2200533 (Ver 1) 22-08 STATUS New Project FEDERAL

Title: District Bridge Project (Rehabilitation) Route: N/A

Description: Bridge Deck Overlay, I 65 I-65 SB over 15th Avenue, 1.53 mi N of I80

Project Type: Bridge Deck Overlay AQ Exempt: Exempt District: LaPorte

County: Lake Limits:

Narrative: Amend FY23 PE $300,000, FY24 UT CN $5,000, FY25 RR CN $5,000 and FY27 CN $1,556,467.


Region: Northwestern MPO Lead Agency: INDOT

FED FY

REVENUE SOURCE

PE

RW

CN

CE

TOTAL

2023

NHPP Interstate

$300,000

$0

$0

$0

$300,000

2024

NHPP Interstate

$0

$0

$5,000

$0

$5,000

2025

NHPP Interstate

$0

$0

$5,000

$0

$5,000

>2026

Beyond

$0

$0

$1,556,467

$0

$1,556,467

2022-2026 TOTAL

$300,000

$0

$10,000

$0

$310,000

ALL YEARS TOTAL

$300,000

$0

$1,566,467

$0

$1,866,467


2200534 (Ver 1) 22-08 STATUS New Project FEDERAL

Title: District Bridge Project (Rehabilitation) Route: N/A

Description: Bridge Deck Overlay, I 65 I-65 NB over 15th Ave, 01.53 N I-80

Project Type: Bridge Deck Overlay AQ Exempt: Exempt District: LaPorte

County: Lake Limits:

Narrative: Amend FY23 PE $300,000, FY24 UT CN $5,000, FY25 RR CN $5,000 and FY27 CN $1,082,750.


Region: Northwestern MPO Lead Agency: INDOT

FED FY

REVENUE SOURCE

PE

RW

CN

CE

TOTAL

2023

NHPP Interstate

$300,000

$0

$0

$0

$300,000

2024

NHPP Interstate

$0

$0

$5,000

$0

$5,000

2025

NHPP Interstate

$0

$0

$5,000

$0

$5,000

>2026

Beyond

$0

$0

$1,082,750

$0

$1,082,750

2022-2026 TOTAL

$300,000

$0

$10,000

$0

$310,000

ALL YEARS TOTAL

$300,000

$0

$1,092,750

$0

$1,392,750


2200549 (Ver 1) 22-08 STATUS New Project FEDERAL

Title: District Bridge Project (Rehabilitation) Route: N/A

Description: Bridge Deck Overlay, US 6 over Coffee Creek, 2.1 miles East of SR 49

Project Type: Bridge Deck Overlay AQ Exempt: Exempt District: LaPorte

County: Porter Limits:

Narrative: Amend FY23 PE $50,000, FY24 UT CN $20,000, FY24 RW $15,000, FY25 RR CN $5,000 and FY27 CN $808,951.


Region: Northwestern MPO Lead Agency: INDOT

FED FY

REVENUE SOURCE

PE

RW

CN

CE

TOTAL

2023

NHPP Non Interstate

$50,000

$0

$0

$0

$50,000

2024

NHPP Non Interstate

$0

$15,000

$20,000

$0

$35,000

2025

NHPP Non Interstate

$0

$0

$5,000

$0

$5,000

>2026

Beyond

$0

$0

$808,951

$0

$808,951

2022-2026 TOTAL

$50,000

$15,000

$25,000

$0

$90,000

ALL YEARS TOTAL

$50,000

$15,000

$833,951

$0

$898,951


2200537 (Ver 1) 22-08 STATUS New Project FEDERAL

Title: District Bridge Project (Rehabilitation) Route: N/A

Description: Bridge Painting, I-80 Ramp 3L over I80 Ramp 3F, Kennedy Ave, 0.97mi E of US 41

Project Type: Bridge Painting AQ Exempt: Exempt District: LaPorte

County: Lake Limits:

Narrative: Amend FY23 PE $120,000, FY24 UT CN $5,000, FY25 RR CN $5,000 and FY27 CN $681,103.


Region: Northwestern MPO Lead Agency: INDOT

FED FY

REVENUE SOURCE

PE

RW

CN

CE

TOTAL

2023

NHPP Interstate

$120,000

$0

$0

$0

$120,000

2024

NHPP Interstate

$0

$0

$5,000

$0

$5,000

2025

NHPP Interstate

$0

$0

$5,000

$0

$5,000

>2026

Beyond

$0

$0

$681,103

$0

$681,103

2022-2026 TOTAL

$120,000

$0

$10,000

$0

$130,000

ALL YEARS TOTAL

$120,000

$0

$691,103

$0

$811,103


2200712 (Ver 1) 22-08 STATUS New Project FEDERAL

Title: District Bridge Project (Rehabilitation) Route: N/A

Description: Bridge Painting, SR 912 over 25TH AVE/177TH ST, 00.18 W I-80

Project Type: Bridge Painting AQ Exempt: Exempt District: LaPorte

County: Lake Limits:

Narrative: Amend FY23 PE $82,000, FY24 UT CN $20,000 and FY27 CN $463,874.


Region: Northwestern MPO Lead Agency: INDOT


2200737 (Ver 1) 22-08 STATUS New Project FEDERAL

Title: District Bridge Project (Rehabilitation) Route: N/A

Description: Bridge Painting, I 94 I-94 EB/WB under CR W800N, 02.05 E US 20

Project Type: Bridge Painting AQ Exempt: Exempt District: LaPorte

County: Laporte Limits:

Narrative: Amend FY23 PE $92,000, FY24 UT CN $10,000 and FY27 CN $520,444.


