2200533 (Ver 1) 22-08 STATUS New Project FEDERAL |
Title: District Bridge Project (Rehabilitation) Route: N/A Description: Bridge Deck Overlay, I 65 I-65 SB over 15th Avenue, 1.53 mi N of I80 Project Type: Bridge Deck Overlay AQ Exempt: Exempt District: LaPorte County: Lake Limits: Narrative: Amend FY23 PE $300,000, FY24 UT CN $5,000, FY25 RR CN $5,000 and FY27 CN $1,556,467. |
Region: Northwestern MPO Lead Agency: INDOT |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2023 | NHPP Interstate | $300,000 | $0 | $0 | $0 | $300,000 |
2024 | NHPP Interstate | $0 | $0 | $5,000 | $0 | $5,000 |
2025 | NHPP Interstate | $0 | $0 | $5,000 | $0 | $5,000 |
>2026 | Beyond | $0 | $0 | $1,556,467 | $0 | $1,556,467 |
2022-2026 TOTAL | $300,000 | $0 | $10,000 | $0 | $310,000 | |
ALL YEARS TOTAL | $300,000 | $0 | $1,566,467 | $0 | $1,866,467 |
2200534 (Ver 1) 22-08 STATUS New Project FEDERAL |
Title: District Bridge Project (Rehabilitation) Route: N/A Description: Bridge Deck Overlay, I 65 I-65 NB over 15th Ave, 01.53 N I-80 Project Type: Bridge Deck Overlay AQ Exempt: Exempt District: LaPorte County: Lake Limits: Narrative: Amend FY23 PE $300,000, FY24 UT CN $5,000, FY25 RR CN $5,000 and FY27 CN $1,082,750. |
Region: Northwestern MPO Lead Agency: INDOT |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2023 | NHPP Interstate | $300,000 | $0 | $0 | $0 | $300,000 |
2024 | NHPP Interstate | $0 | $0 | $5,000 | $0 | $5,000 |
2025 | NHPP Interstate | $0 | $0 | $5,000 | $0 | $5,000 |
>2026 | Beyond | $0 | $0 | $1,082,750 | $0 | $1,082,750 |
2022-2026 TOTAL | $300,000 | $0 | $10,000 | $0 | $310,000 | |
ALL YEARS TOTAL | $300,000 | $0 | $1,092,750 | $0 | $1,392,750 |
2200549 (Ver 1) 22-08 STATUS New Project FEDERAL |
Title: District Bridge Project (Rehabilitation) Route: N/A Description: Bridge Deck Overlay, US 6 over Coffee Creek, 2.1 miles East of SR 49 Project Type: Bridge Deck Overlay AQ Exempt: Exempt District: LaPorte County: Porter Limits: Narrative: Amend FY23 PE $50,000, FY24 UT CN $20,000, FY24 RW $15,000, FY25 RR CN $5,000 and FY27 CN $808,951. |
Region: Northwestern MPO Lead Agency: INDOT |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2023 | NHPP Non Interstate | $50,000 | $0 | $0 | $0 | $50,000 |
2024 | NHPP Non Interstate | $0 | $15,000 | $20,000 | $0 | $35,000 |
2025 | NHPP Non Interstate | $0 | $0 | $5,000 | $0 | $5,000 |
>2026 | Beyond | $0 | $0 | $808,951 | $0 | $808,951 |
2022-2026 TOTAL | $50,000 | $15,000 | $25,000 | $0 | $90,000 | |
ALL YEARS TOTAL | $50,000 | $15,000 | $833,951 | $0 | $898,951 |
2200537 (Ver 1) 22-08 STATUS New Project FEDERAL |
Title: District Bridge Project (Rehabilitation) Route: N/A Description: Bridge Painting, I-80 Ramp 3L over I80 Ramp 3F, Kennedy Ave, 0.97mi E of US 41 Project Type: Bridge Painting AQ Exempt: Exempt District: LaPorte County: Lake Limits: Narrative: Amend FY23 PE $120,000, FY24 UT CN $5,000, FY25 RR CN $5,000 and FY27 CN $681,103. |
Region: Northwestern MPO Lead Agency: INDOT |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2023 | NHPP Interstate | $120,000 | $0 | $0 | $0 | $120,000 |
2024 | NHPP Interstate | $0 | $0 | $5,000 | $0 | $5,000 |
2025 | NHPP Interstate | $0 | $0 | $5,000 | $0 | $5,000 |
>2026 | Beyond | $0 | $0 | $681,103 | $0 | $681,103 |
2022-2026 TOTAL | $120,000 | $0 | $10,000 | $0 | $130,000 | |
ALL YEARS TOTAL | $120,000 | $0 | $691,103 | $0 | $811,103 |
2200712 (Ver 1) 22-08 STATUS New Project FEDERAL |
Title: District Bridge Project (Rehabilitation) Route: N/A Description: Bridge Painting, SR 912 over 25TH AVE/177TH ST, 00.18 W I-80 Project Type: Bridge Painting AQ Exempt: Exempt District: LaPorte County: Lake Limits: Narrative: Amend FY23 PE $82,000, FY24 UT CN $20,000 and FY27 CN $463,874. |
Region: Northwestern MPO Lead Agency: INDOT |
2200737 (Ver 1) 22-08 STATUS New Project FEDERAL |
Title: District Bridge Project (Rehabilitation) Route: N/A Description: Bridge Painting, I 94 I-94 EB/WB under CR W800N, 02.05 E US 20 Project Type: Bridge Painting AQ Exempt: Exempt District: LaPorte County: Laporte Limits: Narrative: Amend FY23 PE $92,000, FY24 UT CN $10,000 and FY27 CN $520,444. |
Region: Northwestern MPO Lead Agency: INDOT |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2023 | NHPP Non Interstate | $82,000 | $0 | $0 | $0 | $82,000 |
2024 | NHPP Non Interstate | $0 | $0 | $20,000 | $0 | $20,000 |
>2026 | Beyond | $0 | $0 | $463,874 | $0 | $463,874 |
2022-2026 TOTAL | $82,000 | $0 | $20,000 | $0 | $102,000 | |
ALL YEARS TOTAL | $82,000 | $0 | $483,874 | $0 | $565,874 |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2023 | NHPP Interstate | $92,000 | $0 | $0 | $0 | $92,000 |
