federally required “3C" transportation planning process for Lake, LaPorte, and Porter Counties. This Unified Planning Work Program (UPWP) is a core planning document required by the United States Department of Transportation (USDOT). The UPWP is the approved work plan for the MPO staff, identifying planning tasks and activities to be conducted over the next two years.


This UPWP is also a financial planning document linking resources and staff where they will be the most effective in responding to significant local and regional issues and resolving area-wide problems. This includes describing other planning, administrative, and program offerings of NIRPC as a council of governments. It includes all environmental and economic development planning, as well as transit administration, which includes sub-grantee oversight to transit providers in our region, grant administration, and procurement.


The UPWP continues to balance within the available resources, long and short-range planning and programming; special studies; data gathering, analysis, and dissemination; travel demand modeling; public involvement; and program administration. The UPWP attempts to address the major surface transportation issues facing our region and supports the necessary work required of an MPO in a Transportation Management Area. The UPWP is designed to maintain a certified continuous comprehensive, and cooperative (“3C”) transportation planning process in the context of connected planning processes for land use, social justice, economic development, and the environment.


State Authority

Regional planning and coordination came to Northwestern Indiana in 1965 when enabling legislation was passed by the Indiana General Assembly and signed into law by the Governor. The first state law called for a transportation planning commission, which was inspired by the 1962 Federal Highway Act. The state law has since been amended to create what is known today as the Northwestern Indiana Regional Planning Commission, a three-county council of governments. In the 2007 enabling legislation, NIRPC’s Executive Board membership was expanded and weighted voting was enabled.

About the UPWP


Required Elements

A driving influence in the development of this UPWP is the federal transportation authorization act, The Fixing America's Surface Transportation Act (FAST), and the Clean Air Act. The FAST Act was signed into law on December 5, 2015. The FAST Act is a five-year authorization and intends to improve surface transportation infrastructure including our roads, bridges, transit systems, bicycle, and pedestrian networks. The act contains ten national planning factors, provides more flexibility for states and local governments, streamlines project approval processes, and maintains a strong commitment to safety.


Transportation planning activities are accomplished by NIRPC in an open, transparent and inclusive process that complies with federal metropolitan planning regulations in order to maintain this region’s federal planning certification. According to the planning rule, NIRPC develops the three major required products of a metropolitan area transportation planning process, which are a UPWP, a metropolitan transportation plan with at least a 20-year horizon, and a shorter-range Transportation Improvement Program. The UPWP is organized by major activity and task, in addition to the following details: who will perform the work, the schedule for completing the work, the resulting products, the proposed funding, and a summary of the total amounts and sources of federal and matching funds. The UPWP and other products of the planning process are reviewed by INDOT, FHWA, and FTA for compliance.

Required elements such as Title VI and Environmental Justice Planning can be found in section 100.3.



FHWA + FTA Planning Emphasis Areas

NIRPC also focuses on National Planning Emphasis Areas (PEAs) put forth periodically by USDOT. The PEAs help with the implementation of the FAST Act. On January 23, 2020, PEAs were issued for FY 2020, and in December 16, 2020 for FY 2021. The table below includes the PEAs from both years, hyperlinked to the corresponding section where the PEA has been included into NIRPC’s planning work. A PEA may be addressed in other UPWP sections; but the following sections will indicate the primary focus areas for meeting the requirements of the PEA. UPWP page Number are also provided.

2021 Planning Emphasis Areas


Planning Emphasis Area

NIRPC Planning Element

Updating Planning Roles and Responsibilities Cooperating Operating Manual (PRRCOM)

100.1 Planning Management + Administration p19

Traffic Incident Management (TIM)

400.4 Surface Transportation Planning p71

Local Road Safety Plans (LRSPs)

400.4 Surface Transportation Planning p71

Participation Plans (PPs)

100.2 Public Participation + Communication Tools p2


2022 Planning Emphasis Areas


Planning Emphasis Area

NIRPC Planning Element


Pedestrian Safety 200.1 Planning Data Collection p28

500.1 Active Transportation Planning p78

Resiliency 400.2 NWI 2050 Implementation p60

400.5 Planning and Environmental Linkages p74

Metropolitan Planning Area and Urbanized Area Boundaries

200.2 Planning Data Analysis & GIS p34

Human Service Coordinated Transportation Plan 500.2 Transit Planning (Updated in 2018) p80 Micromobility 200.1 Planning Data Collection p28

NWI 2050 Strategies

In addition to the federally required elements of the UPWP, this document also carefully weaves the initiatives and strategies identified in NIRPC’s long-range transportation plan, NWI 2050, throughout the document. Plan NWI requires all NIRPC planning activities to be tied back to one of NWI 2050’s 16 Strategic Initiatives and at least one of the many strategies also identified in the plan. This way NIRPC can ensure that every plan, every program, every policy is in step with the vision identified by the public. The 16 plan initiatives are:


1)

Plan for smart land uses and quality of place

400.2: NWI 2050 Implementation



400.3: Regional Land Use Planning

2)

Plan for an E-commerce landscape

400.2: NWI 2050 Implementation (repeated)

3)

Plan for Regional transit

500.2: Transit Planning



700.1 Sub-grantee Oversight

4)

Plan for Complete Streets and active transportation

500.1: Active Transportation Planning

5)

Plan for continually improved investment prioritization

100.4: Americans with Disabilities Act Program Management



300.1: Transportation Improvement Program Development



300.2: TIP Development + Management



400.4: Surface Transportation Planning

6)

Plan for Main Centers and transit-oriented development

400.2: NWI 2050 Implementation (repeated)

7)

Plan for asset vulnerability and climate change

400.5: Planning and Environmental Linkages

8)

Plan for green infrastructure and open spaces

400.5: Includes planning for prevention or mitigation of transportation impacts on natural

9)

Plan for brownfield redevelopment / remediation

This NWI 2050 Strategic Initiative will be addressed with planning activities not currently contained in the UPWP.

10)

Plan for transformative investments

100.1: Planning Management + Administration



100.5: UPWP Development and Management



400.1: Comprehensive Regional Plan Development

11)

Plan for a regional data and analysis

200.1: Planning Data Collection


framework

200.2: Planning Data Analysis + GIS Support Services



200.3: Performance-based Planning Activities



200.4: Congestion Management



200.5: Travel Demand Modeling



300.3: Environmental Red Flag Investigations



400.5: Environmental Linkages Planning

12)

Plan for an engaged public and share best

100.2: Public Participation + Communication Tools


practices

100.3: Title VI and Environmental Justice Program Management

13)

Plan for more council of government activities

This NWI 2050 Strategic Initiative will be addressed with planning activities not currently contained in the UPWP.

14)

Plan for cleaner air and energy

200.6: Air Quality Conformity



800.1: Air Quality Education

15)

Plan for watersheds and water quality

400.5: Includes planning for prevention or mitigation of transportation system impacts on water quality.

16)

Plan for economic development

This NWI 2050 Strategic Initiative will be addressed with planning activities not currently contained in the UPWP.

Public Participation

NIRPC’s planning activities are guided by its 2019 Public Participation Plan (PPP), Engage NWI:. Engage NWI is the federally required PPP that enables NIRPC staff to ensure that it is meeting all federal requirements for public participation. However, more importantly, Engage NWI serves as a guide that enables the public to engage with regional planning. Engage NWI promotes a meaningful exchange of ideas, identification of regional issues and solutions, as well as advancing initiatives to achieve the vision for Northwestern Indiana. In addition to detailing the technical aspects of public participation, it provides details on the type of engagement that is expected when working with the public. This means that every planning activity has a corresponding engagement goal defined by the following chart. This document uses the terms “Inform,” “Consult,” “Involve,” and “Collaborate” to define how NIRPC staff and the public interact to complete NIRPC’s ongoing planning work. NIRPC has an ongoing Commitment to ensure that 50% or more of all planning tasks fall into the “Involve” or “Collaborate” categories of participation.


image

Active participation methods

Adapted from the International Association of Public Participation (IAP2) Public Participation Spectrum

Does the task

require?


Engage NWI goal:

Inform

Consult Involve Collaborate

Provide public with objective information and assist their understanding

of regional challenges, options, opportunities, or solutions.

Engage NWI

promise

Keep the general public and stakeholders informed.


When goal will be selected:

Involvement methods / tools may include:

Website, social media, newsletters, multi-language publications, press releases, mailings, live streaming, white papers, or fact sheets.

The “Inform” level of participation will be used for technical documents, but the methods will be used frequently to communicate regularly with the public

Obtain feedback on regional planning tasks, analyses, or prior to policy making.


Keep public the informed. Listen and acknowledge concerns and ideas and provide public with report on how input shaped outcomes.


Activities listed in “Inform” plus surveys, comment forms, webinars, or formal meetings


The “Consult” level of participation will be used less frequently, but the methods will be used when needed.

Work directly with public and stakeholders throughout planning process to ensure concerns and ideas are consistently understood and considered.

Work with public and stakeholders to ensure goals and ideas are directly reflected in planning work as much as possible and report on how input shaped outcomes.


Activities listed in “Consult” plus focus groups, targeted outreach to meet people where they are such as “Out and Abouts,” or “Pop-up Events”.

The “Involve” method will be used frequently and the methods as well.

Partner with the public and stakeholders in every aspect of the planning process from project scoping through adoption of plans or policies.


Work with public and stakeholders to inform planning work from start at project scoping to understand issues, generate solutions, and incorporate feedback to shape outcomes.


Activities listed in “Involve” plus task forces, charrettes, keypad polling, and working groups


The “Collaborate” method will be used frequently with major planning processes.

Metropolitan Planning Activities and Tasks


  1. | Administration and Public Participation


    100: Administration and Public Participation


    Funding Source

    FY 2020

    Amended Funds


    FY 2021


    FY 2022

    Federal PL/5307


    Non-Federal

    $ 10,508


    $ 2,627

    $ 397,466


    $ 99,366

    480,097


    120,024

    TOTAL $ 13,134


    Tasks:


    Planning management + administration


    Public participation + communication tools


    Title VI program management & Environmental Justice

    ADA program management


    UPWP development and management

    $ 496,832 600,121


    Tasks or expenses added with 2020 Funds


    Voice to Text / Close Captioning system

    1. | Planning Management + Administration


      Task Status:

      Ongoing and permanent


      Task Lead:

      Open Director of Transportation Position


      Task Contributors:

      Kathy Luther, Transportation Director, Meredith Stilwell, Flor Baum, and Candice Eklund


      Task Objective:

      Effective management of NIRPC team and resources to achieve high-quality and impactful outcomes from MPO functions. Efficient administration of NIRPC grants and contracts, and support of all Commission and topical committees. Ensure that overall agency outreach and communication is integrated with the public participation requirements of the MPO. Coordinate strategic communication and coordination with neighboring MPOs, federal and state partners, permitting agencies, and NIRPC Commissioners and stakeholders.


      Prior Task Accomplishments:

      • Management of staff performing UPWP tasks and projects

      • Management of planning processes including, but not limited to:

        • Long Range Transportation Plan: NWI 2050

        • 2022-2026 TIP: Invest NWI

        • 2021-2022 UPWP: Plan NWI

      • 2019 Public Participation Plan Engage NWI:

      • Quarterly PL, STBG, and CMAQ Program Reports and Billings

      • Annual PL, STBG, and CMAQ Completion Reports.

      • Commission and Advisory Committee meetings prepared for and staffed

      • Participation in meetings of coordinating partners


        Task Description:

        Elements:

      • Management of NIRPC team including the coordination of internal team meetings, delegation of work, and committee assignments. Staff training, mentorship, professional development, time and attendance review, performance management processes.

      • Administration of financial resources.

      • Administration of topical planning committees: production of agendas, minutes, and communication functions by Administrative Assistants for timely distribution of meeting materials.

      Activities:

      Participate in meetings with partners on transportation topics, and subjects with linkages to NWI’s transportation network, throughout the year. Examples include the MPO Council in Indianapolis, Chicago Metropolitan Agency for Planning’s Transportation Committee, Port of Indiana, etc.


      Coordinated implementation of MPO functions with the public, partners, stakeholders, state, federal, regional, and local agencies. Provide leadership level oversight of the NIRPC Outreach Committee.


      Compliance oversight for both staff and STBG and CMAQ funded contractors and sub-grantees.


      Quarterly billing, performance evaluations, monthly committee and Commission meetings, and quarterly training activities.


      This task also includes funds budgeted for staff travel, training, software licenses, and supplies.