Region: Northwestern MPO Lead Agency: INDOT

FED FY

REVENUE SOURCE

PE

RW

CN

CE

TOTAL

2023

NHPP Non Interstate

$82,000

$0

$0

$0

$82,000

2024

NHPP Non Interstate

$0

$0

$20,000

$0

$20,000

>2026

Beyond

$0

$0

$463,874

$0

$463,874

2022-2026 TOTAL

$82,000

$0

$20,000

$0

$102,000

ALL YEARS TOTAL

$82,000

$0

$483,874

$0

$565,874

FED FY

REVENUE SOURCE

PE

RW

CN

CE

TOTAL

2023

NHPP Interstate

$92,000

$0

$0

$0

$92,000

2024

NHPP Interstate

$0

$0

$10,000

$0

$10,000

>2026

Beyond

$0

$0

$520,444

$0

$520,444

2022-2026 TOTAL

$92,000

$0

$10,000

$0

$102,000

ALL YEARS TOTAL

$92,000

$0

$530,444

$0

$622,444


2200738 (Ver 1) 22-08 STATUS New Project FEDERAL

Title: District Bridge Project (Rehabilitation) Route: N/A

Description: Bridge Painting, I 94 I-94 EB/WB under Waverly Rd, 01.12 W SR 49

Project Type: Bridge Painting AQ Exempt: Exempt District: LaPorte

County: Porter Limits:

Narrative: Amend FY23 PE $92,000, FY24 UT CN $10,000 and FY27 CN $520,444.


Region: Northwestern MPO Lead Agency: INDOT


2200739 (Ver 1) 22-08 STATUS New Project FEDERAL

Title: District Bridge Project (Rehabilitation) Route: N/A

Description: Bridge Painting, I 94 I-94 WB over Jensen Dr., 00.53 E SR 249

Project Type: Bridge Painting AQ Exempt: Exempt District: LaPorte

County: Porter Limits:

Narrative: Amend FY23 PE $80,000, FY24 UT CN $10,000 and FY27 CN $452,560


Region: Northwestern MPO Lead Agency: INDOT

FED FY

REVENUE SOURCE

PE

RW

CN

CE

TOTAL

2023

NHPP Interstate

$92,000

$0

$0

$0

$92,000

2024

NHPP Interstate

$0

$0

$10,000

$0

$10,000

>2026

Beyond

$0

$0

$520,444

$0

$520,444

2022-2026 TOTAL

$92,000

$0

$10,000

$0

$102,000

ALL YEARS TOTAL

$92,000

$0

$530,444

$0

$622,444

FED FY

REVENUE SOURCE

PE

RW

CN

CE

TOTAL

2023

NHPP Interstate

$80,000

$0

$0

$0

$80,000

2024

NHPP Interstate

$0

$0

$10,000

$0

$10,000

>2026

Beyond

$0

$0

$452,560

$0

$452,560

2022-2026 TOTAL

$80,000

$0

$10,000

$0

$90,000

ALL YEARS TOTAL

$80,000

$0

$462,560

$0

$542,560


2200740 (Ver 1) 22-08 STATUS New Project FEDERAL

Title: District Bridge Project (Rehabilitation) Route: N/A

Description: Bridge Painting, I 94 I-94 EB over Jensen Dr., 00.53 E SR 249

Project Type: Bridge Painting AQ Exempt: Exempt District: LaPorte

County: Porter Limits:

Narrative: Amend FY23 PE $80,000 and FY27 CN $452,560.


Region: Northwestern MPO Lead Agency: INDOT


2200750 (Ver 1) 22-08 STATUS New Project FEDERAL

Title: Bridge Thin Deck Overlay Route: N/A

Description: Bridge Thin Deck Overlay, I 94 I-94 WB over I80/90 (Toll Rd), 0.46 E I80

Project Type: Bridge Thin Deck Overlay AQ Exempt: Exempt District: LaPorte

County: Lake Limits:

Narrative: Amend FY23 PE $108,000 and FY27 CN $610,956.


Region: Northwestern MPO Lead Agency: INDOT

FED FY

REVENUE SOURCE

PE

RW

CN

CE

TOTAL

2023

NHPP Interstate

$80,000

$0

$0

$0

$80,000

>2026

Beyond

$0

$0

$452,560

$0

$452,560

2022-2026 TOTAL

$80,000

$0

$0

$0

$80,000

ALL YEARS TOTAL

$80,000

$0

$452,560

$0

$532,560

FED FY

REVENUE SOURCE

PE

RW

CN

CE

TOTAL

2023

NHPP Interstate

$108,000

$0

$0

$0

$108,000

>2026

Beyond

$0

$0

$610,956

$0

$610,956

2022-2026 TOTAL

$108,000

$0

$0

$0

$108,000

ALL YEARS TOTAL

$108,000

$0

$610,956

$0

$718,956


2200751 (Ver 1) 22-08 STATUS New Project FEDERAL

Title: Bridge Thin Deck Overlay Route: N/A

Description: Bridge Thin Deck Overlay, I 94 I-94 EB over I80/I90 (Toll Road), 0.46mi E I-80

Project Type: Bridge Thin Deck Overlay AQ Exempt: Exempt District: LaPorte

County: Lake Limits:

Narrative: Amend FY23 PE $108,000 and FY27 CN $610,956.


Region: Northwestern MPO Lead Agency: INDOT


2200966 (Ver 1) 22-08 STATUS New Project FEDERAL

Title: District Pavement Project (Non-I) Route: N/A

Description: Concrete Pavement Preservation (CPP), US 12 from 0.38 mi. E. of I-65 to US 12/20 Split (Melton Rd.)

Project Type: Concrete Pavement Preservation (CPP) AQ Exempt: Exempt District: LaPorte

County: Lake Limits:

Narrative: Amend FY23 PE $1,200,000, FY24 UT CN $10,000, FY25 RR CN $50,000, FY27 CN $7,001,582 and FY27 CE $172,000.


Region: Northwestern MPO Lead Agency: INDOT

FED FY

REVENUE SOURCE

PE

RW

CN

CE

TOTAL

2023

NHPP Interstate

$108,800

$0

$0

$0

$108,800

>2026

Beyond

$0

$0

$610,956

$0

$610,956

2022-2026 TOTAL

$108,800

$0

$0

$0

$108,800

ALL YEARS TOTAL

$108,800

$0

$610,956

$0

$719,756

FED FY

REVENUE SOURCE

PE

RW

CN

CE

TOTAL

2023

NHPP Non Interstate

$1,200,000

$0

$0

$0

$1,200,000

2024

NHPP Non Interstate

$0

$0

$10,000

$0

$10,000

2025

NHPP Non Interstate

$0

$0

$50,000

$0

$50,000

>2026

Beyond

$0

$0

$7,001,582

$172,000

$7,173,582

2022-2026 TOTAL

$1,200,000

$0

$60,000

$0

$1,260,000

ALL YEARS TOTAL

$1,200,000

$0

$7,061,582

$172,000

$8,433,582


2200825 (Ver 1) 22-08 STATUS New Project FEDERAL

Title: District Pavement Project (Non-I) Route: N/A

Description: Concrete Pavement Restoration (CPR), SR 2 from 0.8 mi. W. of I-65 (Mississippi St.) to 0.9 mi E of I-65

Project Type: Concrete Pavement Restoration (CPR) AQ Exempt: Exempt District: LaPorte

County: Lake Limits:

Narrative: Amend FY23 PE $765,000, FY24 UT CN $5,000, FY25 RR CN $5,000, FY27 CN $5,794,274 and FY27 CE $50,000.