2024 | NHPP Interstate | $0 | $0 | $10,000 | $0 | $10,000 |
>2026 | Beyond | $0 | $0 | $520,444 | $0 | $520,444 |
2022-2026 TOTAL | $92,000 | $0 | $10,000 | $0 | $102,000 | |
ALL YEARS TOTAL | $92,000 | $0 | $530,444 | $0 | $622,444 |
2200738 (Ver 1) 22-08 STATUS New Project FEDERAL |
Title: District Bridge Project (Rehabilitation) Route: N/A Description: Bridge Painting, I 94 I-94 EB/WB under Waverly Rd, 01.12 W SR 49 Project Type: Bridge Painting AQ Exempt: Exempt District: LaPorte County: Porter Limits: Narrative: Amend FY23 PE $92,000, FY24 UT CN $10,000 and FY27 CN $520,444. |
Region: Northwestern MPO Lead Agency: INDOT |
2200739 (Ver 1) 22-08 STATUS New Project FEDERAL |
Title: District Bridge Project (Rehabilitation) Route: N/A Description: Bridge Painting, I 94 I-94 WB over Jensen Dr., 00.53 E SR 249 Project Type: Bridge Painting AQ Exempt: Exempt District: LaPorte County: Porter Limits: Narrative: Amend FY23 PE $80,000, FY24 UT CN $10,000 and FY27 CN $452,560 |
Region: Northwestern MPO Lead Agency: INDOT |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2023 | NHPP Interstate | $92,000 | $0 | $0 | $0 | $92,000 |
2024 | NHPP Interstate | $0 | $0 | $10,000 | $0 | $10,000 |
>2026 | Beyond | $0 | $0 | $520,444 | $0 | $520,444 |
2022-2026 TOTAL | $92,000 | $0 | $10,000 | $0 | $102,000 | |
ALL YEARS TOTAL | $92,000 | $0 | $530,444 | $0 | $622,444 |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2023 | NHPP Interstate | $80,000 | $0 | $0 | $0 | $80,000 |
2024 | NHPP Interstate | $0 | $0 | $10,000 | $0 | $10,000 |
>2026 | Beyond | $0 | $0 | $452,560 | $0 | $452,560 |
2022-2026 TOTAL | $80,000 | $0 | $10,000 | $0 | $90,000 | |
ALL YEARS TOTAL | $80,000 | $0 | $462,560 | $0 | $542,560 |
2200740 (Ver 1) 22-08 STATUS New Project FEDERAL |
Title: District Bridge Project (Rehabilitation) Route: N/A Description: Bridge Painting, I 94 I-94 EB over Jensen Dr., 00.53 E SR 249 Project Type: Bridge Painting AQ Exempt: Exempt District: LaPorte County: Porter Limits: Narrative: Amend FY23 PE $80,000 and FY27 CN $452,560. |
Region: Northwestern MPO Lead Agency: INDOT |
2200750 (Ver 1) 22-08 STATUS New Project FEDERAL |
Title: Bridge Thin Deck Overlay Route: N/A Description: Bridge Thin Deck Overlay, I 94 I-94 WB over I80/90 (Toll Rd), 0.46 E I80 Project Type: Bridge Thin Deck Overlay AQ Exempt: Exempt District: LaPorte County: Lake Limits: Narrative: Amend FY23 PE $108,000 and FY27 CN $610,956. |
Region: Northwestern MPO Lead Agency: INDOT |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2023 | NHPP Interstate | $80,000 | $0 | $0 | $0 | $80,000 |
>2026 | Beyond | $0 | $0 | $452,560 | $0 | $452,560 |
2022-2026 TOTAL | $80,000 | $0 | $0 | $0 | $80,000 | |
ALL YEARS TOTAL | $80,000 | $0 | $452,560 | $0 | $532,560 |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2023 | NHPP Interstate | $108,000 | $0 | $0 | $0 | $108,000 |
>2026 | Beyond | $0 | $0 | $610,956 | $0 | $610,956 |
2022-2026 TOTAL | $108,000 | $0 | $0 | $0 | $108,000 | |
ALL YEARS TOTAL | $108,000 | $0 | $610,956 | $0 | $718,956 |
2200751 (Ver 1) 22-08 STATUS New Project FEDERAL |
Title: Bridge Thin Deck Overlay Route: N/A Description: Bridge Thin Deck Overlay, I 94 I-94 EB over I80/I90 (Toll Road), 0.46mi E I-80 Project Type: Bridge Thin Deck Overlay AQ Exempt: Exempt District: LaPorte County: Lake Limits: Narrative: Amend FY23 PE $108,000 and FY27 CN $610,956. |
Region: Northwestern MPO Lead Agency: INDOT |
2200966 (Ver 1) 22-08 STATUS New Project FEDERAL |
Title: District Pavement Project (Non-I) Route: N/A Description: Concrete Pavement Preservation (CPP), US 12 from 0.38 mi. E. of I-65 to US 12/20 Split (Melton Rd.) Project Type: Concrete Pavement Preservation (CPP) AQ Exempt: Exempt District: LaPorte County: Lake Limits: Narrative: Amend FY23 PE $1,200,000, FY24 UT CN $10,000, FY25 RR CN $50,000, FY27 CN $7,001,582 and FY27 CE $172,000. |
Region: Northwestern MPO Lead Agency: INDOT |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2023 | NHPP Interstate | $108,800 | $0 | $0 | $0 | $108,800 |
>2026 | Beyond | $0 | $0 | $610,956 | $0 | $610,956 |
2022-2026 TOTAL | $108,800 | $0 | $0 | $0 | $108,800 | |
ALL YEARS TOTAL | $108,800 | $0 | $610,956 | $0 | $719,756 |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2023 | NHPP Non Interstate | $1,200,000 | $0 | $0 | $0 | $1,200,000 |
2024 | NHPP Non Interstate | $0 | $0 | $10,000 | $0 | $10,000 |
2025 | NHPP Non Interstate | $0 | $0 | $50,000 | $0 | $50,000 |
>2026 | Beyond | $0 | $0 | $7,001,582 | $172,000 | $7,173,582 |