      Task Deliverables:

      On-budget and on-schedule delivery of planning program including all grant deliverables and federally required 3C documents identified herein.


      This task will assist with collaborating with state and federal partners on updating the Planning Roles and Responsibilities Cooperating Operating Manual (PRRCOM).


      Public Engagement Goal:

      Collaborate


      Corresponding NWI 2050 Initiative:

      Plan for Transformative Investments


      Corresponding NWI 2050 Strategies:

      The nature of this task impacts all plan strategies addressed by all other tasks in this document.


      Corresponding NWI 2050 Performance Measures:

      The nature of this task impacts all performance measures addressed by all other tasks in this document.

    2. | Public Participation + Communication Tools


      Task Status:

      Ongoing and permanent


      Task Lead: Open Planner Position


      Task Contributors:

      Mitch Barloga, Charles Bradsky, Joe Exl, Eman Ibrahim, Peter Kimball, Kathy Luther, Kevin Polette, Meredith Stilwell, Scott Weber, and Lucas Ecklund-Baker


      Task Objective:


      Implement the NIRPC Public Participation Plan, which includes the public participation requirements for Metropolitan Planning Organizations (MPOs) found in the federal metropolitan planning regulations. This means the development and execution of a transparent planning process with ample opportunity for input from the public, partners, and stakeholders.

      Manage and update/upgrade the NIRPC website to be an informative and up to date source for NIRPC planning efforts, meetings, and resources to not only assist constituents who are familiar with and utilize NIRPC services, but to also increase awareness and inclusion of the general public in NIRPC efforts.

      Use traditional and social media tools to communicate regional transportation planning and programming activities to region residents and decision makers.


      Prior Task Accomplishments:

      • Completion and adoption of Engage NWI: NIRPC’s public participation plan

      • NIRPC Social Media Content

      • NIRPC Newsletter

      • Website updates concerning public outreach and planning activities

      • Outreach to over 400 individuals through the development of NWI 2050 across 54 traditional and non-traditional outreach events

      • Over 3,000 social media and email contacts

      • Over 9,000 “reads” of Weekly Newsletter Content


        Task Description:

        Elements:

        Implement the newly updated Public Participation Plan. Execute communication strategies associated with all planning activities, including the coordination of public participation programs with state and federal entities. Ensure that contact lists are up to date and a list of accessible meeting locations is maintained. Ensure that the provision of alternative formats is made available when requested.

        Activities:

        Plan for, secure, and document public input pertaining to transportation, environmental, and economic development plans and programs, including comment periods and public meetings. Post content regarding planning activities and public comment periods on NIRPC's social media pages and website. Publish a weekly newsletter for distribution to stakeholders and interested parties. NIRPC Website Coordinator will keep the website current. Use virtual public involvement methods to modernize NIRPC outreach methods and continue to expand NIRPC’s ongoing conversation with the public. Acquire software or tools for voice to text conversion for close captioning and/or meeting recordings.


        Task Deliverables:

      • Implementation of Engage NWI:

      • New Social Media Content

      • New Weekly Newsletter Content

      • Website updates concerning public outreach activities

      • Digital public meetings about NIRPC’s ongoing planning work


        Public Engagement Goal:

        Collaborate


        Corresponding NWI 2050 Initiative:

        Plan for an Engaged Public and Share Best-Practices


        Corresponding NWI 2050 Strategies:

        While most planning tasks will use NWI 2050 strategies, planning tasks related to outreach utilize strategies found in Engage NWI to track the effectiveness of engagement.


        Corresponding NWI 2050 Performance Measures:

        While most planning tasks will use NWI 2050 performance measures, planning tasks related to outreach utilize metrics found in Engage NWI to track the effectiveness of engagement. These measures are:

      • Social media analytics

      • Newsletter analytics

      • Events held annually

      • Event participation

    3. | Title VI and Environmental Justice Program Management


      Task Status:

      Ongoing and permanent


      Task Lead: Open Planner Position


      Task Contributors:

      Mitch Barloga, Charles Bradsky, Joe Exl, Eman Ibrahim, Peter Kimball, Kevin Polette, Scott Weber, Transit Planner


      Task Objective:

      Continue to ensure that NIRPC and partner Local Public Agencies (LPA) in our region comply with Title VI of the Civil Rights Act of 1964. This planning activity will ensure that programs and projects adhere to the principles of non-discrimination, as well as ensure the MPO’s nondiscrimination self-certifications remain accurate. Additionally, this planning task will also include the evaluation of NIRPC plans and programs for environmental justice (EJ) sensitivity and work to continuously expand outreach efforts to low-income, minority, and other potentially disadvantaged populations.


      Prior Task Accomplishments:

      • Title VI Compliance Workshops for Local Public Agencies

      • NIRPC’s 2020 Title VI Update

      • EJ Population identification and prioritization in NWI 2050 and the 2020-2024 Transportation Improvement Program and Notice of Funding Availability


        Task Description:

        Elements:

        Assist and survey LPAs on compliance, including monitoring if LPAs have Title VI implementation plans and that they meet Title VI requirements. If such a plan is not in place with the project sponsor LPA, then INDOT may limit funding to those entities that are not meeting the requirements. Elements of an implementation plan include 1) identification of a person responsible for Title VI; 2) ensure utilization of “Notification of Nondiscrimination” statements; 3) a documented complaint process, and 4) steps used to collect and evaluate data on impacts from the LPAs programs and projects.


        Activities:

        NIRPC will continue to offer technical assistance to those LPAs that need assistance in completing this requirement for the development and implementation of a Title VI Plan and foster communications, cooperation, and coordination of Title VI and EJ populations to regional decision making.


        Task Deliverables:

      • Technical assistance to LPAs and robust public outreach.

      • Coordination of NIRPC projects in relation to Title VI and EJ community needs and outreach.

      • Increased inclusion of EJ communities in the transportation planning process in Northwestern Indiana


        Public Engagement Goal:

        Collaborate


        Corresponding NWI 2050 Initiative:

        Plan for an Engaged Public and Share Best-Practices


        Corresponding NWI 2050 Strategies:

        While most planning tasks will use NWI 2050 strategies, planning tasks related to outreach utilize strategies found in Engage NWI: to track the effectiveness of engagement.


        Corresponding NWI 2050 Performance Measures:

        While most planning tasks will use NWI 2050 performance measures, planning tasks related to outreach utilize metrics found in Engage NWI to track the effectiveness of engagement. These measures are:

      • Social media analytics related to engagement of Title VI and EJ populations

      • Newsletter analytics related to engagement of Title VI and EJ populations

      • Annual events held throughout the year within Title VI and EJ communities

      • Event participation of Title VI and EJ populations

    4. | Americans with Disabilities Act Program Management


      Task Status:

      Ongoing and permanent


      Task Lead:

      Mitch Barloga


      Task Contributors:

      Allen Hammond


      Task Objective:

      Ensure all Local public agencies (LPA) in our region that are required to have transition plans are in compliance with the Americans with Disabilities Act.


      Prior Task Accomplishments:

      NIRPC technical assistance to LPAs to achieve compliance with ADA transition planning requirements. Assistance with the ADA Bus Inventory project.


      Task Description:


      Elements:

      Assist LPAs with compliance and technical assistance of ADA transition plans. Assist in the continuous improvement required to help LPAs maintain ADA transition plans as a “living document.” INDOT may limit funding to those entities that are not meeting the requirements. While NIRPC has provided the ADA Bus Stop Inventory and Assessment to LPAs, priority in the TIP project selection process, ultimately submissions to the TIP and the replacement schedule for bus stops, will reside with the LPA.


      Activities:

      Direct communication with LPAs regarding ADA compliance, transition plan development maintenance, and management.


      Task Deliverables:

      Ongoing technical assistance as needed.


      Public Engagement Goal:

      Inform

      Corresponding NWI 2050 Initiative:

      Plan for Continually Improved Investment Prioritization


      Corresponding NWI 2050 Strategies:

      • Prioritize transit investments that better connect the Environmental Justice populations to job centers, medical facilities, recreations centers, shopping districts, and educational institutions.

      • Prioritize transit investments that connect communities in environmental justice areas, people who are elderly, low-income, people with disabilities, and veterans.

      • Improve the accessibility of regional pedestrian and transit infrastructure by allocating funding for the implementation of locally developed ADA transition plans, and incorporating Universal Design standards so all public infrastructure meets or exceeds ADA standards.


        Corresponding NWI 2050 Performance Measures:

      • All Purpose Average Trip Time

      • Work Purpose Average Trip Time

      • School Purpose Average Trip Time

      • Percent of Population within ¼-mile Network Distance to a Trail or Bicycle Facility

      • Percent of Population within ¼-mile Network Distance to a Trail or Bicycle Facility Crossing Municipal/County Jurisdictions

      • Number of Non-Motorized Serious Injuries and Fatalities

      • Total Number of Reportable Injuries and Rate per Total Vehicle Revenue Miles by Mode

      • Average Walk Score in “Main Centers”

      • Percent of Environmental Justice (EJ) Area Population within ¼-mile of a Trail or Multi-Use Path

      • Percent Adults Reporting Physical Inactivity

    5. | UPWP Development + Management


Task Status:

Ongoing and permanent


Task Lead:

Kathy Luther


Task Contributors:

Director of Transportation, Talaya Jones


Task Objective:

Develop and manage the UPWP and its amendments. The UPWP includes planning activities to implement NWI 2050, applicable laws, and regulations to support the federally required 3C transportation process for MPOs as outlined in metropolitan planning regulations.


Prior Task Accomplishments:

Production, management, and amendments of the 2019-2020 UPWP. UPWP continued to respond to the recommendations of the federal certification review. Amendment #1 and Amendment #2 to 2019-2020 UPWP submitted to INDOT/USDOT for approval. Annual quarterly UPWP reporting.


Task Description:

Elements:

A planning work program that addresses the needs of NIRPC, requirements of the federal regulation, and is responsive to the public, partners, and stakeholders.


Activities:

Identification of planning tasks and activities that assist in the implementation of NWI 2050. All members of NIRPC’s planning team contribute to this task through their program areas through annual and quarterly reporting as well as annual UPWP development.


Task Deliverables:

Public Engagement Goal:

Inform


Corresponding NWI 2050 Initiative:

Plan for Transformative Investments


Corresponding NWI 2050 Initiative:

Plan for Transformative Investments


Corresponding NWI 2050 Strategies:

The nature of this task impacts all plan strategies addressed by all other tasks in this document.


Corresponding NWI 2050 Performance Measures:

The nature of this task impacts all performance measures addressed by all other tasks in this document.

  1. | Data Collection and Analysis



    200: Data Collection and Analysis


    Funding Source

    FY 2020

    Amended Funds


    FY 2021


    FY 2022

    Federal PL/5307

    $ 323,398

    $ 266,241

    $ 233,389

    Non-Federal

    $ 80,850

    $ 66,560

    $ 58,347

    TOTAL

    $ 404,248

    $ 332,802

    291,736


    Tasks:



    Tasks or expenses added with 2020 Funds


    Transportation data collection



    88 Trail counters, 1 Data bike, 2 MioVision Traffic Counters

    Planning data analysis + GIS services


    ESRI Credits


    Performance-based planning activities



    Data Visualization Software

    Congestion management



    Travel demand modeling


    Update Travel Demand Model

    Air quality conformity



    1. | Planning Data Collection


      Task Status:

      Ongoing and permanent


      Task Lead:

      Kevin Polette


      Task Contributors:

      Peter Kimball, Joe Exl


      Task Objective:

      Collect, update, and manage data relating to all aspects of metropolitan planning. Includes data to support congestion management, economic and land use development, safety planning, vehicle, bicycle and pedestrian counts, micro-mobility and transit data.


      Prior Task Accomplishments:

      • Updated database of regional demographic and other useful data

      • ADA Bus Stop Inventory

      • Updated NOFA Application Maps

      • Crash data collection

      • Traffic count data collection

      • Travel time data collection

      • Transit data collection

      • Bicycle and pedestrian count data collection

      • Household Travel Survey


        Task Description:

        Elements:

      • Crash data collection

      • Traffic count data collection

      • Travel time data collection

      • Transit data collection

      • Asset inventory and condition data

      • Bicycle and pedestrian count data collection

      • Micromobility counts (in person site visits)

      • Pedestrian Safety Data

      • Create mechanism to collect safety concerns from the general public (pedestrian, roadway, and transit)

        Activities:

        Emphasis will be placed on identifying all the data needed for collection by NIRPC in order to support transportation planning processes and decision making. Focus will be given to starting an inventory of all regional ADA transition plan initiatives and completed projects; and updating regional databases

        with 2020 Census information. This program area will also be used to develop Highway Performance Monitoring System (HPMS) data. No HPMS-data was logged by NIRPC in the last few years; however, the program is expected to be fully re-deployed in this workplan. Acquire modern technology to increase NIRPC capacity to collect traffic data. There will be an emphasis on data collection for motorized and non-motorized safety. Acquire and share with LPAs equipment and supplies for collecting data on trail use and condition including mobile and fixed trail counters and a data bike.