Region: Northwestern MPO Lead Agency: INDOT

FED FY

REVENUE SOURCE

PE

RW

CN

CE

TOTAL

2023

NHPP Non Interstate

$765,000

$0

$0

$0

$765,000

2024

NHPP Non Interstate

$0

$0

$5,000

$0

$5,000

2025

NHPP Non Interstate

$0

$0

$5,000

$0

$5,000

>2026

Beyond

$0

$0

$5,794,274

$50,000

$5,844,274

2022-2026 TOTAL

$765,000

$0

$10,000

$0

$775,000

ALL YEARS TOTAL

$765,000

$0

$5,804,274

$50,000

$6,619,274


2200486 (Ver 1) 22-08 STATUS New Project FEDERAL

Title: District Pavement Project (Non-I) Route: N/A

Description: HMA Overlay, Preventive Maintenance, SR 39 from US 6 to S. Jct of SR 2

Project Type: HMA Overlay, Preventive Maintenance AQ Exempt: Exempt District: LaPorte

County: Laporte Limits:

Narrative: Amend FY23 PE $450,000, FY24 RW $20,000, FY24 UT CN $20,000 and FY27 CN $2,531,199.


Region: Northwestern MPO Lead Agency: INDOT

FED FY

REVENUE SOURCE

PE

RW

CN

CE

TOTAL

2023

NHPP Non Interstate

$450,000

$0

$0

$0

$450,000

2024

NHPP Non Interstate

$0

$20,000

$20,000

$0

$40,000

2025

NHPP Non Interstate

$0

$0

$20,000

$0

$20,000

>2026

Beyond

$0

$0

$2,531,199

$0

$2,531,199

2022-2026 TOTAL

$450,000

$20,000

$40,000

$0

$510,000

ALL YEARS TOTAL

$450,000

$20,000

$2,571,199

$0

$3,041,199


2200827 (Ver 1) 22-08 STATUS New Project FEDERAL

Title: District Pavement Project (Non-I) Route: N/A

Description: HMA Overlay, Preventive Maintenance, SR 8 from 0.25 mi E. of US 231 to 0.74 mi. W. of SR 49

Project Type: HMA Overlay, Preventive Maintenance AQ Exempt: Exempt District: LaPorte

County: Porter Limits:

Narrative: Amend FY23 PR $650,000, FY24 UT CN $21,000, FY25 RR CN $5,000 and FY27 CN $4,955,822.


Region: Northwestern MPO Lead Agency: INDOT

FED FY

REVENUE SOURCE

PE

RW

CN

CE

TOTAL

2023

NHPP Non Interstate

$650,000

$0

$0

$0

$650,000

2024

NHPP Non Interstate

$0

$0

$21,000

$0

$21,000

2025

NHPP Non Interstate

$0

$0

$5,000

$0

$5,000

>2026

Beyond

$0

$0

$4,955,822

$0

$4,955,822

2022-2026 TOTAL

$650,000

$0

$26,000

$0

$676,000

ALL YEARS TOTAL

$650,000

$0

$4,981,822

$0

$5,631,822


2200828 (Ver 1) 22-08 STATUS New Project FEDERAL

Title: District Pavement Project (Non-I) Route: N/A

Description: HMA Overlay, Preventive Maintenance, SR 152 from I-80/94 to US 20 (Michigan Ave./Carroll St.)

Project Type: HMA Overlay, Preventive Maintenance AQ Exempt: Exempt District: LaPorte

County: Lake Limits:

Narrative: Amend FY23 PE $650,000, FY24 UT CN $12,000 and FY27 CN $5,159,675.


Region: Northwestern MPO Lead Agency: INDOT

FED FY

REVENUE SOURCE

PE

RW

CN

CE

TOTAL

2023

NHPP Non Interstate

$650,000

$0

$0

$0

$650,000

2024

NHPP Non Interstate

$0

$0

$12,000

$0

$12,000

>2026

Beyond

$0

$0

$5,159,675

$0

$5,159,675

2022-2026 TOTAL

$650,000

$0

$12,000

$0

$662,000

ALL YEARS TOTAL

$650,000

$0

$5,171,675

$0

$5,821,675


2200965 (Ver 1) 22-08 STATUS New Project FEDERAL

Title: District Pavement Project (Non-I) Route: N/A

Description: HMA Overlay, Preventive Maintenance, US 12 from IL State Line to US 41

Project Type: HMA Overlay, Preventive Maintenance AQ Exempt: Exempt District: LaPorte

County: Lake Limits:

Narrative: Amend FY23 PE $300,000, FY24 UT CN $20,000, FY24 RW $50,000, FY25 RR CN $20,000 and FY27 CN $1,833,862.


Region: Northwestern MPO Lead Agency: INDOT

FED FY

REVENUE SOURCE

PE

RW

CN

CE

TOTAL

2023

NHPP Non Interstate

$300,000

$0

$0

$0

$300,000

2024

NHPP Non Interstate

$0

$50,000

$20,000

$0

$70,000

2025

NHPP Non Interstate

$0

$0

$20,000

$0

$20,000

>2026

Beyond

$0

$0

$1,833,862

$0

$1,833,862

2022-2026 TOTAL

$300,000

$50,000

$40,000

$0

$390,000

ALL YEARS TOTAL

$300,000

$50,000

$1,873,862

$0

$2,223,862


2200967 (Ver 1) 22-08 STATUS New Project FEDERAL

Title: District Pavement Project (Non-I) Route: N/A

Description: HMA Overlay, Preventive Maintenance, US 35 from US 30 to S. Jct of US 6

Project Type: HMA Overlay, Preventive Maintenance AQ Exempt: Exempt District: LaPorte

County: Laporte Limits:

Narrative: Amend FY23 PE $1,224,000, FY24 UT CN $5,000, FY25 RR CN $5,000 and FY27 CN $6,890,710.