2022-2026 TOTAL | $1,200,000 | $0 | $60,000 | $0 | $1,260,000 | |
ALL YEARS TOTAL | $1,200,000 | $0 | $7,061,582 | $172,000 | $8,433,582 |
2200825 (Ver 1) 22-08 STATUS New Project FEDERAL |
Title: District Pavement Project (Non-I) Route: N/A Description: Concrete Pavement Restoration (CPR), SR 2 from 0.8 mi. W. of I-65 (Mississippi St.) to 0.9 mi E of I-65 Project Type: Concrete Pavement Restoration (CPR) AQ Exempt: Exempt District: LaPorte County: Lake Limits: Narrative: Amend FY23 PE $765,000, FY24 UT CN $5,000, FY25 RR CN $5,000, FY27 CN $5,794,274 and FY27 CE $50,000. |
Region: Northwestern MPO Lead Agency: INDOT |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2023 | NHPP Non Interstate | $765,000 | $0 | $0 | $0 | $765,000 |
2024 | NHPP Non Interstate | $0 | $0 | $5,000 | $0 | $5,000 |
2025 | NHPP Non Interstate | $0 | $0 | $5,000 | $0 | $5,000 |
>2026 | Beyond | $0 | $0 | $5,794,274 | $50,000 | $5,844,274 |
2022-2026 TOTAL | $765,000 | $0 | $10,000 | $0 | $775,000 | |
ALL YEARS TOTAL | $765,000 | $0 | $5,804,274 | $50,000 | $6,619,274 |
2200486 (Ver 1) 22-08 STATUS New Project FEDERAL |
Title: District Pavement Project (Non-I) Route: N/A Description: HMA Overlay, Preventive Maintenance, SR 39 from US 6 to S. Jct of SR 2 Project Type: HMA Overlay, Preventive Maintenance AQ Exempt: Exempt District: LaPorte County: Laporte Limits: Narrative: Amend FY23 PE $450,000, FY24 RW $20,000, FY24 UT CN $20,000 and FY27 CN $2,531,199. |
Region: Northwestern MPO Lead Agency: INDOT |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2023 | NHPP Non Interstate | $450,000 | $0 | $0 | $0 | $450,000 |
2024 | NHPP Non Interstate | $0 | $20,000 | $20,000 | $0 | $40,000 |
2025 | NHPP Non Interstate | $0 | $0 | $20,000 | $0 | $20,000 |
>2026 | Beyond | $0 | $0 | $2,531,199 | $0 | $2,531,199 |
2022-2026 TOTAL | $450,000 | $20,000 | $40,000 | $0 | $510,000 | |
ALL YEARS TOTAL | $450,000 | $20,000 | $2,571,199 | $0 | $3,041,199 |
2200827 (Ver 1) 22-08 STATUS New Project FEDERAL |
Title: District Pavement Project (Non-I) Route: N/A Description: HMA Overlay, Preventive Maintenance, SR 8 from 0.25 mi E. of US 231 to 0.74 mi. W. of SR 49 Project Type: HMA Overlay, Preventive Maintenance AQ Exempt: Exempt District: LaPorte County: Porter Limits: Narrative: Amend FY23 PR $650,000, FY24 UT CN $21,000, FY25 RR CN $5,000 and FY27 CN $4,955,822. |
Region: Northwestern MPO Lead Agency: INDOT |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2023 | NHPP Non Interstate | $650,000 | $0 | $0 | $0 | $650,000 |
2024 | NHPP Non Interstate | $0 | $0 | $21,000 | $0 | $21,000 |
2025 | NHPP Non Interstate | $0 | $0 | $5,000 | $0 | $5,000 |
>2026 | Beyond | $0 | $0 | $4,955,822 | $0 | $4,955,822 |
2022-2026 TOTAL | $650,000 | $0 | $26,000 | $0 | $676,000 | |
ALL YEARS TOTAL | $650,000 | $0 | $4,981,822 | $0 | $5,631,822 |
2200828 (Ver 1) 22-08 STATUS New Project FEDERAL |
Title: District Pavement Project (Non-I) Route: N/A Description: HMA Overlay, Preventive Maintenance, SR 152 from I-80/94 to US 20 (Michigan Ave./Carroll St.) Project Type: HMA Overlay, Preventive Maintenance AQ Exempt: Exempt District: LaPorte County: Lake Limits: Narrative: Amend FY23 PE $650,000, FY24 UT CN $12,000 and FY27 CN $5,159,675. |
Region: Northwestern MPO Lead Agency: INDOT |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2023 | NHPP Non Interstate | $650,000 | $0 | $0 | $0 | $650,000 |
2024 | NHPP Non Interstate | $0 | $0 | $12,000 | $0 | $12,000 |
>2026 | Beyond | $0 | $0 | $5,159,675 | $0 | $5,159,675 |
2022-2026 TOTAL | $650,000 | $0 | $12,000 | $0 | $662,000 | |
ALL YEARS TOTAL | $650,000 | $0 | $5,171,675 | $0 | $5,821,675 |
2200965 (Ver 1) 22-08 STATUS New Project FEDERAL |
Title: District Pavement Project (Non-I) Route: N/A Description: HMA Overlay, Preventive Maintenance, US 12 from IL State Line to US 41 Project Type: HMA Overlay, Preventive Maintenance AQ Exempt: Exempt District: LaPorte County: Lake Limits: Narrative: Amend FY23 PE $300,000, FY24 UT CN $20,000, FY24 RW $50,000, FY25 RR CN $20,000 and FY27 CN $1,833,862. |
Region: Northwestern MPO Lead Agency: INDOT |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2023 | NHPP Non Interstate | $300,000 | $0 | $0 | $0 | $300,000 |
2024 | NHPP Non Interstate | $0 | $50,000 | $20,000 | $0 | $70,000 |
2025 | NHPP Non Interstate | $0 | $0 | $20,000 | $0 | $20,000 |
>2026 | Beyond | $0 | $0 | $1,833,862 | $0 | $1,833,862 |
2022-2026 TOTAL | $300,000 | $50,000 | $40,000 | $0 | $390,000 | |
ALL YEARS TOTAL | $300,000 | $50,000 | $1,873,862 | $0 | $2,223,862 |
2200967 (Ver 1) 22-08 STATUS New Project FEDERAL |