        Task Deliverables:

        Data sets are collected in time for use by planners responsible for analysis. Completion of traffic counts requested by INDOT on a spring and fall cycle.


        Public Engagement Goal:

        Inform: As needed, but not anticipated to be a considerable effort


        Corresponding NWI 2050 Initiative:

        Plan for a regional data and analysis framework


        Corresponding NWI 2050 Strategies:

      • Update the various maps related to the local food system as it relates to Food Deserts, transit, transportation investments, land use, Environmental Justice areas, trails, and high-density population areas.

      • Coordinate spatial data acquisition, sharing and standardization in support of environmental planning across jurisdiction.

      • Collect transportation stream crossing inventory data to support habitat connectivity planning.

      • Support the collection and sharing of data for watershed and stormwater management planning.

      • Maintain and update parcel level septic system mapping in support of environmental planning.

      • Continue to maintain and update the "Regional Priority Trails & Corridors Map" as identified in the Greenways + Blueways 2020 Plan.

      • Share data on traffic volumes and other transportation attributes that NIRPC collects throughout the region.

      • Improve transportation network reliability by compiling, analyzing, and mapping reliability data for roadways in order to prioritize funding.

      • Reduce congestion increase transit efficiency by compiling, analyzing, and mapping roadway bottleneck data in order to prioritize funding.

      • Use asset management data from pavement and bridge conditions to pursue projects that address needs.

      • Increase transparency and awareness of the transportation network performance by publishing a Performance-based Planning dashboard.

      • Inventory and digitize in GIS sidewalk and bicycle lanes noting gaps infrastructure, and pedestrian and bicyclist comfort.


      Corresponding NWI 2050 Performance Measures:

      Every performance measure that requires new data or analysis.

    2. | Planning Data Analysis + GIS Support Services


      Task Status:

      Ongoing and permanent

      (Merged 200.2 Planning Data Analysis and 200.3 GIS Support Services from 2019–2020 UPWP)


      Task Lead:

      Peter Kimball


      Task Contributors:

      Kevin Polette and an intern


      Task Objective:

      • Manage, coordinate, expand, and continue to upgrade NIRPC GIS to meet the increasingly diverse spatial data requirements of transportation, environmental, and land use planning, economic development, and regional initiatives.

      • Manage, analyze, and disseminate data to support NIPRC planning activities, which requires data for transportation, regional land use, environmental and economic development elements. The management of data is essential in analyses and downstream decision-making for the regional planning and initiatives, and for integration in GIS. Increase capability to share geographic data on-line.


        Prior Task Accomplishments:

      • Maps for NOFA scoring and analysis

      • TIP data analysis

      • ADA Bus Stop Inventory

      • 2050 Plan GIS and Data Support

      • Community Data Profiles

      • As-needed technical assistance to external partners and community members


        Task Description:

        Elements:

      • Work with NIRPC team members to identify spatial analysis and maps needed to support all planning activities.

      • Maintain and update spatial data in the NIRPC database.

      • Work with external partners providing appropriate spatial analysis and maps as needed.

      • Analyze Metropolitan Planning Areas and Urbanized Boundaries in context of 2020 Census Data and update as needed.

        Activities:

        Identify data analysis and forecast cycles that best assist NIRPC planning activities, routine or unique tasks. Provide for dissemination of data analysis results to appropriate parties within NIRPC or to external parties. Download ARIES crash data. Check addresses for geolocation and correct police report location errors. Format crash data to align with the severity index utilized in the NOFA maps applications. Upload heatmap to website through ESRI interface. Convert the maps most often requested to ArcOnline to provide those an easily accessible map collection for stakeholders. Download ACS Census Data, calculate regional numbers and compile new data for the regional snapshot data sheets. Maintain and organize GIS databases and data reports.

        Produce spatial and non-spatial data sets. Creating, maintaining, and publishing online-maps and datasets. Participation in regional GIS user groups. Conduct analyses to support planning tasks. Use 2020 Census Data, as available, to review and analyze Metropolitan Planning areas and urbanized boundaries.


        Task Deliverables:

      • High-quality GIS spatial analysis conducted throughout the year to support NIRPC planning activities.

      • High quality maps

      • Updated datasets published to NIRPC’s website

      • Data Requests


        Public Engagement Goal:

        Primarily Inform, Collaborate, as needed


        Corresponding NWI 2050 Initiative:

        Plan for Regional Data and Analysis Framework


        Corresponding NWI 2050 Strategies:

      • Update various maps related to the local food system as it relates to Food Deserts, transit, transportation investments, land use, Environmental Justice areas, trails, and high-density population areas.

      • Map and identify prime agricultural land within urbanized areas near high- density, transit, and Environmental Justice areas, taking into consideration transportation, and economic development.

      • Identify land access opportunities and land value map for farmers (beginning), urban and agriculture.

      • Update historic register and the designated historic district maps.

      • Develop GIS maps for open space and water resource protection (Update, Expand, Maintain LMCP Eppley Project).


      • Include high solar and wind energy potential areas as natural resource in GIS layers in NWI (Department of Energy has national data);

      • Continue to maintain and update the “Regional Priority Trails & Corridors Map” as identified in the Greenways + Blueways 2020 Plan.

      • Compile and map roadway crash data to prioritize high crash corridors in the HSIP funding grants.

      • Inventory and digitize in GIS sidewalk and bicycle lanes noting gaps in infrastructure, and pedestrian and bicyclist comfort.

      • Create a parcel-based map of current and potential business locations along major NWI corridors to help identify economic centers and prioritize future transportation improvements.


      Corresponding NWI 2050 Performance Measures:

      Every performance measure has a specific data requirement- reference submitted projects for accurate list of specific performance measures

    3. | Performance-based Planning Activities


      Task Status:

      Ongoing and permanent


      Task Lead:

      Scott Weber


      Task Contributors:

      Mitch Barloga, Charles Bradsky,, Joe Exl, Eman Ibrahim, Peter Kimball, Kevin Polette, and ??


      Task Objective:

      • Implement the performance-based planning framework from NWI 2050,

      • Comply with the USDOT Performance Based Planning and Programming requirements,

      • Publish an annual dashboard of the region’s performance.


        Prior Task Accomplishments:

      • Establishment of performance measures and targets in NWI 2050.

      • Periodic monitoring of the measures as data becomes available.

      • Development of a draft of the dashboard’s design and where it will live on the newly updated website.


        Task Description:

        Elements:

      • Publication, monitoring, and analysis of regional data metrics. Acquire tools to help present and share technical performance data in understandable formats.


        Activities:

        Publication of a regional data dashboard in December 2020 in accordance with NWI 2050. Continued monitoring of data feeding into annual update of the dashboard.


        Task Deliverables:

        Publication of the Annual Performance Dashboard on NIRPC’s website


        Public Engagement Goal:

        Collaborate


        Corresponding NWI 2050 Initiative:

        Plan for Regional Data and Analysis Framework


        Corresponding NWI 2050 Strategies:

      • Increase transparency and awareness of the transportation network performance by publishing a Performance-based Planning dashboard.

      • Collect periodically IDEM Air Quality Monitoring Data.

      • Analyze NWI energy and fuel use and carbon footprint trends.

      • Obtain LIDAR tree canopy, land use and land cover data and keep the data up to date.

      • Track NWI Water Use and Sources.

      • Continue working with local university partners on collecting and analyzing data.

      • Utilize the data that Purdue’s Local Technical Assistance Program (LTAP) has been collecting about regional asset management to better inform, and where appropriate coordinate, project decision-making.

      • Use asset management data from pavement and bridge conditions to pursue projects that address needs.


      Corresponding NWI 2050 Performance Measures:

      All performance measures are related to this task.

    4. | Congestion Management


      Task Status:

      Ongoing and permanent


      Task Lead:

      Scott Weber


      Task Contributors:

      None


      Task Objective:

      Fulfill the requirements for a Transportation Management Area (TMA) by ensuring that planning and projects carried out by NIRPC and its local partners consider congestion reduction where possible. Administer and update, as necessary, the Congestion Management Process for Northwest Indiana.


      Prior Task Accomplishments:

      • Adopted Updated Congestion Management Process with MOVE NWI, May 2020.

      • Continuous monitoring of congestion data from NPMRDS, Google Maps API, and in-house collected travel time data.


        Task Description:

        Elements:

        Objective and quantitative evaluation of congestion within the NIRPC region. An operation- oriented approach to the congestion management process will continue to be pursued.


        Activities:

        Ongoing monitoring of congestion-related data and inclusion of congestion-related performance measures on the Annual Performance Dashboard.

        Task Deliverables:

      • New TIP project applications and periodic NWI 2050/TIP Amendment projects will be evaluated with CMP.

      • Staff will conduct ongoing maintenance to the CMP, including populating it with the latest available data.


        Public Engagement Goal:

        Consult


        Corresponding NWI 2050 Initiative:

        Plan for Regional Data and Analysis Framework

        Corresponding NWI 2050 Strategies:

      • Promote future development to occur where utilities and infrastructures, including transit, exist by establishing growth management strategies to ensure that population and employment growth occurs in a sustainable and responsible manner.

      • Concentrate new growth around infrastructure to allow preservation of environmental assets.

      • Work with local entities to develop local ordinances that require new trails and connections in new developments where feasible.

      • Encourage municipalities to update land use regulations to include pedestrian connectivity between land uses.

      • Update Sensible Tools Kit to provide resource to municipalities for better land use planning.

      • Routinely conduct Planning Commission workshops on the Sensible Tools Handbook to continually reinforce best practices in land use planning.

      • Create plans and programs to address the impact of the growth of e-commerce in NWI on travel behavior, logistic systems, and land use planning in partnership with regional and local agencies.

      • Local entities that have passenger rail stations should establish a TOD zoning and policies to support growth around the South Shore and Westlake corridor stations areas.

      • Prioritize transit expansions to job centers.

      • Improve regional connectivity by assisting in the identification of key coordinated stops where transit operators can rendezvous to switch passengers from one service to another.

      • Identify corridors for fixed route transit service and Bus Rapid Transit. Metrics such as population density, congestion, and concentrations of employment may be used in developing priority corridors.

      • Improve pedestrian and bicycle accessibility to high density population areas, employment and retail centers, transit stations, parks, and schools.

      • Prioritize non-motorized facilities that maximize connectivity across counties and municipal boundaries, and Main centers.

      • NIRPC to continue pursuing regional corridor studies within the region to identify improvements and help prioritize future funds.

      • Identify and prioritize high-crash areas that could be improved quickly with cost effective solutions.

      • Improve the regional transportation network by pursuing funding opportunities to address bottlenecks in key regional corridors.

      • Plan to improve campus areas and turn them to great places by creating and incentivizing local student-centered gatherings and nightlife offerings, good mixture of modern cuisine, bars, bike paths, trails, parks, cultural offerings, and outstanding public transit system.

      • Improve the efficiency of transit and curb the costly growth of sprawl, by increasing the overall density of urban areas.

      • Improve resiliency and reduce congestion by sharing data and plans with local Emergency Planning Committees to help them with decision-making and improving evacuation plans.

      • Support the Transit Development District (TDD) of the regional South Shore Corridor TOD areas to develop context-appropriate strategies for creating a network of transit-oriented places and sites that integrate different functions and activities within easy access of transit.

      • Reduce congestion by developing a regional railroad crossing improvement plan with a focus on highway-rail grade separations.

      • Continue working with local university partners on collecting and analyzing data.

      • Share data on traffic volumes and other transportation attributes that NIRPC collects throughout the region.

      • Improve transportation network reliability by compiling, analyzing, and mapping reliability data for roadways to prioritize projects for funding.

      • Reduce congestion and increase transit efficiency by compiling, analyzing, and mapping roadway bottleneck data for to prioritize projects for funding.