Region: Northwestern MPO Lead Agency: INDOT

FED FY

REVENUE SOURCE

PE

RW

CN

CE

TOTAL

2023

NHPP Non Interstate

$1,224,000

$0

$0

$0

$1,224,000

2024

NHPP Non Interstate

$0

$0

$5,000

$0

$5,000

2025

NHPP Non Interstate

$0

$0

$5,000

$0

$5,000

>2026

Beyond

$0

$0

$6,890,710

$0

$6,890,710

2022-2026 TOTAL

$1,224,000

$0

$10,000

$0

$1,234,000

ALL YEARS TOTAL

$1,224,000

$0

$6,900,710

$0

$8,124,710


2200969 (Ver 1) 22-08 STATUS New Project FEDERAL

Title: District Pavement Project (Non-I) Route: N/A

Description: HMA Overlay, Preventive Maintenance, SR 312 from 0.95 mi. E. of US 41 (White Oak Ave.) to SR 912 (Cline Ave)

Project Type: HMA Overlay, Preventive Maintenance AQ Exempt: Exempt District: LaPorte

County: Lake Limits:

Narrative: Amend FY23 PE $500,000, FY24 UT CN $20,000, FY24 RW $20,000, FY25 RR CN $50,000 and FY27 CN $3,347,080.


Region: Northwestern MPO Lead Agency: INDOT

FED FY

REVENUE SOURCE

PE

RW

CN

CE

TOTAL

2023

NHPP Non Interstate

$500,000

$0

$0

$0

$500,000

2024

NHPP Non Interstate

$0

$20,000

$20,000

$0

$40,000

2025

NHPP Non Interstate

$0

$0

$50,000

$0

$50,000

>2026

Beyond

$0

$0

$3,347,080

$0

$3,347,080

2022-2026 TOTAL

$500,000

$20,000

$70,000

$0

$590,000

ALL YEARS TOTAL

$500,000

$20,000

$3,417,080

$0

$3,937,080


2200926 (Ver 1) 22-08 STATUS New Project FEDERAL

Title: District Pavement Project (Non-I) Route: N/A

Description: HMA Overlay Minor Structural, SR 2 From the East Junction of US 421 to the West Junction of SR 39

Project Type: HMA Overlay Minor Structural AQ Exempt: Exempt District: LaPorte

County: Laporte Limits:

Narrative: Amend FY23 PE $1,500,000, FY24 UT CN $15,000, FY24 RW $50,000, FY25 RR CN $5,000, FY27CN $8,607,985 and FY27


Region: Northwestern MPO Lead Agency: INDOT

FED FY

REVENUE SOURCE

PE

RW

CN

CE

TOTAL

2023

NHPP Non Interstate

$1,500,000

$0

$0

$0

$1,500,000

2024

NHPP Non Interstate

$0

$50,000

$15,000

$0

$65,000

2025

NHPP Non Interstate

$0

$0

$5,000

$0

$5,000

>2026

Beyond

$0

$0

$8,607,985

$65,000

$8,672,985

2022-2026 TOTAL

$1,500,000

$50,000

$20,000

$0

$1,570,000

ALL YEARS TOTAL

$1,500,000

$50,000

$8,627,985

$65,000

$10,242,985


2200821 (Ver 1) 22-08 STATUS New Project FEDERAL

Title: District Pavement Project (Interstate) Route: N/A

Description: HMA Overlay Minor Structural, I-80/90 Interchange (Toll Road) to 0.52 mi. E. of SR 249 (Jensen Dr.)

Project Type: HMA Overlay Minor Structural AQ Exempt: Exempt District: LaPorte

County: Lake, Porter Limits:

Narrative: Amend FY23 PE $2,621,520, FY24 UT CN $5,000, FY25 RR CN $5,000 and FY27 CN $14,708,990.


Region: Northwestern MPO Lead Agency: INDOT

FED FY

REVENUE SOURCE

PE

RW

CN

CE

TOTAL

2023

NHPP Interstate

$2,621,520

$0

$0

$0

$2,621,520

2024

NHPP Interstate

$0

$0

$5,000

$0

$5,000

2025

NHPP Interstate

$0

$0

$5,000

$0

$5,000

>2026

Beyond

$0

$0

$14,708,990

$0

$14,708,990

2022-2026 TOTAL

$2,621,520

$0

$10,000

$0

$2,631,520

ALL YEARS TOTAL

$2,621,520

$0

$14,718,990

$0

$17,340,510


2200829 (Ver 1) 22-08 STATUS New Project FEDERAL

Title: District Pavement Project (Non-I) Route: N/A

Description: HMA Overlay Minor Structural, SR 53 from US 30 to 1.04 mi. N. of US 30 (73rd Ave.)

Project Type: HMA Overlay Minor Structural AQ Exempt: Exempt District: LaPorte

County: Lake Limits:

Narrative: Amend FY23 PE $430,420, FY24 UT CN $5,000, FY24 RW $50,000, FY25 RR CN $5,000 and FY27 CN $2,424,897.


Region: Northwestern MPO Lead Agency: INDOT


2200991 (Ver 1) 22-08 STATUS New Project FEDERAL

Title: Interchange Modification on US 6 & I-80/94 Route: N/A

Description: Interchange Modification, US 6 @ I-80/94 EB/WB, 2.27mi N of SR 51. The interchange will go from a full cloverleaf to a partial cloverleaf, with off ramps coming to signalized intersections on US 6 (Ripley St). On ramps to I-80/94 will remain cloverleafs.

Project Type: Interchange Modification AQ Exempt: Exempt District: LaPorte

County: Lake Limits:

Narrative: Amend FY24 CN $5,160,000 Clarified description of scope.