Title: District Pavement Project (Non-I) Route: N/A Description: HMA Overlay, Preventive Maintenance, US 35 from US 30 to S. Jct of US 6 Project Type: HMA Overlay, Preventive Maintenance AQ Exempt: Exempt District: LaPorte County: Laporte Limits: Narrative: Amend FY23 PE $1,224,000, FY24 UT CN $5,000, FY25 RR CN $5,000 and FY27 CN $6,890,710. |
Region: Northwestern MPO Lead Agency: INDOT |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2023 | NHPP Non Interstate | $1,224,000 | $0 | $0 | $0 | $1,224,000 |
2024 | NHPP Non Interstate | $0 | $0 | $5,000 | $0 | $5,000 |
2025 | NHPP Non Interstate | $0 | $0 | $5,000 | $0 | $5,000 |
>2026 | Beyond | $0 | $0 | $6,890,710 | $0 | $6,890,710 |
2022-2026 TOTAL | $1,224,000 | $0 | $10,000 | $0 | $1,234,000 | |
ALL YEARS TOTAL | $1,224,000 | $0 | $6,900,710 | $0 | $8,124,710 |
2200969 (Ver 1) 22-08 STATUS New Project FEDERAL |
Title: District Pavement Project (Non-I) Route: N/A Description: HMA Overlay, Preventive Maintenance, SR 312 from 0.95 mi. E. of US 41 (White Oak Ave.) to SR 912 (Cline Ave) Project Type: HMA Overlay, Preventive Maintenance AQ Exempt: Exempt District: LaPorte County: Lake Limits: Narrative: Amend FY23 PE $500,000, FY24 UT CN $20,000, FY24 RW $20,000, FY25 RR CN $50,000 and FY27 CN $3,347,080. |
Region: Northwestern MPO Lead Agency: INDOT |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2023 | NHPP Non Interstate | $500,000 | $0 | $0 | $0 | $500,000 |
2024 | NHPP Non Interstate | $0 | $20,000 | $20,000 | $0 | $40,000 |
2025 | NHPP Non Interstate | $0 | $0 | $50,000 | $0 | $50,000 |
>2026 | Beyond | $0 | $0 | $3,347,080 | $0 | $3,347,080 |
2022-2026 TOTAL | $500,000 | $20,000 | $70,000 | $0 | $590,000 | |
ALL YEARS TOTAL | $500,000 | $20,000 | $3,417,080 | $0 | $3,937,080 |
2200926 (Ver 1) 22-08 STATUS New Project FEDERAL |
Title: District Pavement Project (Non-I) Route: N/A Description: HMA Overlay Minor Structural, SR 2 From the East Junction of US 421 to the West Junction of SR 39 Project Type: HMA Overlay Minor Structural AQ Exempt: Exempt District: LaPorte County: Laporte Limits: Narrative: Amend FY23 PE $1,500,000, FY24 UT CN $15,000, FY24 RW $50,000, FY25 RR CN $5,000, FY27CN $8,607,985 and FY27 |
Region: Northwestern MPO Lead Agency: INDOT |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2023 | NHPP Non Interstate | $1,500,000 | $0 | $0 | $0 | $1,500,000 |
2024 | NHPP Non Interstate | $0 | $50,000 | $15,000 | $0 | $65,000 |
2025 | NHPP Non Interstate | $0 | $0 | $5,000 | $0 | $5,000 |
>2026 | Beyond | $0 | $0 | $8,607,985 | $65,000 | $8,672,985 |
2022-2026 TOTAL | $1,500,000 | $50,000 | $20,000 | $0 | $1,570,000 | |
ALL YEARS TOTAL | $1,500,000 | $50,000 | $8,627,985 | $65,000 | $10,242,985 |
2200821 (Ver 1) 22-08 STATUS New Project FEDERAL |
Title: District Pavement Project (Interstate) Route: N/A Description: HMA Overlay Minor Structural, I-80/90 Interchange (Toll Road) to 0.52 mi. E. of SR 249 (Jensen Dr.) Project Type: HMA Overlay Minor Structural AQ Exempt: Exempt District: LaPorte County: Lake, Porter Limits: Narrative: Amend FY23 PE $2,621,520, FY24 UT CN $5,000, FY25 RR CN $5,000 and FY27 CN $14,708,990. |
Region: Northwestern MPO Lead Agency: INDOT |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2023 | NHPP Interstate | $2,621,520 | $0 | $0 | $0 | $2,621,520 |
2024 | NHPP Interstate | $0 | $0 | $5,000 | $0 | $5,000 |
2025 | NHPP Interstate | $0 | $0 | $5,000 | $0 | $5,000 |
>2026 | Beyond | $0 | $0 | $14,708,990 | $0 | $14,708,990 |
2022-2026 TOTAL | $2,621,520 | $0 | $10,000 | $0 | $2,631,520 | |
ALL YEARS TOTAL | $2,621,520 | $0 | $14,718,990 | $0 | $17,340,510 |
2200829 (Ver 1) 22-08 STATUS New Project FEDERAL |
Title: District Pavement Project (Non-I) Route: N/A Description: HMA Overlay Minor Structural, SR 53 from US 30 to 1.04 mi. N. of US 30 (73rd Ave.) Project Type: HMA Overlay Minor Structural AQ Exempt: Exempt District: LaPorte County: Lake Limits: Narrative: Amend FY23 PE $430,420, FY24 UT CN $5,000, FY24 RW $50,000, FY25 RR CN $5,000 and FY27 CN $2,424,897. |
Region: Northwestern MPO Lead Agency: INDOT |
2200991 (Ver 1) 22-08 STATUS New Project FEDERAL |
Title: Interchange Modification on US 6 & I-80/94 Route: N/A Description: Interchange Modification, US 6 @ I-80/94 EB/WB, 2.27mi N of SR 51. The interchange will go from a full cloverleaf to a partial cloverleaf, with off ramps coming to signalized intersections on US 6 (Ripley St). On ramps to I-80/94 will remain cloverleafs. Project Type: Interchange Modification AQ Exempt: Exempt District: LaPorte County: Lake Limits: Narrative: Amend FY24 CN $5,160,000 Clarified description of scope. |