      • Improve safety, efficiency, and regional interoperability of the transportation system by developing, maintaining and communicating the Intelligent Transportation Systems Regional Architecture.

      • Improve connectivity for all users by bringing communities to work together on projects affecting shared corridors.

      • Encourage legislators and transportation agencies to explore standardizations in the roadway environment to best accommodate Connected and Automated Vehicles (CAVs).

      • Establish policies to increase affordable and accessible housing near job centers and transit stations/stops.

      • Continue to support transit and complete streets to ensure that all residents have access to schools, grocery stores, community centers, medical facilities, reliable transportation, and job opportunities.

      • Continue Air Quality Public Education, It All Adds Up to Cleaner Air NWI, including emphasis on modal shift.

      • Work with NWI Forum and local governments to meet local and regional needs by strategically investing in targeted transportation connectivity projects that support economic growth.

      • Work with intermodal facilities and freight carriers to identify locations with high levels of freight movement and to plan strategies for alleviating freight-related congestion." Missing second “ mark.


        Corresponding NWI 2050 Performance Measures:

      • All-purpose average trip time

      • Work purpose average trip time

      • Retail/Service purpose average trip time

      • School purpose average trip time

      • Medical care purpose average trip time

      • Other purpose average trip time

      • Percent of non-single occupancy vehicle travel in the Chicago, IL-IN urbanized area

      • Percent of person miles traveled on the Interstate that are reliable

      • Percent of person miles traveled on the non-Interstate NHS that are reliable

      • Truck Travel Time Reliability Index (TTTRI)

      • Peak hours of excessive delay per capita in the Chicago, IL-IN Urbanized Area

    5. | Travel Demand Modeling


      Task Status:

      Ongoing and permanent


      Task Lead:

      Scott Weber


      Task Contributors:

      None


      Task Objective:

      Model region travel demand in Northwestern Indiana and in neighboring areas. The computationally rigorous travel demand model allows NIRPC to support planning and programming activities by identifying the need for, and impact of, plans and projects. Results of modeling help meet federal requirements of air quality conformity and assist NIRPC stakeholders in evaluating some localized travel impacts of projects.


      Prior Task Accomplishments:

      • Ongoing modeling support for various requests from INDOT, Local Public Agencies, transit operators, and other planning partners as needed.

      • Analysis of results from 2018 Household Travel Survey data that will be used to calibrate, validate, and update the NIRPC Travel Demand Model.


        Task Description:

        Elements:

        Model validation, socio-economic forecasts, land-use assumptions, VMT estimates, air quality impacts and customized reports for planning partners. Procure contractor support to update NIRPC Travel Demand Model with Household Travel Survey Data.


        Activities:

        Calibration of NIRPC Travel Demand Model using the 2018 Household Travel Survey Data (updated trip generation from rates in the survey, updated trip distribution patterns, and updated mode choice). Memorandum of findings from the calibration and validation about whether a wholesale Travel Demand Model Update is warranted, and if so, an identification of funding for the update.


        Task Deliverables:

      • Travel Demand Model calibration and validation report with 2018 Household Travel Survey Data delivered to Surface Transportation Committee and/or TPC and posted on NIRPC website.

      • Annual report of how many and which modeling requests have been answered on NIRPC website.

      • Oversee procured Travel Demand Model Update contractor.


        Public Engagement Goal:

        Inform


        Corresponding NWI 2050 Initiative:

        Plan for Regional Data and Analysis Framework


        Corresponding NWI 2050 Strategies:

      • Forecast demand for future land development and the requirements of logistics use to accommodate e-commerce future needs.

      • NIRPC to continue pursuing regional corridor studies within the region to identify improvements and help prioritize future funds.

      • Improve the regional transportation network by pursuing funding opportunities to address bottlenecks in key regional corridors.

      • Develop method to prioritize transformative investments that cost over $10 million in recognition that FHWA/FTA allocated funds are insufficient to program such projects.

      • Reduce congestion increase transit efficiency by compiling, analyzing, and mapping roadway bottleneck data for in order to prioritize funding.

      • Work with NWI Forum and local governments to meet local and regional needs by strategically investing in targeted transportation connectivity projects that support economic growth.

      • Work with intermodal facilities and freight carriers to identify locations with high levels of freight movement and to plan strategies for alleviating freight-related congestion.


      Corresponding NWI 2050 Performance Measures:

      None from NWI 2050 since they deal with actual data, not modeled data. However, in terms of local technical assistance and public involvement, the number of modeling requests received and responded to can be used to measure performance.

    6. | Air Quality Conformity


Task Status:

Ongoing and permanent


Task Lead:

Scott Weber


Task Contributors:

None


Task Objective:

Meet the federal requirements for Air Quality Conformity as they apply to MPO planning and programming for an air quality non-attainment or maintenance area. The task will show that NIRPC fulfills these requirements by only planning and programming projects that fall within motor vehicle emissions budgets and other required parameters.


Prior Task Accomplishments:

  1. | Short Range Planning



    300: Short Range Planning


    Funding Source

    FY 2020

    Amended Funds


    FY 2021


    FY 2022


    Federal PL/5307


    $ 62,200


    $ 15,550


    $ 162,895


    $ 150,065


    Non-Federal


    $ 40,724


    $ 37,516

    TOTAL

    $ 77,750

    $ 203,619

    $ 187,582


    Tasks:



    Tasks or expenses added with 2020 Funds


    TIP development


    Develop or modify -ETIP system to be compatible with E-STIP under development. Maintain current RTIP

    TIP management

    Environmental red flag investigations


    1. | Transportation Improvement Program Development


      Task Status:

      Ongoing and permanent


      Task Lead:

      Charles Bradsky


      Task Contributors:

      Transit Planner, Grant/TIP Assistant


      Task Objective:

      Develop a Notice of Funding Availability (NOFA) to support the development of the Transportation Improvement Program (TIP), continuously learning and adapting from the previous NOFA and stakeholder feedback.


      Prior Task Accomplishments:

      • 2019 Notice of Funding Availability (NOFA).

      • The 2020-2024 TIP was developed in alignment with NWI 2050.

      • Online/digital publication of the 2020-2024 TIP in interactive, searchable format.

      • Positive working relationship with LPAs, transit operators, INDOT, FHWA & FTA.

      • Technical assistance to transit operators and LPAs during the 2019 NOFA.


        Task Description:

        Elements:

      • Solicit feedback on the 2020 NOFA.

      • Develop a set of improvements for the 2022-2028 TIP NOFA.

      • Maintain a good working relationship with LPAs, transit operators, INDOT, FHWA, and FTA.


        Activities:

      • Maintain online/digital TIP.

      • Solicit and implement feedback for NOFA development.

      • Implement feedback on transformative investments.


        Task Deliverables:

      • Living online/digital TIP document.

      • Living spreadsheet showing status of TIP.

      • Annual List of Obligated Projects for Federal and state officials, and a similar document developed for public use.


        Public Engagement Goal:

        Consult


        Corresponding NWI 2050 Initiative:

        Plan for Continually Improved Investment Prioritization


        Corresponding NWI 2050 Strategies:

      • Prioritize funding for transit-oriented development.

      • Prioritize investment of roads, public transit, and other infrastructure to improve the market of the identified Tax Increment Finance zones, opportunity zones, and disinvested areas.

      • Prioritize transit investments that better connect the Environmental Justice populations to job centers, medical facilities, recreations centers, shopping districts, and educational institutions.

      • Prioritize transit investments that connect communities in environmental justice areas, people who are elderly, low-income, people with disabilities, and veterans.

      • Purchase clean energy and fuel transit vehicles.

      • Identify and prioritize high-crash areas that could be improved quickly with cost effective solutions.

      • Improve the regional transportation network by pursuing funding opportunities to address bottlenecks in key regional corridors.

      • Improve the accessibility of regional pedestrian and transit infrastructure by allocating funding for the implementation of locally developed ADA transition plans and incorporating Universal Design standards so all public infrastructure meets or exceeds ADA standards.

      • Continue to prioritize transportation funding in older communities and livable centers to improve public infrastructure and redevelopment.


      Corresponding NWI 2050 Performance Measures:

      The nature of this task impacts all performance measures addressed by projects submitted into the TIP.


    2. | TIP Development + Management


      Task Status:

      Ongoing and permanent


      Task Lead:

      Charles Bradsky


      Task Contributors:

      Transit Planner and Grant/TIP Assistant


      Task Objective:

      Through periodic amendments and modifications, maintain a fiscally constrained five-year multi- modal investment program reflecting the vision and goals of NWI 2050, implementing the performance-based planning framework, adhering to air quality conformity rules, and utilizing a robust and transparent public participation process.


      Prior Task Accomplishments:

      • Local Quarterly Tracking meetings/reports.

      • As-needed TIP amendments & modifications.

      • Annual List of Obligated Projects (ALOP).

      • Continue to use stakeholder input to improve digital TIP functions and processes.

      • Continue to work with INDOT to ensure compatibility between NIRPC’s digital TIP and the State Transportation Improvement Plan (STIP).


        Task Description:

        Elements:

        1. Coordinate transportation projects within the established committee structure. 2) Maintain the 2020-2024 TIP by introducing amendments and administrative modifications with the intent on delivering a full portfolio of projects with the resources available to the NIRPC region. 3) Maintain a fiscally constrained five-year spending plan of federal funds allocated to NWI. 4) Maintain a current list of Employee in Responsible Charge (ERC) for each LPA. 5) Organize and conduct quarterly tracking meetings to assess the viability of project letting; recommend amendments as needed. 6) Employ project selection criteria, as applicable, to inform decision-makers on the merit of each proposed project. 7) Maintain a good working relationship with LPAs, transit operators, INDOT, FHWA, and FTA. 8) Publish a list of obligated projects, known as the Annual List of Obligated Projects (ALOP), within the allocated timeline from DOT and INDOT. Maintain e-TIP. Contract for development/improvements to R-TIP to enhance compatibility with the new system under development by INDOT.


          Task Deliverables:

      • Local Quarterly Tracking meetings/reports.

      • As-needed amendments and modifications.

      • Documentation of the number and percentage of projects let for construction per program year as originally published in the TIP.

      • An improved, functionable, serviceable e-TIP that NIRPC team members can use to perform a variety of essential functions, and also shares and invites collaboration from the public.


        Public Engagement Goal:

        Consult


        Corresponding NWI 2050 Initiative:

        Plan for Continually Improved Investment Prioritization


        Corresponding NWI 2050 Strategies:

      • Prioritize funding for transit-oriented development.

      • Prioritize investment of roads, public transit, and other infrastructure to improve the market of the identified Tax Increment Finance zones, opportunity zones, and disinvested areas.

      • Prioritize transit investments that better connect the Environmental Justice populations to job centers, medical facilities, recreations centers, shopping districts, and educational institutions.

      • Prioritize transit investments that connect communities in environmental justice areas, people who are elderly, low-income, people with disabilities, and veterans.

      • Purchase clean energy and fuel transit vehicles.

      • Identify and prioritize high-crash areas that could be improved quickly with cost effective solutions.

      • Improve the regional transportation network by pursuing funding opportunities to address bottlenecks in key regional corridors.

      • Improve the accessibility of regional pedestrian and transit infrastructure by allocating funding for the implementation of locally developed ADA transition plans and incorporating Universal Design standards so all public infrastructure meets or exceeds ADA standards.

      • Continue to prioritize transportation funding in older communities and livable centers to improve public infrastructure and redevelopment.


      Corresponding NWI 2050 Performance Measures:

      The nature of this task impacts all performance measures addressed by projects submitted into the TIP.

    3. | Environmental Red Flag Investigations

Task Status:

Ongoing and permanent

Task Lead:

Joe Exl

Task Contributors:

Candice Eklund

Task Objective:

To enhance the performance of the transportation system and transportation projects while protecting and enhancing the natural environment.

Prior Task Accomplishments:

Conduct red flag investigations as needed.


Task Description:

Activities:

Early coordination with LPAs for local projects. NIRPC will send letters to LPAs informing them that a Red Flag Investigation will need be needed following NOFA. This can either be done by NIRPC or consultant. Trigger will be DES number being assigned to a project. NIRPC will continue to review and complete Red Flag Investigations, as needed, in response to early coordination letters.


Task Deliverables:


Corresponding NWI 2050 Performance Measures:

The nature of this task impacts all performance measures addressed by projects submitted into the TIP, that have requested a red-flag investigation.