Region: Northwestern MPO Lead Agency: INDOT

FED FY

REVENUE SOURCE

PE

RW

CN

CE

TOTAL

2023

NHPP Non Interstate

$430,420

$0

$0

$0

$430,420

2024

NHPP Non Interstate

$0

$50,000

$5,000

$0

$55,000

2025

NHPP Non Interstate

$0

$0

$5,000

$0

$5,000

>2026

Beyond

$0

$0

$2,424,897

$0

$2,424,897

2022-2026 TOTAL

$430,420

$50,000

$10,000

$0

$490,420

ALL YEARS TOTAL

$430,420

$50,000

$2,434,897

$0

$2,915,317

FED FY

REVENUE SOURCE

PE

RW

CN

CE

TOTAL

2024

NHPP Non Interstate

$0

$0

$5,160,000

$0

$5,160,000

2022-2026 TOTAL

$0

$0

$5,160,000

$0

$5,160,000

ALL YEARS TOTAL

$0

$0

$5,160,000

$0

$5,160,000


2200043 (Ver 1) 22-08 STATUS New Project FEDERAL

Title: District Pavement Project (Non-I) Route: N/A

Description: Intersection Improvement, SR 2 at CR 500W, 3.27mi West of SR 39.

Project Type: Intersection Improvement AQ Exempt: Exempt District: LaPorte

County: Laporte Limits:

Narrative: Amend FY23 PE $300,000, FY24 UT CN $10,000, FY24 RW $110,000, FY27 CN $1,386,429 and FY27 CE $150,000.


Region: Northwestern MPO Lead Agency: INDOT

FED FY

REVENUE SOURCE

PE

RW

CN

CE

TOTAL

2023

NHPP Non Interstate

$300,000

$0

$0

$0

$300,000

2024

NHPP Non Interstate

$0

$110,000

$10,000

$0

$120,000

>2026

Beyond

$0

$0

$1,386,429

$150,000

$1,536,429

2022-2026 TOTAL

$300,000

$110,000

$10,000

$0

$420,000

ALL YEARS TOTAL

$300,000

$110,000

$1,396,429

$150,000

$1,956,429


2200046 (Ver 1) 22-08 STATUS New Project FEDERAL

Title: District Intersection Improvement Project Route: N/A

Description: Intersection Improvement, US 35 at Johnson/Severs Road 0.62 Mile North of SR 39 (N. Jct)

Project Type: Intersection Improvement AQ Exempt: Exempt District: LaPorte

County: Laporte Limits:

Narrative: Amend FY23 PE $380,000, FY24 RW $530,000, FY25 UT CN $120,000, FY27CN $3,810,000 and FY27 CE $230,000.


Region: Northwestern MPO Lead Agency: INDOT


2201077 (Ver 1) 22-08 STATUS New Project FEDERAL

Title: LaPorte District Safety Systemic - New or Slotted Left Turn (No ROW) Route: N/A

Description: LaPorte District Safety Systemic - New or Slotted Left Turn (No ROW)

Project Type: Other Type Project (Miscellaneous) AQ Exempt: Exempt District: LaPorte

County: Various Limits:

Narrative: Amend FY23 PE $350,000 and FY27 CN $1,990,000.


Region: Northwestern MPO Lead Agency: INDOT

FED FY

REVENUE SOURCE

PE

RW

CN

CE

TOTAL

2023

NHPP Non Interstate

$380,000

$0

$0

$0

$380,000

2024

NHPP Non Interstate

$0

$530,000

$0

$0

$530,000

2025

NHPP Non Interstate

$0

$0

$120,000

$0

$120,000

>2026

Beyond

$0

$0

$3,810,000

$230,000

$4,040,000

2022-2026 TOTAL

$380,000

$530,000

$120,000

$0

$1,030,000

ALL YEARS TOTAL

$380,000

$530,000

$3,930,000

$230,000

$5,070,000

FED FY

REVENUE SOURCE

PE

RW

CN

CE

TOTAL

2023

NHPP Non Interstate

$350,000

$0

$0

$0

$350,000

>2026

Beyond

$0

$0

$1,990,000

$0

$1,990,000

2022-2026 TOTAL

$350,000

$0

$0

$0

$350,000

ALL YEARS TOTAL

$350,000

$0

$1,990,000

$0

$2,340,000


2200613 (Ver 1) 22-08 STATUS New Project FEDERAL

Title: District Small Structure Project Route: N/A

Description: Small Structure Pipe Lining, SR 149, 0.41 N JCT SR 130

Project Type: Small Structure Pipe Lining AQ Exempt: Exempt District: LaPorte

County: Porter Limits:

Narrative: Amend FY23 PE $49,000, FY24 RW $20,000 and FY27 CN $274,591.


Region: Northwestern MPO Lead Agency: INDOT

FED FY

REVENUE SOURCE

PE

RW

CN

CE

TOTAL

2023

NHPP Non Interstate

$49,000

$0

$0

$0

$49,000

2024

NHPP Non Interstate

$0

$20,000

$0

$0

$20,000

>2026

Beyond

$0

$0

$274,591

$0

$274,591

2022-2026 TOTAL

$49,000

$20,000

$0

$0

$69,000

ALL YEARS TOTAL

$49,000

$20,000

$274,591

$0

$343,591


2200621 (Ver 1) 22-08 STATUS New Project FEDERAL

Title: District Small Structure Project Route: N/A

Description: Small Structure Pipe Lining, SR 149, 0.98 S JCT US 20

Project Type: Small Structure Pipe Lining AQ Exempt: Exempt District: LaPorte

County: Porter Limits:

Narrative: Amend FY23 PE $40,000, FY24 RW $20,000, FY24 UT CN $5,000, FY25 RR CN $5,000 and FY27 CN $222,716.


Region: Northwestern MPO Lead Agency: INDOT

FED FY

REVENUE SOURCE

PE

RW

CN

CE

TOTAL

2023

NHPP Non Interstate

$40,000

$0

$0

$0

$40,000

2024

NHPP Non Interstate

$0

$20,000

$5,000

$0

$25,000

2025

NHPP Non Interstate

$0

$0

$5,000

$0

$5,000

>2026

Beyond

$0

$0

$222,716

$0

$222,716

2022-2026 TOTAL

$40,000

$20,000

$10,000

$0

$70,000

ALL YEARS TOTAL

$40,000

$20,000

$232,716

$0

$292,716


2200622 (Ver 1) 22-08 STATUS New Project FEDERAL

Title: District Small Structure Project Route: N/A

Description: Small Structure Pipe Lining, SR 39 at Kingsbury Creek, 2.33 N JCT US 6

Project Type: Small Structure Pipe Lining AQ Exempt: Exempt District: LaPorte

County: Laporte Limits:

Narrative: Amend FY23 PE $35,000, FY24 RW $10,000 and FY27 CN $194,601.