Region: Northwestern MPO Lead Agency: INDOT |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2023 | NHPP Non Interstate | $430,420 | $0 | $0 | $0 | $430,420 |
2024 | NHPP Non Interstate | $0 | $50,000 | $5,000 | $0 | $55,000 |
2025 | NHPP Non Interstate | $0 | $0 | $5,000 | $0 | $5,000 |
>2026 | Beyond | $0 | $0 | $2,424,897 | $0 | $2,424,897 |
2022-2026 TOTAL | $430,420 | $50,000 | $10,000 | $0 | $490,420 | |
ALL YEARS TOTAL | $430,420 | $50,000 | $2,434,897 | $0 | $2,915,317 |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2024 | NHPP Non Interstate | $0 | $0 | $5,160,000 | $0 | $5,160,000 |
2022-2026 TOTAL | $0 | $0 | $5,160,000 | $0 | $5,160,000 | |
ALL YEARS TOTAL | $0 | $0 | $5,160,000 | $0 | $5,160,000 |
2200043 (Ver 1) 22-08 STATUS New Project FEDERAL |
Title: District Pavement Project (Non-I) Route: N/A Description: Intersection Improvement, SR 2 at CR 500W, 3.27mi West of SR 39. Project Type: Intersection Improvement AQ Exempt: Exempt District: LaPorte County: Laporte Limits: Narrative: Amend FY23 PE $300,000, FY24 UT CN $10,000, FY24 RW $110,000, FY27 CN $1,386,429 and FY27 CE $150,000. |
Region: Northwestern MPO Lead Agency: INDOT |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2023 | NHPP Non Interstate | $300,000 | $0 | $0 | $0 | $300,000 |
2024 | NHPP Non Interstate | $0 | $110,000 | $10,000 | $0 | $120,000 |
>2026 | Beyond | $0 | $0 | $1,386,429 | $150,000 | $1,536,429 |
2022-2026 TOTAL | $300,000 | $110,000 | $10,000 | $0 | $420,000 | |
ALL YEARS TOTAL | $300,000 | $110,000 | $1,396,429 | $150,000 | $1,956,429 |
2200046 (Ver 1) 22-08 STATUS New Project FEDERAL |
Title: District Intersection Improvement Project Route: N/A Description: Intersection Improvement, US 35 at Johnson/Severs Road 0.62 Mile North of SR 39 (N. Jct) Project Type: Intersection Improvement AQ Exempt: Exempt District: LaPorte County: Laporte Limits: Narrative: Amend FY23 PE $380,000, FY24 RW $530,000, FY25 UT CN $120,000, FY27CN $3,810,000 and FY27 CE $230,000. |
Region: Northwestern MPO Lead Agency: INDOT |
2201077 (Ver 1) 22-08 STATUS New Project FEDERAL |
Title: LaPorte District Safety Systemic - New or Slotted Left Turn (No ROW) Route: N/A Description: LaPorte District Safety Systemic - New or Slotted Left Turn (No ROW) Project Type: Other Type Project (Miscellaneous) AQ Exempt: Exempt District: LaPorte County: Various Limits: Narrative: Amend FY23 PE $350,000 and FY27 CN $1,990,000. |
Region: Northwestern MPO Lead Agency: INDOT |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2023 | NHPP Non Interstate | $380,000 | $0 | $0 | $0 | $380,000 |
2024 | NHPP Non Interstate | $0 | $530,000 | $0 | $0 | $530,000 |
2025 | NHPP Non Interstate | $0 | $0 | $120,000 | $0 | $120,000 |
>2026 | Beyond | $0 | $0 | $3,810,000 | $230,000 | $4,040,000 |
2022-2026 TOTAL | $380,000 | $530,000 | $120,000 | $0 | $1,030,000 | |
ALL YEARS TOTAL | $380,000 | $530,000 | $3,930,000 | $230,000 | $5,070,000 |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2023 | NHPP Non Interstate | $350,000 | $0 | $0 | $0 | $350,000 |
>2026 | Beyond | $0 | $0 | $1,990,000 | $0 | $1,990,000 |
2022-2026 TOTAL | $350,000 | $0 | $0 | $0 | $350,000 | |
ALL YEARS TOTAL | $350,000 | $0 | $1,990,000 | $0 | $2,340,000 |
2200613 (Ver 1) 22-08 STATUS New Project FEDERAL |
Title: District Small Structure Project Route: N/A Description: Small Structure Pipe Lining, SR 149, 0.41 N JCT SR 130 Project Type: Small Structure Pipe Lining AQ Exempt: Exempt District: LaPorte County: Porter Limits: Narrative: Amend FY23 PE $49,000, FY24 RW $20,000 and FY27 CN $274,591. |
Region: Northwestern MPO Lead Agency: INDOT |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2023 | NHPP Non Interstate | $49,000 | $0 | $0 | $0 | $49,000 |
2024 | NHPP Non Interstate | $0 | $20,000 | $0 | $0 | $20,000 |
>2026 | Beyond | $0 | $0 | $274,591 | $0 | $274,591 |
2022-2026 TOTAL | $49,000 | $20,000 | $0 | $0 | $69,000 | |
ALL YEARS TOTAL | $49,000 | $20,000 | $274,591 | $0 | $343,591 |
2200621 (Ver 1) 22-08 STATUS New Project FEDERAL |
Title: District Small Structure Project Route: N/A Description: Small Structure Pipe Lining, SR 149, 0.98 S JCT US 20 Project Type: Small Structure Pipe Lining AQ Exempt: Exempt District: LaPorte County: Porter Limits: Narrative: Amend FY23 PE $40,000, FY24 RW $20,000, FY24 UT CN $5,000, FY25 RR CN $5,000 and FY27 CN $222,716. |
Region: Northwestern MPO Lead Agency: INDOT |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2023 | NHPP Non Interstate | $40,000 | $0 | $0 | $0 | $40,000 |