  1. | Long Range Planning


    400: Long Range Planning


    Funding Source

    FY 2020

    Amended Funds


    FY 2021


    FY 2022

    Federal PL/5307

    $ 61,600

    $ 444,936

    $ 342,879

    Non-Federal

    $ 15,400

    $ 111,234

    $ 85,720

    TOTAL

    $ 77,000

    $ 556,169

    $ 428,598


    Tasks:



    Tasks or expenses added with 2020 Funds


    CRP implementation Development



    Transit Oriented Development (TOD)



    Sensible Tools Handbook Update



    Public Health and Transportation



    Regional land use planning





    Living Streets Design Guidelines

    Surface transportation planning



    Environmental linkages planning


    Vulnerability Assessment Consultant

    1. | Comprehensive Regional Plan Development


      Task Status:

      Ongoing and permanent


      Task Lead: Open Planner Position

      Task Contributors: Mitch Barloga, Charles Bradsky, Joe Exl, Eman Ibrahim, Peter Kimball, Kevin Polette, and Scott Weber

      Task Objective:

      Using NWI 2050 as the cornerstone, provide needed updates to NIRPC’s long-range planning efforts as determined through public outreach and stakeholder input.


      Prior Task Accomplishments

      NWI 2050, adopted May 2019


      Task Description:

      Elements:

      A multi-step process reflecting on the successes and work to be completed from NWI 2050, the updated plan will continue to articulate regional vision and needs, identify influences on our future, anticipate impacts of different possible futures. Additionally, the plan will also continue to refine the performance-based planning system created in NWI 2050, redefine defensible and clear evaluation criteria, and revise strategies and investments to improve our region, and identify partners to help us move towards the future. Planning updates to NWI 2050 will include robust public input, especially from Title VI and Environmental justice communities, and a continued commitment to data collection and analysis.


      Task deliverables:

      Planning updates to NWI 2050.


      Public Engagement Goal:

      Collaborate


      Corresponding NWI 2050 Initiative:

      Plan for Transformative Investments


      Corresponding NWI 2050 Strategies:

      The nature of this task impacts all plan strategies addressed by all other tasks in this document.


      Corresponding NWI 2050 Performance Measures:

      The nature of this task impacts all performance measures addressed by all other tasks in this document.

    2. | NWI 2050 Implementation


      Task Status:

      Ongoing and permanent


      Task Lead:

      Eman Ibrahim


      Task Contributors:


      Task Objective:

      Study, research, plan, and implement the vision and strategies of NWI 2050, the long-range plan for the MPO. This task focuses on making connections between transportation planning and programming, for both highway and transit, and other demonstrated needs in the region from NWI 2050, chiefly tasks that assist in making impacts on the sixteen critical paths to achieve the four plan visions statements for NWI: Connected NWI, Renewed NWI, United NWI, and a Vibrant NWI.


      Prior Task Accomplishments:

      • Completed E-Commerce in NWI report.

      • Finalized TOD investment guidelines, project eligibility, evaluation criteria, and recommended funding allocations.

      • Finalized TOD in NWI Program Funding report.

      • Mapped potential TOD areas that include land uses, economic development, and land development within the potential area.

      • Developed a public health and transportation “brochure” as a conversation starter of the topic.

      • Completed the Sensible Tools Handbook Update and identified new tools.


        Task Description:


        Elements:

      • Transit-oriented Development (TOD):

        • To bring vitality and livability to transit station areas and transit corridors. The activities of this task will support the implementation of NWI 2050 and its strategies and economic development of the Region. It supports linking transportation investments with land use decisions within the region.

      • Public Health and Transportation:

        • Task aims to better understand the linkage between public health and transportation and implement transportation projects that will improve health outcomes in the region. An assessment of existing conditions will be conducted by analyzing existing data and gathering missing data. Mapping the data and analyzing impacts to socioeconomic and geographic equity. Develop a set of recommendations for the next long-range plan and TIP programming.

      • Sensible Tools Handbook Update:

        • Conduct Planning Commission workshops on the Sensible Tools Handbook in 2021.

        • Develop a press release for the workshop.

      • Implementation of E-Commerce in NWI project:

        • Establish further plans, capacity building, and funding to optimize e-commerce opportunities within the region.

        • Improve regional transportation network connectivity to mitigate congestion on major arterials and interstates.


          Activities:

      • Transit-oriented Development (TOD):

        • Continue to establish an on-going TOD planning effort with municipal and transit partners. Publish funding program and identify funding sources. Keep a page of the website up to date with project updates, facts, figures, presentations, etc.

        • Coordinate TOD areas with the TDD areas published by the Regional Development Authority (RDA)

      • Public Health and Transportation:

        • Continue ongoing work from the previous UPWP. Continue to complete the assessment of existing conditions. Continue to research and incorporate FHWA and DOT resources, objectives, and recommendations. Analyze impacts to socioeconomic and geographic equity, with performance measures including vehicle miles traveled, travel time, and housing-transportation affordability. Explore health impact assessments as a tool for potential use in NWI. Identify health indicators related to transportation. Continue to work and coordinate with the NWI Food Council. Finally, develop solutions and strategies for consideration by the Commission and regional stakeholders.

      • Sensible Tools Handbook Update:

        • Introduce and present the Handbook Update to the local government’s planners and elected officials.

        • Plan for a training workshop for planning commissioners and/or elected officials.

        • Engage in outreach & communications for report and training opportunities.


      • Resiliency

        • Planning transportation team members will support the Regional Economic Resiliency Planning project and consultants funded by the Economic Development Administration. This will ensure factors such as freight, e-commerce, transit and information gleaned from the Transportation System Vulnerability assessment are incorporated.

      • Implementation of recommendations from 2020 E-Commerce in NWI project:

        • Develop sub-area plans that address transportation improvements and accessibility.


          Identify a funding mechanism and strategies for the sub-area plans.

          Task Deliverables:

          • TOD:

            • A TOD funding program approach.

            • Coordinated Regional TOD work with the Regional Development Authority (RDA), Northern Indiana Commuter Transit District (NICTD), and public bus agencies.


            • A new TOD funding program included into TIP.

          • Public Health and Transportation:

            • Continued data collection and analysis including update databases and regional maps

            • Social media content

            • Recommendations to stakeholders and to NIRPC’s NOFA process if applicable, folding public health into long-range planning and TIP programming

          • Sensible Tools Handbook:

            • Final updated handbook/report

            • Workshops for planning commissioners and/or elected officials


          • Resiliency Planning:

            • Transportation elements incorporated into the Regional Economic Development District Resiliency Plan.


          Public Engagement Goal:

          Collaborate


          Corresponding NWI 2050 Initiative:

      • Plan for Main Centers and Transit Oriented Development

      • Plan for Smart Land Uses and Quality of Place


        Corresponding NWI 2050 Strategies:

      • Improve pedestrian and bicycle accessibility to high density population areas, employment and retail centers, transit stations, parks, and schools.

      • Prioritize funding for transit-oriented development.

      • Prioritize transit investments that better connect the Environmental Justice populations to job centers, medical facilities, recreations centers, shopping districts, and educational institutions.

      • Prioritize transit investments that connect communities in environmental justice areas, people who are elderly, low income, people with disabilities, and veterans.

      • Improve the accessibility of regional pedestrian and transit infrastructure by allocating funding for the implementation of locally developed ADA transition plans and incorporating Universal Design standards so all public infrastructure meets or exceeds ADA standards.

      • Plan to improve campus areas and turn them to great places by creating and incentivizing local student-centered gatherings and nightlife offerings, good mixture of modern cuisine, bars, bike paths, trails, parks, cultural offerings, and outstanding public transit system.

      • Improve the efficiency of transit and curb the costly growth of sprawl, by increasing the overall density of urban areas.

      • Provide technical assistance for TOD planning.

      • Support the Transit Development District (TDD) of the regional South Shore Corridor TOD areas to develop context-appropriate strategies for creating a network of transit-oriented places and sites that integrate different functions and activities within easy access of transit.

      • Continue to support transit and complete streets to ensure that all residents have access to schools, grocery stores, community centers, medical facilities, reliable transportation, and job opportunities.

      • Improve downtowns and Main Centers to anchor businesses and enhance the local economy.

      • Prioritize investment of roads, public transit, and other infrastructure to improve the market of the identified opportunity zones and disinvested areas.

      • Prioritize transit to include priority destinations of senior and veteran centers, vocational rehabilitation centers, retail, recreation, health-related locations, and other places transit riders prioritize as destinations.

      • Improve economic opportunity for prosperity particularly for EJ residents & people with disabilities to ensure that NWI is a destination for business & diverse human capital.

      • Improve accessibility to the transportation system for all users by expanding shared mobility awareness and opportunities regionally.

      • Improve customer experience by linking individuals that live in environmental justice communities to fresh food resources by developing partnerships between food distributors and transit operators to bring food access to transit facilities.

      • Increase the use of transit by prioritizing transit expansions that close the gap between environmental justice populations and fresh food resources, to increase the health and well- being of those populations.

      • Continue conservation and urban forestry planning to help connect fragmented natural areas, increase resiliency, and health outcomes.

      • Encourage the incorporation of pollution prevention and environmental impact avoidance in regional and local land use, transportation, flood and stormwater management and mitigation planning to enhance future environmental quality.

      • Encourage communities to adopt tree protection ordinances to increase resiliency, health outcomes and habitat connectivity in the urban environment.

      • Increase park space and green infrastructure to promote an inclusive and healthy environment especially in Environmental Justice communities.

      • Encourage communities to adopt tree protection ordinances to reduce exposure to urban air pollution and reduce urban stormwater pollution runoff.

      • Create long term regional urban forestry plan and program to reduce human exposure to urban air pollution and stormwater pollution runoff.

      • Continue CommuniTree Program to reduce exposure to urban air pollution and reduce urban stormwater runoff.

      • Promote best practices to reduce transportation emissions.

      • Seek funding for projects that reduce diesel emissions in NWI.

      • Support the continuation of Vehicle Emission Testing Program.

      • Demonstrate the positive impact of transit and other transportation choices on economic development, workforce participation, public health, and personal/household income

      • Improve pedestrian and bicycle accessibility to high density population areas, employment and retail centers, transit stations, parks, and schools.

      • Encourage the incorporation of pollution prevention and environmental impact avoidance in regional and local land use, transportation, flood and stormwater management and mitigation planning to enhance future environmental quality.

      • Update Sensible Tools Kit to provide resource to municipalities for better land use planning.

      • Routinely conduct Planning Commission workshops on the Sensible Tools Handbook to continually reinforce best practices in land use planning.

      • Continue to offer workshops on the Sensible Tools Handbook to provide guidance to local government on best practices of sustainable growth and vibrant communities and to understand how land use choices affect local revenues.

      • Promote future development to occur where utilities and infrastructures – including transit - exist by establishing growth management strategies to ensure that population and employment growth occurs in a sustainable and responsible manner.

      • Develop form-based code rezoning to allow higher densities and mixed-uses to create more livable communities and maintain more human scale environment and spaces that create an inclusive, accessible, and pedestrian focused community character.

      • Help local governments adopt and keep up to date open space plans and public access standards to increase accessibility to open space and parks.

      • Work with local entities to develop local ordinances that require new trails and connections in new developments where feasible.

      • Encourage municipalities to update land use regulations to include pedestrian connectivity between land uses.

      • Forecast demand for future land development and the requirements of logistics use to accommodate e-commerce future needs.

      • Create plans and programs to address the impact of the growth of e-commerce in NWI on travel behavior, logistic systems, and land use planning in partnership with regional and local agencies.

      • To accommodate trending technologies, adapt local land use. For example, the impacts from online shopping that decreases the need for commercial and retail land use but increases the demand for logistics centers.

      • Explore new tax structures to address anticipated issues with the decrease in property tax revenue with the closure of brick-and-mortar retail from the growth in online shopping to continue to sustain local public services.

      • Establish partnerships between educational institutions, e-commerce leaders, and workforce development, to explore job training to meet the future skill demands that includes IT expertise, call centers, distribution centers, warehouses, packaging, online web content writers, photographers, designers, telecommuting, home-based business, freight drivers, etc.

      • Coordinate in advance with private sector development of e-commerce facilities that will heavily utilize public infrastructure and seek information regarding their transportation needs to improve the overall efficiency.

      • Develop and expand warehouse floor space and distribution centers fore-commerce growth.

      • Work with NWI Forum and local governments to meet local and regional needs by strategically investing in targeted transportation connectivity projects that support economic growth.