Region: Northwestern MPO Lead Agency: INDOT


2200625 (Ver 1) 22-08 STATUS New Project FEDERAL

Title: District Small Structure Project Route: N/A

Description: Small Structure Pipe Lining, I-80 Ramp 2B over UNT, 0.03 E JCT SR 152

Project Type: Small Structure Pipe Lining AQ Exempt: Exempt District: LaPorte

County: Lake Limits:

Narrative: Amend FY23 PE $75,000, FY24 UT CN $10,000 and FY27 CN $124,454.


Region: Northwestern MPO Lead Agency: INDOT

FED FY

REVENUE SOURCE

PE

RW

CN

CE

TOTAL

2023

NHPP Non Interstate

$35,000

$0

$0

$0

$35,000

2024

NHPP Non Interstate

$0

$10,000

$0

$0

$10,000

>2026

Beyond

$0

$0

$194,601

$0

$194,601

2022-2026 TOTAL

$35,000

$10,000

$0

$0

$45,000

ALL YEARS TOTAL

$35,000

$10,000

$194,601

$0

$239,601

FED FY

REVENUE SOURCE

PE

RW

CN

CE

TOTAL

2023

NHPP Interstate

$75,000

$0

$0

$0

$75,000

2024

NHPP Interstate

$0

$0

$10,000

$0

$10,000

>2026

Beyond

$0

$0

$124,454

$0

$124,454

2022-2026 TOTAL

$75,000

$0

$10,000

$0

$85,000

ALL YEARS TOTAL

$75,000

$0

$134,454

$0

$209,454


2200623 (Ver 1) 22-08 STATUS New Project FEDERAL

Title: District Small Structure Project Route: N/A

Description: Small Structure Replacement, SR 8 over Phillips Ditch, 5.65 mi E US 231

Project Type: Small Structure Replacement AQ Exempt: Exempt District: LaPorte

County: Porter Limits:

Narrative: Amend FY23 PE $115,000, FY24 RW $30,000, FY25 UT CN $20,000 and FY27 CN $650,555.


Region: Northwestern MPO Lead Agency: INDOT

FED FY

REVENUE SOURCE

PE

RW

CN

CE

TOTAL

2023

NHPP Non Interstate

$115,000

$0

$0

$0

$115,000

2024

NHPP Non Interstate

$0

$30,000

$0

$0

$30,000

2025

NHPP Non Interstate

$0

$0

$20,000

$0

$20,000

>2026

Beyond

$0

$0

$650,555

$0

$650,555

2022-2026 TOTAL

$115,000

$30,000

$20,000

$0

$165,000

ALL YEARS TOTAL

$115,000

$30,000

$670,555

$0

$815,555


2200506 (Ver 1) 22-08 STATUS New Project FEDERAL

Title: District Small Structure Project Route: N/A

Description: Small Structures & Drains Construction

Project Type: Small Structures & Drains Construction AQ Exempt: Exempt District: LaPorte

County: Laporte Limits:

Narrative: Amend FY23 PE $78,000, FY24 RW $50,000, FY24 UT CN $5,000, FY25 RR CN $5,000 and FY27 CN $439,195.


Region: Northwestern MPO Lead Agency: INDOT

FED FY

REVENUE SOURCE

PE

RW

CN

CE

TOTAL

2023

NHPP Non Interstate

$78,000

$0

$0

$0

$78,000

2024

NHPP Non Interstate

$0

$50,000

$5,000

$0

$55,000

2025

NHPP Non Interstate

$0

$0

$5,000

$0

$5,000

>2026

Beyond

$0

$0

$439,195

$0

$439,195

2022-2026 TOTAL

$78,000

$50,000

$10,000

$0

$138,000

ALL YEARS TOTAL

$78,000

$50,000

$449,195

$0

$577,195


NIRPC27006 (Ver 1) 22-08 STATUS New Project FEDERAL

Title: City of La Porte Comprehensive and Transportation Plan Route: N/A

Description: This request is to develop a comprehensive and transportation plan for the city of La Porte. The plan will focus on several important transportation, land use, housing, economic development, environmental/resiliency, quality of life, and placemaking objectives for the city. The plan will also seek to analyze alternatives for truck routes to take heavy traffic out of the downtown area, and identify and develop implementation strategies for important transportation, alternative transportation, housing, economic development, community resiliency, and quality of life and placemaking initiatives of the city.

Project Type: Planning/Study AQ Exempt: Exempt District: LaPorte

County: Laporte Limits: Not Location Specific

Narrative: New Project. This request is to develop a comprehensive and transportation plan for the city of La Porte. The plan will focus o


Region: Northwestern MPO Lead Agency: La Porte

FED FY

REVENUE SOURCE

PE

RW

CN

CE

TOTAL

2024

Local Fund

$100,000

$0

$0

$0

$100,000

2024

STBG Mich City UZA

$150,000

$0

$0

$0

$150,000

2022-2026 TOTAL

$250,000

$0

$0

$0

$250,000

ALL YEARS TOTAL

$250,000

$0

$0

$0

$250,000


2101147

(Ver 3) 22-08

STATUS

Programmed FEDERAL

Title: Singing Sands trail phase III-A Route: N/A

Description: Singing Sands Trail Phase III-A (Liberty Trail to Hwy 12)

Project Type:

Bicycle Enhancement

AQ Exempt:

Exempt

District: LaPorte

County:

Lake

Limits:

Narrative: Added ROW in FY 24


FED FY

REVENUE SOURCE

PE

RW

CN

CE

TOTAL

2024

Local Fund

$0

$26,000

$0

$0

$26,000

2024

TAP Mich City UZA

$0

$104,000

$0

$0

$104,000

2026

Local Fund

$0

$0

$491,760

$0

$491,760

2026

TAP Mich City UZA

$0

$0

$1,967,039

$0

$1,967,039

2022-2026 TOTAL

$0

$130,000

$2,458,799

$0

$2,588,799

ALL YEARS TOTAL

$0

$130,000

$2,458,799

$0

$2,588,799


Region: Northwestern MPO


Lead Agency:

Michigan City


Previously Approved Version





2101147 (Ver 2) 22-03





Title: Singing Sands trail phase III-A-FUTURE PROJECT




Route: N/A

Description: Singing Sands Trail Phase III-A (Liberty Trail to Hwy 12)

Project Type: Bicycle Enhancement AQ Exempt:


Exempt




District: LaPorte

County: Lake Limits:





Narrative: Added des number, clarify project limits






FED FY

REVENUE SOURCE

PE

RW

CN

CE

TOTAL

2026

Local Fund

$0

$0

$491,760

$0

$491,760

2026

TAP Mich City UZA

$0

$0

$1,967,039

$0

$1,967,039

2022-2026 TOTAL

$0

$0

$2,458,799

$0

$2,458,799

ALL YEARS TOTAL

$0

$0

$2,458,799

$0

$2,458,799


Region:

Northwestern MPO

Lead Agency:

Michigan City


2101148

(Ver 3) 22-08

STATUS

Programmed FEDERAL

Title: Singing Sands Trail Phase III-D Route: N/A

Description: Singing Sands Trail Phase III-D (Liberty Trail to 2011 E. Hwy 12)

Project Type:

Bicycle Enhancement

AQ Exempt:

Exempt

District: LaPorte

County:

Laporte

Limits:

Narrative: Increased funding for ROW in FY 2024. However STIP does not show ROW funds on this project, so this amendment also tec


FED FY

REVENUE SOURCE

PE

RW

CN

CE

TOTAL

2024

Local Fund

$16,490

$60,000

$0

$0

$76,490

2024

TAP Mich City UZA

$65,960

$240,000

$0

$0

$305,960

>2026

Beyond

$0

$0

$1,820,925

$0

$1,820,925

2022-2026 TOTAL

$82,450

$300,000

$0

$0

$382,450

ALL YEARS TOTAL

$82,450

$300,000

$1,820,925

$0

$2,203,375


Region:

Northwestern MPO

Lead Agency:

Michigan City

Previously Approved Version

2101148 (Ver 2) 22-03

Title: Singing Sands Trail Phase III-D Route: N/A

Description: Singing Sands Trail Phase III-D (Liberty Trail to 2011 E. Hwy 12)

Project Type:

Bicycle Enhancement

AQ Exempt:

Exempt

District: LaPorte

County:

Laporte

Limits:

Narrative: Added des number and clarified limits.


FED FY

REVENUE SOURCE

PE

RW

CN

CE

TOTAL

2024

Local Fund

$0

$27,314

$0

$0

$27,314

2024

TAP Mich City UZA

$0

$109,255

$0

$0

$109,255

>2026

Beyond

$0

$0

$1,820,925

$0

$1,820,925

2022-2026 TOTAL

$0

$136,569

$0

$0

$136,569

ALL YEARS TOTAL

$0

$136,569

$1,820,925

$0

$1,957,494


Region:

Northwestern MPO

Lead Agency:

Michigan City


1173760 (Ver 7) 22-55 STATUS Programmed FEDERAL

Title: Quality of Place / Added Travel Lanes at Kennedy Ave (Phase 4) Route: N/A

Description: Kennedy Ave at intersection with Junction Ave, going South through to 67th St and then South to US 30. The added lanes will connect Kennedy Ave to US 30 and create a safer roadway for drivers and pedestrians. This project is planned to be substantially complete by 2030.

Project Type: Existing Roadway Capacity Improveme AQ Exempt: Non-Exempt District: LaPorte

County: Lake Limits: From Junction Ave to US 30 of Distance (mile) 0.83

Narrative: Added substantial funding for ROW, moved CN to a year outside of the current TIP. There are no changes to the scope of wor


Region: Northwestern MPO Lead Agency: Schererville


FED FY

REVENUE SOURCE

PE

RW

CN

CE

TOTAL

2025

Local Fund

$0

$382,750

$0

$0

$382,750

2025

STBG Chicago UZA

$0

$1,531,000

$0

$0

$1,531,000

<2022

Prior

$548,664

$0

$0

$0

$548,664

>2026

Beyond

$0

$0

$6,709,000

$0

$6,709,000

2022-2026 TOTAL

$0

$1,913,750

$0

$0

$1,913,750

ALL YEARS TOTAL

$548,664

$1,913,750

$6,709,000

$0

$9,171,414

Note: Added substantial funding for ROW, moved CN to a year outside of the current TIP. There are no changes to the scope of work planned for this project. The substantially complete date has not changed. CN has been pushed outside of our current TIP, but is still planned to be completed by 2030. ROW amounts have been more accurately described and funds given to this phase.


Previously Approved Version

1173760 (Ver 6) 22-04

Title: Quality of Place / Added Travel Lanes at Kennedy Ave (Phase 4) Route: N/A

Description: Kennedy Ave at intersection with Junction Ave, going South through to 67th St and then South to US 30. The added lanes will connect Kennedy Ave to US 30 and create a safer roadway for drivers and pedestrians.

Project Type: Existing Roadway Capacity Improveme AQ Exempt: Non-Exempt District: LaPorte

County: Lake Limits: From Junction Ave to US 30 of Distance (mile) 0.83

Narrative: moved CN out of TIP, added ROW.


Region: Northwestern MPO Lead Agency: Schererville

FED FY

REVENUE SOURCE

PE

RW

CN

CE

TOTAL

2025

Local Fund

$0

$382,750

$0

$0

$382,750

2025

STBG Chicago UZA

$0

$1,531,000

$0

$0

$1,531,000

<2022

Prior

$548,664

$0

$0

$0

$548,664

>2026

Beyond

$0

$0

$6,709,000

$0

$6,709,000

2022-2026 TOTAL

$0

$1,913,750

$0

$0

$1,913,750

ALL YEARS TOTAL

$548,664

$1,913,750

$6,709,000

$0

$9,171,414


2101141 (Ver 6) 22-08 STATUS Programmed FEDERAL

Title: Multi use trail from transit parking lot to downtown Route: N/A

Description: Provide a multi-use trail connection within our TOD, connecting the Chicago Dash stop to downtown.