2024 | NHPP Non Interstate | $0 | $20,000 | $5,000 | $0 | $25,000 |
2025 | NHPP Non Interstate | $0 | $0 | $5,000 | $0 | $5,000 |
>2026 | Beyond | $0 | $0 | $222,716 | $0 | $222,716 |
2022-2026 TOTAL | $40,000 | $20,000 | $10,000 | $0 | $70,000 | |
ALL YEARS TOTAL | $40,000 | $20,000 | $232,716 | $0 | $292,716 |
2200622 (Ver 1) 22-08 STATUS New Project FEDERAL |
Title: District Small Structure Project Route: N/A Description: Small Structure Pipe Lining, SR 39 at Kingsbury Creek, 2.33 N JCT US 6 Project Type: Small Structure Pipe Lining AQ Exempt: Exempt District: LaPorte County: Laporte Limits: Narrative: Amend FY23 PE $35,000, FY24 RW $10,000 and FY27 CN $194,601. |
Region: Northwestern MPO Lead Agency: INDOT |
2200625 (Ver 1) 22-08 STATUS New Project FEDERAL |
Title: District Small Structure Project Route: N/A Description: Small Structure Pipe Lining, I-80 Ramp 2B over UNT, 0.03 E JCT SR 152 Project Type: Small Structure Pipe Lining AQ Exempt: Exempt District: LaPorte County: Lake Limits: Narrative: Amend FY23 PE $75,000, FY24 UT CN $10,000 and FY27 CN $124,454. |
Region: Northwestern MPO Lead Agency: INDOT |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2023 | NHPP Non Interstate | $35,000 | $0 | $0 | $0 | $35,000 |
2024 | NHPP Non Interstate | $0 | $10,000 | $0 | $0 | $10,000 |
>2026 | Beyond | $0 | $0 | $194,601 | $0 | $194,601 |
2022-2026 TOTAL | $35,000 | $10,000 | $0 | $0 | $45,000 | |
ALL YEARS TOTAL | $35,000 | $10,000 | $194,601 | $0 | $239,601 |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2023 | NHPP Interstate | $75,000 | $0 | $0 | $0 | $75,000 |
2024 | NHPP Interstate | $0 | $0 | $10,000 | $0 | $10,000 |
>2026 | Beyond | $0 | $0 | $124,454 | $0 | $124,454 |
2022-2026 TOTAL | $75,000 | $0 | $10,000 | $0 | $85,000 | |
ALL YEARS TOTAL | $75,000 | $0 | $134,454 | $0 | $209,454 |
2200623 (Ver 1) 22-08 STATUS New Project FEDERAL |
Title: District Small Structure Project Route: N/A Description: Small Structure Replacement, SR 8 over Phillips Ditch, 5.65 mi E US 231 Project Type: Small Structure Replacement AQ Exempt: Exempt District: LaPorte County: Porter Limits: Narrative: Amend FY23 PE $115,000, FY24 RW $30,000, FY25 UT CN $20,000 and FY27 CN $650,555. |
Region: Northwestern MPO Lead Agency: INDOT |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2023 | NHPP Non Interstate | $115,000 | $0 | $0 | $0 | $115,000 |
2024 | NHPP Non Interstate | $0 | $30,000 | $0 | $0 | $30,000 |
2025 | NHPP Non Interstate | $0 | $0 | $20,000 | $0 | $20,000 |
>2026 | Beyond | $0 | $0 | $650,555 | $0 | $650,555 |
2022-2026 TOTAL | $115,000 | $30,000 | $20,000 | $0 | $165,000 | |
ALL YEARS TOTAL | $115,000 | $30,000 | $670,555 | $0 | $815,555 |
2200506 (Ver 1) 22-08 STATUS New Project FEDERAL |
Title: District Small Structure Project Route: N/A Description: Small Structures & Drains Construction Project Type: Small Structures & Drains Construction AQ Exempt: Exempt District: LaPorte County: Laporte Limits: Narrative: Amend FY23 PE $78,000, FY24 RW $50,000, FY24 UT CN $5,000, FY25 RR CN $5,000 and FY27 CN $439,195. |
Region: Northwestern MPO Lead Agency: INDOT |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2023 | NHPP Non Interstate | $78,000 | $0 | $0 | $0 | $78,000 |
2024 | NHPP Non Interstate | $0 | $50,000 | $5,000 | $0 | $55,000 |
2025 | NHPP Non Interstate | $0 | $0 | $5,000 | $0 | $5,000 |
>2026 | Beyond | $0 | $0 | $439,195 | $0 | $439,195 |
2022-2026 TOTAL | $78,000 | $50,000 | $10,000 | $0 | $138,000 | |
ALL YEARS TOTAL | $78,000 | $50,000 | $449,195 | $0 | $577,195 |
NIRPC27006 (Ver 1) 22-08 STATUS New Project FEDERAL |
Title: City of La Porte Comprehensive and Transportation Plan Route: N/A Description: This request is to develop a comprehensive and transportation plan for the city of La Porte. The plan will focus on several important transportation, land use, housing, economic development, environmental/resiliency, quality of life, and placemaking objectives for the city. The plan will also seek to analyze alternatives for truck routes to take heavy traffic out of the downtown area, and identify and develop implementation strategies for important transportation, alternative transportation, housing, economic development, community resiliency, and quality of life and placemaking initiatives of the city. Project Type: Planning/Study AQ Exempt: Exempt District: LaPorte County: Laporte Limits: Not Location Specific Narrative: New Project. This request is to develop a comprehensive and transportation plan for the city of La Porte. The plan will focus o |