      • Work with intermodal facilities and freight carriers to identify locations with high levels of freight movement and to plan strategies for alleviating freight-related congestion.

      • Work with intermodal facilities and freight carriers to identify locations with high levels of freight movement and to plan strategies for alleviating freight-related congestion.

      • Create a parcel-based map of current and potential business locations along major NWI corridors to help identify economic centers and prioritize future transportation improvements.


        Corresponding NWI 2050 Performance Measures:

      • Percent of population within ¼-mile network distance to a trail or bicycle facility

      • Number of people within fixed-route transit service areas (¼ mile for bus, ½ mile for commuter bus and commuter rail)

      • Population in “Main Centers”

      • Employment in “Main Centers”

      • Average Walk Score in “Main Centers”

      • Population in Environmental Justice areas within transit service areas

      • Jobs within transit service areas of fixed-route transit

      • Public Health and Transportation:

      • Medical care purpose average trip time

      • Number of annual ozone emission critical value exceedances

      • Volatile Organic Compounds (VOC) reduction from Congestion Mitigation Air Quality (CMAQ)- funded projects (kg/day)

      • Oxides of Nitrogen (NOx) reduction from Congestion Mitigation Air Quality (CMAQ)-funded projects (kg/day)

      • Carbon Monoxide (CO) reduction from Congestion Mitigation Air Quality (CMAQ)-funded projects (kg/day)

      • Particulate Matter less than 10 microns in diameter (PM10) reduction from Congestion Mitigation Air Quality (CMAQ)-funded projects (kg/day)

      • Percent of Environmental Justice (EJ) area population within ¼-mile of a trail or multi-use path

      • Population in Environmental Justice areas within transit service areas

      • Jobs within transit service areas of fixed-route transit

      • Life Expectancy

      • Premature deaths per 100k

      • Percent adults reporting physical inactivity

      • Number of poor mental health days per month

      • Number of alternatively fueled/powered vehicles registered

      • Acres in managed lands-NWI residents, employees, and visitors should be able to access natural areas and green spaces that are maintained and protected from future development.

      • Acres in core habitat (40 + acres)

    3. | Regional Land Use Planning

      Task Status:

      Ongoing and permanent

      Task Lead:

      Eman Ibrahim


      Task Contributors:

      None


      Task Objective:

      Support community-based transportation and land use projects that bring vitality to downtown areas, neighborhoods, transit station areas, commercial cores, and transit corridors. Studies and planning activities will seek development and redevelopment projects that achieve connected development patterns linking between transportation, housing, jobs and services, and maximizing the development potential of existing infrastructure and regional facilities.


      Prior Task Accomplishments:

      • Reviewed and updated NOFA planning projects and TDD plans; supported the implementation of NIRPC 2050 Plan projects and its strategies; recommendations and directions and reviewed by the Land Use Committee.

      • Partially updated the inventory of comprehensive plans, zoning maps, and land use, and other documents.

      • A coordinated and updated regional land use and transportation GIS data

      • Presentation, maps, and graphics for the Land Use Committee- Local governments technical assistance.

      • Up to date regional land use-related website materials.

        Task Description:

        Elements:

        Implement strategies that link transportation and land use planning and economic development considerations. Develop a framework that provides regional consistency on issues of common importance and functional compatibility, while allowing individual entities to retain their individual and autonomous authority. Provide support to the Land Use Committee. Identify regionally significant transportation projects in local land use plans to include in the air quality travel- demand model. Participate in and contribute to local governments planning activities, including technical assistance as needed by designation of Transit Development District (TDD) committee established by the Regional Development Authority (RDA).


        Activities:

      • Continue to staff and support the land use committee

      • Continue to support linking transportation investments with land use decisions in NWI

      • Update the regional existing and future land use maps as well as the zoning map

      • Continue to provide local governments technical assistance.

        Task Deliverables:

      • An updated regional land use and zoning maps

      • Four meeting of the land use committees

      • Recommendations for the NOFA planning and construction projects

      • Local governments assistance activities.


        Public Engagement Goal:

        Collaborate


        Corresponding NWI 2050 Initiative:

        Plan for Smart Land Uses and Quality of Place


        Corresponding NWI 2050 Strategies:

      • Promote future development to occur where utilities and infrastructures – including transit - exist by establishing growth management strategies to ensure that population and employment growth occurs in a sustainable and responsible manner.

      • Develop form-based code rezoning to allow higher densities and mixed-uses to create more livable communities and maintain more human scale environment and spaces that create an inclusive, accessible, and pedestrian focused community character.

      • Establish special zoning for historic districts and national and register buildings.

      • Work to adjust zoning regulations to allow non-retail and adaptive uses in closed big box retail.

      • Establish inclusionary housing policies to preserve the affordability of the Region’s housing stock before market conditions change (i.e., interest rates increase) and as the Region is revitalized.

      • Concentrate new growth around infrastructure to allow preservation of environmental assets.

      • Provide incentives to developers to include affordable, accessible, integrated and inclusive housing as part of the development of market-rate housing.

      • Incorporate policies and strategies in transportation funding to support main centers, revitalization, areas and emphasize infill.

      • Plan to repurpose big box retail, large commercial areas, and other uses as well as the large surface parking to turn into distribution centers, logistics hubs, supply spaces where the supported infrastructure is available or become public spaces.

      • Help local governments adopt and keep up to date open space plans and public access standards to increase accessibility to open space and parks.

      • Promote importance of natural area protection, connectivity and accessibility with local governments and agencies to encourage local implementation.

      • Encourage municipalities to update land use regulations to include pedestrian connectivity between land uses.

      • Work with local entities to develop local ordinances that require new trails and connections in new developments where feasible.

      • Provide incentives for downtown investment to increase density of population and employment.

      • Promote adaptive reuse of existing buildings in downtown and main centers area for shared office space and infill to accommodate entrepreneurs, startups, and remote workers.


        Corresponding NWI 2050 Performance Measures:

      • Acres in managed lands-NWI residents, employees, and visitors should be able to access natural areas and green spaces that are maintained and protected from future development.

      • Acres in core habitat (40 + acres).

      • Percent of population within ¼-mile network distance to a trail or bicycle facility

      • Number of people within fixed-route transit service areas (¼ mile for bus, ½ mile for commuter bus and commuter rail).

      • Population in “Main Centers”- Maximize growth in existing centers to enhance civic and economic life and to protect natural areas and farmland.

      • Employment in “Main Centers”.

    4. | Surface Transportation Planning

      Task Status:

      Ongoing and permanent


      Task Lead:

      Scott Weber


      Task Contributors:

      Peter Kimball


      Task Objective:

      Study, research, plan, and implement the improvement of the surface transportation network within the region, for roadway corridors, freight, Intelligent Transportation Systems, and safety and security.


      Prior Task Accomplishments:

      • Production of Surface Transportation Committee Meetings: overseeing planning and programming related to surface transportation, formation of Rail Crossing Task Force, and formation of a Freight and Congestion Working Group.

      • NIRPC input related to the production of the INDOT Statewide Corridor Planning Study.

      • Resolution 19-23, adopted by the NIRPC Executive Board, recommending the designation of Willowcreek Rd/Crisman Rd. as a Critical Urban Freight Corridor.

      • Plan support for the Freight and Congestion Working Group Plan to designate the remainder of Indiana's 94 centerline miles a Critical Urban Freight Corridors.

      • Ongoing work continues on overseeing the Intelligent Transportation Systems Regional Architecture

      • Ongoing work on NIRPC's safety planning activities, including the adoption of new annual safety performance measures.


        Task Description:

        Elements and activities:

      • Corridor Planning

        • Convene stakeholders impacted by INDOT's Statewide Corridor Planning Study and its associated projects in order to educate Local Public Agencies and other stakeholders about opportunities to incorporate their expectations into the INDOT projects. Goal is to hold targeted meetings with all stakeholders impacted in FY 2021. Corridor-based strategies from NWI 2050 and NIRPC's Regional Corridors Study will continue to be discussed at Surface Transportation Committee meetings.

      • Freight Planning:

        • Participate in the Indiana MPO Council Committee on Designating Critical Urban and Rural Freight Corridors, which NIRPC Staff will chair. Track issues and trends in freight transportation and coordinate freight planning with local, regional, and state agencies. Implement NWI 2050 freight-related strategies.

      • Intelligent Transportation Systems:

        • Meet the federal requirements for Intelligent Transportation Systems (ITS) as they pertain to a Transportation Management Area (TMA) and fulfill the requirements for a Regional ITS Architecture and the monitoring, updating, and implementing that Regional ITS Architecture. Keep the Regional ITS Architecture current. Educate project sponsors of ITS projects about their requirements to have a system engineering analysis.

      • Safety and security planning:

        • Begin offering local technical assistance by conducting Road Safety Audits (RSAs). Make stakeholders aware that NIRPC offers RSAs at Quarterly Tracking meetings and the Surface Transportation Committee Meetings, convening a working group if necessary. Serve as a point of contact for regional safety information for both internal and external partners. Assist with the monitoring of the safety performance measures to comply with the FAST Act.


      • Research, data collection, and development related to Traffic Incident Management (TIM)


      • Research, data collection, and development related to Local Road Safety Plans (LRSPs)

      • Asset Management Planning:

        • Collect NIRPC municipalities' and counties' asset management plans and any asset management data they may have to support those plans. Begin an asset management planning working group about how NIRPC can best combine Local Public Agencies' asset management planning efforts (or at least those willing to opt in) in order to better prepare Local Public Agencies to more strategically apply for future Notice of Funding Availability and other funding opportunities in such a way as for them to be most successful and appropriately staggered.

          Task Deliverables:

      • Social media and newsletter blurbs about meetings held with stakeholders impacted by INDOT's Statewide Corridor Planning Study and how their desires are being incorporated into future project scopes.

      • Designation of Critical Urban and Rural Freight Corridors in Indiana, including in the NIRPC region.

      • Updated Regional ITS Architecture.

      • Inclusion of how many Road Safety Audits NIRPC staff conducted on the Annual Performance Dashboard.

      • Adoption of new Safety Performance Measure Targets.

      • Formation of an asset management planning working group.

      • Inclusion of asset management data on the Annual Performance Dashboard. Public Engagement Goal:

        Involve


        Corresponding NWI 2050 Initiative:

        Plan for Continually Improved Investment Prioritization


        Corresponding NWI 2050 Strategies:

      • NIRPC to continue pursuing regional corridor studies within the region to identify improvements and help prioritize future funds.

      • Encourage legislators to look at asset management needs statewide and match those to future funding opportunities such as the Community Crossings Grant Program.

      • Improve connectivity for all users by bringing communities to work together on projects affecting shared corridors.

      • Work with intermodal facilities and freight carriers to identify locations with high levels of freight movement and to plan strategies for alleviating freight-related congestion.

      • Improve access to freight funding by establishing and updating critical urban and rural freight corridors and utilizing National Freight Program funding for projects in NWI.

      • Improve the regional transportation network by pursuing funding opportunities to address bottlenecks in key regional corridors.

      • Reduce congestion by developing a regional railroad crossing improvement plan with a focus on highway-rail grade separations.

      • Improve safety through street design standards and traffic calming treatments to accommodate the movement of pedestrian, bicyclists, elderly people, and people with disabilities.

      • Identify and prioritize high-crash areas that could be improved quickly with cost effective solutions.

      • Improve resiliency and reduce congestion by sharing data and plans with local Emergency Planning Committees to help them with decision-making and improving evacuation plans.

      • Improve emergency response times and reduce congestion by convening a regional stakeholder group to plan signal preemption and signal coordination projects.


        Corresponding NWI 2050 Performance Measures:

      • Number of fatalities

      • Rate of fatalities per 100 million vehicle miles traveled

      • Number of serious injuries

      • Rate of serious injuries per 100 million vehicle miles traveled

      • Number of non-motorized serious injuries and fatalities

      • Total number of reportable fatalities and rate per total vehicle revenue miles by mode

      • Total number of reportable injuries and rate per total vehicle revenue miles by mode

      • Total number of reportable events and rate per total vehicle revenue miles by mode

      • Percent of Interstate pavements in good condition

      • Percent of Interstate pavements in poor condition

      • Percent of non-Interstate National Highway System (NHS) pavements in good condition

      • Percent of non-Interstate National Highway System (NHS) pavements in poor condition

      • Percent of National Highway System (NHS) bridge area in good condition

      • Percent of National Highway System (NHS) bridge area in poor condition

      • Truck Travel Time Reliability Index (TTTRI)

    5. | Environmental Linkages Planning


Task Status:

Ongoing and permanent


Task Lead:

Joe Exl


Task Contributors:

Kathy Luther


Task Objective:


Identify areas in which transportation planning and the environment intersect in the region. Plan for enhancement and mitigation opportunities. Evaluate the resiliency of our transportation network as it relates to environmental and other disruptive influences. Facilitate transportation planning coordination with environmental and natural resource planning partners. Ensure that NIRPC long-range transportation plans are consistent with environmental resource agency plans. General environmental mitigation planning and coordination with regulatory agencies will be included in this task. Identify transportation infrastructure vulnerability to climate change and extreme weather.