Project Type: Bicycle Enhancement AQ Exempt: Exempt District: LaPorte

County: Porter Limits:

Narrative: Added TA funds to this project and substansially increased CN funding.


Region: Northwestern MPO Lead Agency: Valparaiso

FED FY

REVENUE SOURCE

PE

RW

CN

CE

TOTAL

2022

Federal Special

$118,300

$0

$0

$0

$118,300

2022

Local Fund

$39,575

$15,000

$0

$0

$54,575

2024

Federal Special

$0

$0

$1,441,405

$0

$1,441,405

2024

Local Fund

$0

$0

$904,702

$0

$904,702

2024

TAP Chicago UZA

$0

$0

$2,177,403

$0

$2,177,403

2022-2026 TOTAL

$157,875

$15,000

$4,523,510

$0

$4,696,385

ALL YEARS TOTAL

$157,875

$15,000

$4,523,510

$0

$4,696,385


Previously Approved Version

2101141 (Ver 5) 22-31

Title: Multi use trail from transit parking lot to downtown Route: N/A

Description: Provide a multi-use trail connection within our TOD, connecting the Chicago Dash stop to downtown.

Project Type: Bicycle Enhancement AQ Exempt: Exempt District: LaPorte

County: Porter Limits:

Narrative: Added RW phase to show estimated total project costs.


Region: Northwestern MPO Lead Agency: Valparaiso

FED FY

REVENUE SOURCE

PE

RW

CN

CE

TOTAL

2022

Federal Special

$118,300

$0

$0

$0

$118,300

2022

Local Fund

$39,575

$15,000

$0

$0

$54,575

2024

Federal Special

$0

$0

$1,918,104

$0

$1,918,104

2024

Local Fund

$0

$0

$479,526

$0

$479,526

2022-2026 TOTAL

$157,875

$15,000

$2,397,630

$0

$2,570,505

ALL YEARS TOTAL

$157,875

$15,000

$2,397,630

$0

$2,570,505


1902686 (Ver 7) 22-17 STATUS Programmed FEDERAL

Title: Roundabout; Valparaiso- Campbell & Lincoln Ave, Route: SR 130

Description: Transformative intersection Improvement. Roundabout at Campbell & Lincolnway. The total estimated cost for this project is $2,900,000 and is expected to be completed by 2030.

Project Type: Intersection or Intersection Groups AQ Exempt: Exempt District: LaPorte

County: Porter Limits: Nearest Crossstreet: Campbell

Narrative: CN was mistakenly deleted. This amendment brings CN back into where it was FY 2025.


Region: Northwestern MPO Lead Agency: Valparaiso

FED FY

REVENUE SOURCE

PE

RW

CN

CE

TOTAL

2022

CMAQ Chicago UZA

$146,679

$0

$0

$0

$146,679

2022

Local Fund

$36,670

$0

$0

$0

$36,670

2024

CMAQ Chicago UZA

$0

$400,000

$0

$0

$400,000

2024

Local Fund

$0

$100,000

$0

$0

$100,000

2025

CMAQ Chicago UZA

$0

$0

$2,216,121

$0

$2,216,121

2025

Local Fund

$0

$0

$554,030

$0

$554,030

<2022

Prior

$386,351

$0

$0

$0

$386,351

2022-2026 TOTAL

$183,349

$500,000

$2,770,151

$0

$3,453,500

ALL YEARS TOTAL

$569,700

$500,000

$2,770,151

$0

$3,839,851


Previously Approved Version

1902686 (Ver 6) 22-00

Title: Roundabout; Valparaiso- Campbell & Lincoln Ave, Route: SR 130

Description: Transformative intersection Improvement. Roundabout at Campbell & Lincolnway. The total estimated cost for this project is $2,900,000 and is expected to be completed by 2030.

Project Type: Intersection or Intersection Groups AQ Exempt: Exempt District: LaPorte

County: Porter Limits: Nearest Crossstreet: Campbell

Narrative: Reduce funding to match Spending Plan CN chosen in NOFA 2020


Region: Northwestern MPO Lead Agency: Valparaiso

FED FY

REVENUE SOURCE

PE

RW

CN

CE

TOTAL

2024

CMAQ Chicago UZA

$0

$400,000

$0

$0

$400,000

2024

Local Fund

$0

$100,000

$0

$0

$100,000

2025

CMAQ Chicago UZA

$0

$0

$2,216,121

$0

$2,216,121

2025

Local Fund

$0

$0

$554,030

$0

$554,030

<2022

Prior

$386,351

$0

$0

$0

$386,351

2022-2026 TOTAL

$0

$500,000

$2,770,151

$0

$3,270,151

ALL YEARS TOTAL

$386,351

$500,000

$2,770,151

$0

$3,656,502



Prior

Northwestern MPO TIP SUMMARY BY LEAD AGENCY

FY 2022 FY 2023 FY 2024 FY 2025 FY 2026


FY 2027


Beyond Total


INDOT

$0

$0

$13,125,740

$6,388,000

$340,000

$0

$80,776,682

$80,776,682

$100,630,422

La Porte

$0

$0

$0

$250,000

$0

$0

$0

$0

$250,000

Michigan City

$0

$0

$0

$649,019

$0

$4,917,598

$3,641,850

$3,641,850

$9,208,467

Schererville

$1,097,328

$0

$0

$0

$3,827,500

$0

$13,418,000

$13,418,000

$18,342,828

Valparaiso

$772,702

$529,099

$0

$7,921,140

$5,540,302

$0

$0

$0

$14,763,243

TOTAL $1,870,030

$529,099

$13,125,740

$15,208,159

$9,707,802

$4,9

17,598

$97,836,532

$97,836,532

$143,194,960


Email to the ICG including the following parties was sent 12/9/2022. Concurrence is as follows:

FHWA concurrence date 12/16/2022 EPA concurrence date 12/16/2022 IDEM concurrence date12/16/2022 INDOT concurrence date12/16/2022 FTA concurrence date 12/16/2022

Approval is given with Concurrence by No Response.

Transportation Improvement Program Fiscal Year 2022 - 2026 Amendment #22-08.5 22 Projects Listed


NIR-22-027

(Ver 5) 22-08.5

STATUS

Programmed FEDERAL