Region: Northwestern MPO Lead Agency: La Porte |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2024 | Local Fund | $100,000 | $0 | $0 | $0 | $100,000 |
2024 | STBG Mich City UZA | $150,000 | $0 | $0 | $0 | $150,000 |
2022-2026 TOTAL | $250,000 | $0 | $0 | $0 | $250,000 | |
ALL YEARS TOTAL | $250,000 | $0 | $0 | $0 | $250,000 |
(Ver 3) 22-08
STATUS
Programmed FEDERAL
Title: Singing Sands trail phase III-A Route: N/A
Description: Singing Sands Trail Phase III-A (Liberty Trail to Hwy 12)
Bicycle Enhancement
Exempt
Lake
Narrative: Added ROW in FY 24
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2024 | Local Fund | $0 | $26,000 | $0 | $0 | $26,000 |
2024 | TAP Mich City UZA | $0 | $104,000 | $0 | $0 | $104,000 |
2026 | Local Fund | $0 | $0 | $491,760 | $0 | $491,760 |
2026 | TAP Mich City UZA | $0 | $0 | $1,967,039 | $0 | $1,967,039 |
2022-2026 TOTAL | $0 | $130,000 | $2,458,799 | $0 | $2,588,799 | |
ALL YEARS TOTAL | $0 | $130,000 | $2,458,799 | $0 | $2,588,799 |
Region: Northwestern MPO | Lead Agency: | Michigan City | ||
Previously Approved Version | ||||
2101147 (Ver 2) 22-03 | ||||
Title: Singing Sands trail phase III-A-FUTURE PROJECT | Route: N/A | |||
Description: Singing Sands Trail Phase III-A (Liberty Trail to Hwy 12) Project Type: Bicycle Enhancement AQ Exempt: | Exempt | District: LaPorte | ||
County: Lake Limits: | ||||
Narrative: Added des number, clarify project limits |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2026 | Local Fund | $0 | $0 | $491,760 | $0 | $491,760 |
2026 | TAP Mich City UZA | $0 | $0 | $1,967,039 | $0 | $1,967,039 |
2022-2026 TOTAL | $0 | $0 | $2,458,799 | $0 | $2,458,799 | |
ALL YEARS TOTAL | $0 | $0 | $2,458,799 | $0 | $2,458,799 |
Michigan City
(Ver 3) 22-08
STATUS
Programmed FEDERAL
Title: Singing Sands Trail Phase III-D Route: N/A
Description: Singing Sands Trail Phase III-D (Liberty Trail to 2011 E. Hwy 12)
Bicycle Enhancement
Exempt
Laporte
Narrative: Increased funding for ROW in FY 2024. However STIP does not show ROW funds on this project, so this amendment also tec
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2024 | Local Fund | $16,490 | $60,000 | $0 | $0 | $76,490 |
2024 | TAP Mich City UZA | $65,960 | $240,000 | $0 | $0 | $305,960 |
>2026 | Beyond | $0 | $0 | $1,820,925 | $0 | $1,820,925 |
2022-2026 TOTAL | $82,450 | $300,000 | $0 | $0 | $382,450 | |
ALL YEARS TOTAL | $82,450 | $300,000 | $1,820,925 | $0 | $2,203,375 |
Michigan City
2101148 (Ver 2) 22-03
Title: Singing Sands Trail Phase III-D Route: N/A
Description: Singing Sands Trail Phase III-D (Liberty Trail to 2011 E. Hwy 12)
Bicycle Enhancement
Exempt
Laporte
Narrative: Added des number and clarified limits.
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2024 | Local Fund | $0 | $27,314 | $0 | $0 | $27,314 |
2024 | TAP Mich City UZA | $0 | $109,255 | $0 | $0 | $109,255 |
>2026 | Beyond | $0 | $0 | $1,820,925 | $0 | $1,820,925 |
2022-2026 TOTAL | $0 | $136,569 | $0 | $0 | $136,569 | |
ALL YEARS TOTAL | $0 | $136,569 | $1,820,925 | $0 | $1,957,494 |
Michigan City
1173760 (Ver 7) 22-55 STATUS Programmed FEDERAL |
Title: Quality of Place / Added Travel Lanes at Kennedy Ave (Phase 4) Route: N/A Description: Kennedy Ave at intersection with Junction Ave, going South through to 67th St and then South to US 30. The added lanes will connect Kennedy Ave to US 30 and create a safer roadway for drivers and pedestrians. This project is planned to be substantially complete by 2030. Project Type: Existing Roadway Capacity Improveme AQ Exempt: Non-Exempt District: LaPorte County: Lake Limits: From Junction Ave to US 30 of Distance (mile) 0.83 Narrative: Added substantial funding for ROW, moved CN to a year outside of the current TIP. There are no changes to the scope of wor |
Region: Northwestern MPO Lead Agency: Schererville |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2025 | Local Fund | $0 | $382,750 | $0 | $0 | $382,750 |
2025 | STBG Chicago UZA | $0 | $1,531,000 | $0 | $0 | $1,531,000 |
<2022 | Prior | $548,664 | $0 | $0 | $0 | $548,664 |
>2026 | Beyond | $0 | $0 | $6,709,000 | $0 | $6,709,000 |
2022-2026 TOTAL | $0 | $1,913,750 | $0 | $0 | $1,913,750 | |
ALL YEARS TOTAL | $548,664 | $1,913,750 | $6,709,000 | $0 | $9,171,414 |
Note: Added substantial funding for ROW, moved CN to a year outside of the current TIP. There are no changes to the scope of work planned for this project. The substantially complete date has not changed. CN has been pushed outside of our current TIP, but is still planned to be completed by 2030. ROW amounts have been more accurately described and funds given to this phase.