Prior Task Accomplishments:

  1. | Multi-modal Planning


    500: Multi-modal Planning

    FY 2020

    Funding Source Amended Funds


    FY 2021


    FY 2022

    Federal PL/5307 $ -

    Non-Federal $ -

    $ 245,214

    $ 61,304

    $ 207,692

    $ 51,923

    TOTAL $ -


    Tasks:

    Active transportation planning

    Transit planning (programmed in 5307)

    $ 306,518

    $ 259,616

    1. | Active Transportation Planning


      Task Status:

      Ongoing and permanent


      Task Lead:

      Mitch Barloga


      Task Contributors:

      Peter Kimball, Kevin Polette, and an intern


      Task Objective:

      • Active Transportation Technical Assistance:

        • Assist municipalities and advocates with active transportation project and policy development.

      • Active Transportation Data Collection and Analysis

        • Collecting baseline active transportation data for performance measures and to aid with municipal planning and policy development.

      • Active Transportation Public Engagement:

      • Active Transportation Technical Assistance:

        • Ongoing dialogue with municipal and advocate representatives, including updates at Ped, Pedal and Paddle Committee meetings.

      • Active Transportation Data Collection

        • Maintenance of trail counters and reporting of counts.

        • Updated bicycle data layer in GIS.

      • Active Transportation Public Engagement:

        • Active Transportation-related updates on social media and public presentations.

          Task Description:

          Elements:

          This ongoing task is related to the continuing effort to improve the walkable and bikeable modal functions of Northwestern Indiana. Through technical assistance, data collection and analysis, and public engagement; this task aims to make the region a safer place to walk and bike.


          Activities:

          Activities for this task include ongoing direct collaboration with LPAs regarding funding, strategy, design, and implementation of active transportation projects and policies.


          Task Deliverables:

      • Active Transportation Technical Assistance:

        • Ongoing collaboration with regional stakeholders including municipalities, advocates, non-profits and other partners including Title VI, EJ and ADA protected communities.

        • Maintenance of trail counters and reporting of counts.

        • Maps highlighting future routes.

        • Workshops, seminars, and webinars on important topics.

        • Ongoing reports to INDOT regarding NIRPC, LPA, and transit operator recommendations on proposed project scope.

        • Creation of bicycle tourism strategies/plans that are tailored to specific stakeholders.

      • Active Transportation Data Collection and Analysis:

        • Establishment of performance measure baselines for non-motorized transportation policy and projects as identified in the G+B 2020 Plan and NWI 2050


      • Mapping bicycle and pedestrian crash data in NWI

        • Elevated trail feasibility study: examine potential multi-use trail conversions of abandoned rail corridors that tie into regional systems. Conduct public outreach with LPAs on neighborhood feedback regarding project. Produce planning document outlining strategies to develop trail along with neighborhood revitalization policies. Proceed with implementation if a project is viable.

        • Walk access study: Planners will use GIS to prioritize the development of a sidewalk inventory. Interns will use web-based tools such as Google Maps to assess the access of key connectivity areas.

        • Promote Vision Zero policies for improved pedestrian safety: Set specific regional traffic safety goals, and measure and report out progress. Measure causes of serious crashes and focus on equitable investments. Share safety resources with all regional jurisdictions. Recommend countermeasures and speed management strategies and offer training for local staff.

      • Active Transportation Public Engagement:

        • Regular social media posts; podcasts; NIRPC and public presentations; online educational materials. Acquire placards to help communities mark United States Bicycle Trail routes.

          Public Engagement Goal:

          Collaborate


          Corresponding NWI 2050 Initiative:

          Plan for Complete Streets and Active Transportation


          Corresponding NWI 2050 Strategies:

      • Improve pedestrian and bicycle accessibility to high density population areas, employment and retail centers, transit stations, parks, and schools.

      • Establish a process to link shorter and local trails to the regional trail network through local planning efforts.

      • Prioritize non-motorized facilities that maximize connectivity across counties and municipal boundaries, and Main centers.

      • Collaborate with entities and local landowners on high priority new trail corridors opportunities.

      • Incorporate when feasible Universal Designs standards for non-motorized access that comply with ADA standards.

      • Work with local entities on the development of a sidewalk maintenance plan which inventories facilities in need of repair or missing segments sidewalks and curb cuts/ramps and functional auditory signaling.

      • Promote placemaking themes and create a unique identity along trail corridors and at significant bus and rail transit stops to attract a wide range of users by using public art and provide amenities.

      • Make pedestrian and biking areas safe and more desirable for users by providing amenities like lighting benches, drinking fountains, restrooms, etc.

      • Continue to support the policy of progressive maintenance / asset management plan per all newly funded federal-aid trail projects.

      • Prioritize bicycle and pedestrian safety and comfort by reviewing and adjusting traffic speeds.

      • Promote a region-wide bicycle tourism market with the adoption of "Trail Towns" and similar designations. www.trailtowns.org

      • Implement the Complete Streets Policy through programming and project scoping assistance. Assist municipalities and counties in adopting Complete Streets Policies/Ordinances.

        Corresponding NWI 2050 Performance Measures:

      • All Purpose Average Trip Time

      • Work Purpose Average Trip Time

      • School Purpose Average Trip Time

      • Percent of Population within ¼-mile Network Distance to a Trail or Bicycle Facility

      • Percent of Population within ¼-mile Network Distance to a Trail or Bicycle Facility Crossing Municipal/County Jurisdictions

      • Number of Non-Motorized Serious Injuries and Fatalities

      • Total Number of Reportable Injuries and Rate per Total Vehicle Revenue Miles by Mode

      • Average Walk Score in “Main Centers”

      • Percent of Environmental Justice (EJ) Area Population within ¼-mile of a Trail or Multi-Use Path

      • Percent Adults Reporting Physical Inactivity

    2. | Transit Planning


Task Status:

Ongoing and permanent


Task Lead:

Open Mid-Level Planner Position


Task Contributors:

Transportation Director, Peter Kimball, Kevin Polette, and an intern


Task Objective:

Plan and coordinate regional transit, provide a forum for transit investment decisions in the region, assist transit operators with technical assistance, and oversee administrative processes to guarantee an ongoing commitment to funding transit.

Prior Task Accomplishments:


  1. | Special Planning Activities


    600: Special Planning Activities


    Funding Source

    FY 2020 Amended Funds


    FY 2021


    FY 2022

    Federal PL/5307

    $ 101,600

    $ -

    $ 14,688

    Non-Federal

    $ 25,400

    $ -

    $ 3,672

    TOTAL

    $ 127,000

    $ -

    $ 18,360


    Tasks:

    2022 New Tasks

    Oversee consultant study projects.


    Tasks or expenses added with 2020 Funds



    Old Plank Road Trail Study



    Subarea Redevelopment Plan


    1. | Old Plank Road Trail Study


      Task Status:

      New Pilot Project to coordinate planning for a future bi-state asset shared among multiple LPAs.


      Task Lead:

      Mitch Barloga


      Task Contributors:

      Eman Ibrahim, Joe Exl


      Task Objective:

      The purpose of the study is to evaluate and identify preferred trail alignments, including the land adjacent to the Canadian National rail corridor, and develop a scope of work that can be carried forward for further development. The recommendations will be based on engineering analysis, as well as stakeholder and community input and preferences, and will lay the basic groundwork for a finance strategy, railroad agreements, cost of preliminary engineering, design and engineering, right-of-way acquisition, and phased construction of the trail extension. This project is the Indiana section of a bi-state study on extending the Old Plank Road Trail from its current terminus in Chicago Heights, east through the Villages of Ford Heights, Sauk Village, and Lynwood in Illinois, through the Towns of Dyer and Schererville, to connect to the Pennsy Greenway in Indiana.


      Prior Task Accomplishments:

      • Active Transportation Technical Assistance

      • Marquette Greenway


        Task Description:


        With the support and participation of the two LPAs, NIRPC will procure a consultant to perform the feasibility study for the Indiana section of the Old Plank Road Trail Study concurrently with the Illinois study.


        Task Deliverables:

        • Engineering analysis

        • Stakeholder and community input and preferences

        • Preferred trail alignments,

        • Develop a scope of work that can be carried forward for further development.

        • Basic groundwork for a finance strategy, railroad agreements, cost of preliminary engineering, design and engineering, right-of-way acquisition, and phased construction of the trail extension.


          Public Engagement Goal:

          Collaborate


          Corresponding NWI 2050 Initiative:

          Plan for Complete Streets and Active Transportation


          Corresponding NWI 2050 Strategies:

      • Improve pedestrian and bicycle accessibility to high density population areas, employment and retail centers, transit stations, parks, and schools.

      • Establish a process to link shorter and local trails to the regional trail network through local planning efforts.

      • Prioritize non-motorized facilities that maximize connectivity across counties and municipal boundaries, and Main centers.

      • Collaborate with entities and local landowners on high priority new trail corridors opportunities.

        Corresponding NWI 2050 Performance Measures:

      • Percent of Population within ¼-mile Network Distance to a Trail or Bicycle Facility

      • Percent of Population within ¼-mile Network Distance to a Trail or Bicycle Facility Crossing Municipal/County Jurisdictions


    2. | Local E-Commerce Sub Area Redevelopment Plan


Task Status:

New Pilot Project


Task Lead:

Eman Ibrahim


Task Contributors:

Mitch Barloga, Joe Exl, Peter Kimball, and Scott Weber


Task Objective:

To support an LPA sub-area plan focused on implementing recommendations of the recently completed E-Commerce study.


Prior Task Accomplishments:

  1. | Federal Transit Administration 5307 Funds


    700: Federal Transit Administration 5307 Funds

    Funding Source

    FY 2021

    FY 2022

    FTA 5307 Grants

    $ -

    $ 154,250

    CARES Act 5307

    $ 429,020

    $ 314,914

    Non-Federal

    $ -

    $ 38,562

    TOTAL

    $ 429,020

    $ 507,726


    Tasks:



    Sub-Recipient oversight



    1. | Sub-grantee Oversight


Task Status:

Ongoing and permanent


Task Lead:

Allen Hammond


Task Contributors:

Candi Eklund, Talaya Jones, Lisa Todd, and TIP Assistant


Task Objective:

Carry out administrative responsibilities associated with Federal Transit Administration (FTA) grants, including monitoring and oversight of FTA-assisted transit services and procurement of FTA- funded capital equipment. NIRPC currently conveys Federal Transit Administration (FTA) Section 5307 financial and capital assistance to the following seven (7) sub-grantees: East Chicago Transit, North Township, Opportunity Enterprises, Porter County Community Services, Southlake County Community Services, City of Valparaiso, and City of LaPorte.


Prior Task Accomplishments:

Oversight of, and procurement for, the seven sub-grantees in the region.


Task Description:

Elements and activities:

Oversee requests and manages federal drawdowns using FTA’s Electronic Clearinghouse Operation (ECHO) System. Oversee preparation and processing of payments to vendors and sub-grantees, and maintains grant-related records. Analyze federal and state regulations to identify compliance requirements. Develop and communicate plans, goals, strategies, and recommendations pertaining to external compliance requirements. Serve as a compliance manager for all 5307 sub- grantee functions, excluding financial management. Perform specific duties and responsibilities related to transit vehicle, services, and equipment procurement. Develop and communicate recommendations pertaining to procurement. Identify information needs and refers sub-grantees and other parties to appropriate authorities and sources of information.


Task Deliverables:

Successful oversight and procurement activities according to FTA regulations so that each Triennial Review results in no findings or corrective actions in the areas in which NIRPC is reviewed.


Public Engagement Goal:

Not applicable


Corresponding NWI 2050 Initiative:

Plan for Regional Transit


Corresponding NWI 2050 Strategies:

This planning task allows for the potential implementation of all 2050 Plan Strategies related to Regional Transit.