Previously Approved Version |
1173760 (Ver 6) 22-04 |
Title: Quality of Place / Added Travel Lanes at Kennedy Ave (Phase 4) Route: N/A Description: Kennedy Ave at intersection with Junction Ave, going South through to 67th St and then South to US 30. The added lanes will connect Kennedy Ave to US 30 and create a safer roadway for drivers and pedestrians. Project Type: Existing Roadway Capacity Improveme AQ Exempt: Non-Exempt District: LaPorte County: Lake Limits: From Junction Ave to US 30 of Distance (mile) 0.83 Narrative: moved CN out of TIP, added ROW. |
Region: Northwestern MPO Lead Agency: Schererville |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2025 | Local Fund | $0 | $382,750 | $0 | $0 | $382,750 |
2025 | STBG Chicago UZA | $0 | $1,531,000 | $0 | $0 | $1,531,000 |
<2022 | Prior | $548,664 | $0 | $0 | $0 | $548,664 |
>2026 | Beyond | $0 | $0 | $6,709,000 | $0 | $6,709,000 |
2022-2026 TOTAL | $0 | $1,913,750 | $0 | $0 | $1,913,750 | |
ALL YEARS TOTAL | $548,664 | $1,913,750 | $6,709,000 | $0 | $9,171,414 |
2101141 (Ver 6) 22-08 STATUS Programmed FEDERAL |
Title: Multi use trail from transit parking lot to downtown Route: N/A Description: Provide a multi-use trail connection within our TOD, connecting the Chicago Dash stop to downtown. Project Type: Bicycle Enhancement AQ Exempt: Exempt District: LaPorte County: Porter Limits: Narrative: Added TA funds to this project and substansially increased CN funding. |
Region: Northwestern MPO Lead Agency: Valparaiso |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2022 | Federal Special | $118,300 | $0 | $0 | $0 | $118,300 |
2022 | Local Fund | $39,575 | $15,000 | $0 | $0 | $54,575 |
2024 | Federal Special | $0 | $0 | $1,441,405 | $0 | $1,441,405 |
2024 | Local Fund | $0 | $0 | $904,702 | $0 | $904,702 |
2024 | TAP Chicago UZA | $0 | $0 | $2,177,403 | $0 | $2,177,403 |
2022-2026 TOTAL | $157,875 | $15,000 | $4,523,510 | $0 | $4,696,385 | |
ALL YEARS TOTAL | $157,875 | $15,000 | $4,523,510 | $0 | $4,696,385 |
Previously Approved Version |
2101141 (Ver 5) 22-31 |
Title: Multi use trail from transit parking lot to downtown Route: N/A Description: Provide a multi-use trail connection within our TOD, connecting the Chicago Dash stop to downtown. Project Type: Bicycle Enhancement AQ Exempt: Exempt District: LaPorte County: Porter Limits: Narrative: Added RW phase to show estimated total project costs. |
Region: Northwestern MPO Lead Agency: Valparaiso |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2022 | Federal Special | $118,300 | $0 | $0 | $0 | $118,300 |
2022 | Local Fund | $39,575 | $15,000 | $0 | $0 | $54,575 |
2024 | Federal Special | $0 | $0 | $1,918,104 | $0 | $1,918,104 |
2024 | Local Fund | $0 | $0 | $479,526 | $0 | $479,526 |
2022-2026 TOTAL | $157,875 | $15,000 | $2,397,630 | $0 | $2,570,505 | |
ALL YEARS TOTAL | $157,875 | $15,000 | $2,397,630 | $0 | $2,570,505 |
1902686 (Ver 7) 22-17 STATUS Programmed FEDERAL |
Title: Roundabout; Valparaiso- Campbell & Lincoln Ave, Route: SR 130 Description: Transformative intersection Improvement. Roundabout at Campbell & Lincolnway. The total estimated cost for this project is $2,900,000 and is expected to be completed by 2030. Project Type: Intersection or Intersection Groups AQ Exempt: Exempt District: LaPorte County: Porter Limits: Nearest Crossstreet: Campbell Narrative: CN was mistakenly deleted. This amendment brings CN back into where it was FY 2025. |
Region: Northwestern MPO Lead Agency: Valparaiso |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2022 | CMAQ Chicago UZA | $146,679 | $0 | $0 | $0 | $146,679 |
2022 | Local Fund | $36,670 | $0 | $0 | $0 | $36,670 |
2024 | CMAQ Chicago UZA | $0 | $400,000 | $0 | $0 | $400,000 |
2024 | Local Fund | $0 | $100,000 | $0 | $0 | $100,000 |
2025 | CMAQ Chicago UZA | $0 | $0 | $2,216,121 | $0 | $2,216,121 |
2025 | Local Fund | $0 | $0 | $554,030 | $0 | $554,030 |
<2022 | Prior | $386,351 | $0 | $0 | $0 | $386,351 |
2022-2026 TOTAL | $183,349 | $500,000 | $2,770,151 | $0 | $3,453,500 | |
ALL YEARS TOTAL | $569,700 | $500,000 | $2,770,151 | $0 | $3,839,851 |
Previously Approved Version |
1902686 (Ver 6) 22-00 |
Title: Roundabout; Valparaiso- Campbell & Lincoln Ave, Route: SR 130 Description: Transformative intersection Improvement. Roundabout at Campbell & Lincolnway. The total estimated cost for this project is $2,900,000 and is expected to be completed by 2030. Project Type: Intersection or Intersection Groups AQ Exempt: Exempt District: LaPorte County: Porter Limits: Nearest Crossstreet: Campbell Narrative: Reduce funding to match Spending Plan CN chosen in NOFA 2020 |
Region: Northwestern MPO Lead Agency: Valparaiso |
FED FY | REVENUE SOURCE | PE | RW | CN | CE | TOTAL |
2024 | CMAQ Chicago UZA | $0 | $400,000 | $0 | $0 | $400,000 |
2024 | Local Fund | $0 | $100,000 | $0 | $0 | $100,000 |
2025 | CMAQ Chicago UZA | $0 | $0 | $2,216,121 | $0 | $2,216,121 |
2025 | Local Fund | $0 | $0 | $554,030 | $0 | $554,030 |
<2022 | Prior | $386,351 | $0 | $0 | $0 | $386,351 |
2022-2026 TOTAL | $0 | $500,000 | $2,770,151 | $0 | $3,270,151 | |
ALL YEARS TOTAL | $386,351 | $500,000 | $2,770,151 | $0 | $3,656,502 |
Prior
Beyond Total
INDOT | $0 | $0 | $13,125,740 | $6,388,000 | $340,000 | $0 | $80,776,682 | $80,776,682 | $100,630,422 | |
La Porte | $0 | $0 | $0 | $250,000 | $0 | $0 | $0 | $0 | $250,000 | |
Michigan City | $0 | $0 | $0 | $649,019 | $0 | $4,917,598 | $3,641,850 | $3,641,850 | $9,208,467 | |
Schererville | $1,097,328 | $0 | $0 | $0 | $3,827,500 | $0 | $13,418,000 | $13,418,000 | $18,342,828 | |
Valparaiso | $772,702 | $529,099 | $0 | $7,921,140 | $5,540,302 | $0 | $0 | $0 | $14,763,243 | |
TOTAL $1,870,030 | $529,099 | $13,125,740 | $15,208,159 | $9,707,802 | $4,9 | 17,598 | $97,836,532 | $97,836,532 | $143,194,960 |
Email to the ICG including the following parties was sent 12/9/2022. Concurrence is as follows:
FHWA concurrence date 12/16/2022 EPA concurrence date 12/16/2022 IDEM concurrence date12/16/2022 INDOT concurrence date12/16/2022 FTA concurrence date 12/16/2022
Approval is given with Concurrence by No Response.
(Ver 5) 22-08.5
STATUS
Programmed FEDERAL