Corresponding NWI 2050 Performance Measures:

  1. | Surface Transportation Block Grant and Congestion Mitigation and Air Quality


    800: STBG and CMAQ


    Funding Source

    FY 2020

    Amended Funds


    FY 2021


    FY 2022

    800.1: STBG

    $ 3,000

    $ 51,500

    $ 53,045

    800.2: CMAQ

    $ 86,243

    $ 360,000

    $ 360,000

    Non-Federal***

    $ 22,311

    $ 102,875

    $ 103,261

    TOTAL

    $ 111,554

    $ 514,375

    $ 516,306


    Tasks:



    Tasks or expenses carryover from 2020

    E TIP and Grant Program Asst.


    Additional quarter RTIP contract


    Air Quality Public Education


    Complete CY 2020 contracts impacted by COVID19

    *** Non-Federal Match for 2020 CMAQ includes pre-approved in-kind match for Adams Radio Group Contracts.

    1. | E-TIP and TIP Assistant


      Task Status:

      New and permanent


      Task Lead:

      TIP Program Assistant


      Task Contributors:

      Charles Bradsky and Transit Planner


      Task Objective:


      • Replace “Software as a Service” contract for on-line TIP program with staff capable of maintaining the project database without losing process and transparency improvements and supporting improvement of other tasks, functions, and product delivery for the Transportation Investment Planning Group.


        Task Description:


      • Support the development and management of the TIP program of projects, ensuring project data accuracy, fiscal constraint, understandable format, and timely amendment/modification administration.

      • Collaboratively work with municipal and transit partners to review project funding applications, amendments, and modifications.

      • Prepare monthly reports on financial position of the TIP including funds available, programmed, and obligated.

      • Support Quarterly Tracking and Transportation Resources and Oversight Committee meetings and newsletter production.


        Task Deliverables:

      • Local Quarterly Tracking meetings/reports

      • Maintain accurate digital TIP project database in house.

      • Improved delivery of TIP programming and spending plan processes.


      Public Engagement Goal:

      Consult


      Corresponding NWI 2050 Initiative:

      Plan for Continually Improved Investment Prioritization


      Corresponding NWI 2050 Performance Measures:

      The nature of this task impacts all performance measures addressed by projects submitted into the TIP.

    2. | Air Quality Public Education


Task Status:

Ongoing and permanent


Task Lead:

Kathy Luther


Sub-Grantee:

South Shore Clean Cities, 501(c)(3)


Task Objective:

This multi-year air quality public education program continues to target two primary audiences for air quality education. First, media purchases and materials are developed to promote a highly visible, on-going effort to educate the residents of Lake, Porter, and LaPorte counties concerning their personal transportation choices and the relationship of those choices to air quality, health and quality of life in the Region. Second, diesel fleet operators are provided education, outreach, and technical support to reduce emissions through vehicle replacement, upgrade, repowers, retrofits, idle management, maintenance, and driver training. Partner organization South Shore Clean Cities will receive a sub-grant from NIRPC to perform the majority of these tasks. NIRPC will retain procurement and purchasing of promotional materials and event costs for Partners for Clean Air. NIRPC will also complete all tasks described except for the following: NIRPC will continue to procure lunch totes, lanyards, and event sponsorships for NWI Partners for Clean Air, and continue to promote active transportation as an emission friendly alternative to driving through our continuously updated Greenways and Blueways Bike Maps and new phone application. NIRPC will provide oversight of South Shore Clean Cities sub-grant with MPO Planning Administration funds.


The program will continue to work with public officials, public and private diesel fleet owners and operators, private sector decision makers, universities, educators, students, the media and the general public on the air quality issues in the Region. In addition to educating for driving behavior changes, the program will promote environmental stewardship, foster intergenerational leadership and improve air quality and community health by encouraging use of public transit and active transportation. The public education campaign is necessary to obtain public support, consensus, and participation to achieve and maintain national air quality standards as designated in the Clean Air Act.


Prior Task Accomplishments:

900.1 | General management of NIRPC, office + staff


Task Status:

Ongoing and permanent


Task Lead:

Ty Warner


Task Contributors:

NIRPC Commission


The Commission receives funding from each of three counties that make up the region. A portion of these local funds is utilized as matching funds for federal, state, and other funding sources received to perform work related to specific program objectives. This task provides the administrative support required to manage and coordinate all NIRPC planning and activities. The activities include agency-wide office management, personnel activities, clerical support, administrative documents, record keeping, printing, graphics, procurement, and coordination of activities. NIRPC’s Cost Allocation Plan explains the indirect costs associated with this task.


General accounting system:

The Commission is audited annually by the Indiana State Board of Accounts in accordance with Government Auditing Standards and OMB Circular A-133 and budgets on a calendar year basis as is required by the State of Indiana. The Commission’s accounting system has been designed to accommodate mandated requirements established by the State of Indiana, to deal with multiple funded cost objectives, and to satisfy the requirements of various federal funding agencies. The Commission utilizes several methods of reimbursement including cost reimbursement and electronic funds transfers. The Commission strives to maintain a high level of consistency in its accounting procedures.


Cost allocation policies

The costs of goods and services, which are identifiable with specific projects, are charged directly to those projects at the time such costs are incurred. Costs that are not specifically identifiable with a single cost objective are allocated to all projects on a uniform basis, as provided for within the cost allocation plan which is prepared annually.


There are three categories of costs which are allocated. The first is leave costs which includes NIRPC’s cost of providing vacation, sick, personal, holiday, and other leave (jury duty, military, and funeral). The second is fringe benefits which include the employer’s cost of providing various types of insurance, retirement benefits, and social security taxes. The third is other indirect costs, which includes those costs related to general management, finance and accounting, office operation and maintenance, general clerical, and printing functions. It also includes an aggregate amount of depreciation representing the expiration in the service life of fixed assets of the general fund consisting primarily of office machines and furniture which is attributable to and charged as an expense during the reporting period.

Components of the cost allocation plan

Data is collected relative to allocated costs through the accounting system. Allocation rates are determined for the fiscal year and entered into the accounting system which then calculates out allocation costs for each program.


Fringe Benefits

Fringe benefit rate is determined by adding the cost of leave salaries and fringe benefit expense and dividing the total by the number of direct salaries and wages. The cost of leave salaries consists of the following:

Other Significant Regional Planning Activities


The planning activities listed below highlight transportation planning initiatives throughout the region.


Gary Public Transportation Corporation

Short and long-range transit planning activities designed to enhance and expand service delivery of transit for GPTC patrons. Items being explored are Broadway transit expansion, Lakeshore service expansion, regional transit expansion, outreach and marketing, transit- oriented facilities and development, planning for a relief facility, ITS, and civil rights planning.


Northern Indiana Commuter Transportation District


NICTD in conjunction with the Regional Development Authority are carrying forward the ongoing Transit Oriented Development (TOD) work. Initial work was completed oriented strictly around the planned West Lake Extension stations. This planning activity will finance the continuation of that planning work and expand upon the transit associated benefits adding in the existing South Shore Line stations and the benefits from the Double Track NWI project. This activity will fund the study of the potential for residential and commercial development surrounding NICTD's Indiana stations. The products of this study will aid regional and municipal planners in guiding development in on-line cities and towns in ways that will enhance the quality of life and well as encourage use of the commuter rail service. The focus will be within the TDD areas identified through the RDA's work with each community.


The funding for this project is $1,300,000 FTA funds, and $200,000 local match provided by NICTD and the RDA.

Attachment I: Cost Allocation Plan Approval Letters


image

\: "'...,.,,

,,..· 1'\DlA]\r

image

image

t ·

/1 ·

::rJ ., I E-<

INDIANA DEPARTMENT OF TRANSPORTATION


' '

f>FT ·

100 North Senate Avenue Room N955

Indianapolis, Indiana 46204

PHONE: (317) 232-5485

FAX: (317) 232-1499

Eric Holcomb, Governor

Joe McGuinness, Commissioner


February 4, 2020


Ty Warner, Executive Director

N01ihwest Indiana Regional Planning Commission 6100 Southport Road,

Portage, Indiana 46368 Dear Mr. Warner,

INDOT has reviewed the CY 2021 Cost Allocation Plan presented by NIRPC MPO for the period of January 1, 2021 through December 31, 2021.


In accordance 2 CFR 200.331, the Indiana Department of Transportation (INDOT), acting as the pass-through entity for the Federal Highway Administration (FHWA) approved the following indirect and fringe rates which will be monitored with respect to your Unified Planning Work Program Grant. Please include a copy of this letter in your UPWP for future reference. Should the indirect rates change during the CY 2021 grant period, please provide the revised infonnation for re-approval and inclusion of the new rate letter as modification/inclusion in your UPWP Appendix. The approved rates are as follows:


Fringe 88%


Indirect 88%


Please feel free to contact me if you have any questions or concerns regarding these rates.


image

0

Sin

l:=

Emmanuel I. Nsonwu Transpo1iation Planner

Technical Planning & Programming Division Indiana Department of Transportation


CC: J. Newland

R. Nunnally

J. Mitchell File



www.in.gov/dotl

An Equal Opportunity Employer

r.-..n NextLevel

INDIANA

image



100 North Senate Avenue Room N758

Indianapolis, Indiana 46204


PHONE: (317) 232-5485

FAX: (317) 232-1499


Eric Holcomb, Governor

Joe McGuinness, Commissioner


March 4, 2021


Ty Warner, Executive Director

Northwest Indiana Regional Planning Commission 6100 Southport Road,

Portage, Indiana 46368 Dear Mr. Warner,

INDOT has reviewed the CY 2022 Cost Allocation Plan presented by NIRPC MPO for the period of January 1, 2022 through December 31, 2022.


In accordance 2 CFR 200.331, the Indiana Department of Transportation (INDOT), acting as the pass-through entity for the Federal Highway Administration (FHWA) approved the following indirect and fringe rates which will be monitored with respect to your Unified Planning Work Program Grant. Please include a copy of this letter in your UPWP for future reference. Should the indirect rates change during the CY 2022 grant period, please provide the revised information for re-approval and inclusion of the new rate letter as modification/inclusion in your UPWP Appendix. The approved rates are as follows:


Fringe 66%


Indirect 77%


Please feel free to contact me if you have any questions or concerns regarding these rates.


image

Sincerely,

image

Emmanuel I. Nsonwu Transportation Planner

Technical Planning & Programming Division Indiana Department of Transportation


CC: R. Dirks

R. Nunnally

J. Mitchell File



image

www.in.gov/dot/

An Equal Opportunity Employer

image

Attachment II: CMAQ Eligibility Finding

image


U.S. Department of Transportation

Federal Transit Administration Federal Highway Administration

Region V · Indiana Division

200 West Adams St., Suite 320 575 N. Pennsylvania St., Rm 254

Chicago, IL 60606-5253 Indianapolis, IN 46204-1576


January 17, 2019


Mr. Michael Cales, INDOT CMAQ Coordinator LPA & Grant Administration

Indiana Department of Transportation 100 North Senate Avenue, Room N955 Indianapolis, Indiana 46204


Dear Mr. Cales:


The Federal Highway Administration (FHWA) and Federal Transit Administration (FTA) received and reviewed the application listed below from the Northwestern Indiana Regional Planning Commission (NIRPC) for Congestion Mitigation and Air Quality (CMAQ) funding. The application was submitted pursuant to the established CMAQ project selection process and the winter call for projects.


MPO

SPONSOR

PROJECT

CATEGORY

CMAQ FUNDS

YEAR


NIRPC


NIRPC

Air Quality Public Education and Green

Fleets

Public Education & Outreach


$360,000.00


2020


FTA is currently on furlough as part of the partial government shutdown. They received the application for this call for projects and have historically supported NIRPC's public outreach activity. Therefore, FHWA is unilaterally determining CMAQ eligibility for this non-transit project.


The project will need to be amended into the MPO Transportation Improvement Program and Indiana Statewide Transportation Improvement Program prior to seeking authorization of the associated funds.


Should you have any questions regarding this eligibility finding, please contact Joyce Newland ofFHWA at (317) 226-5353.


Sincerely,

gl :f t r

\ Indiana Division


ecc: Robert Dirks, FHWA Kris Greene, FTA V Tony Maietta, US EPA 5 Sean Seals, IDEM

Ty Warner, NIRCC

Kathy Eaton-McKalip, INDOT Stephani Vermillion, INDOT Jay Mitchell, INDOT

Marcia Blansett, INDOT Larry Buckel, INDOT



Page 2 of 2